Professional Documents
Culture Documents
Presentation From Mr. Prasoon Gargava For STTP
Presentation From Mr. Prasoon Gargava For STTP
Presentation From Mr. Prasoon Gargava For STTP
Stakeholders Perspective
PRASOON GARGAVA
Regional Director
Central Pollution Control Board
Vadodara
Pollution
Control
Board
Industry/
Common Scheduled
Environmental Environmental
Audit Auditor
Infrastructure
Facility
Receptors of
Environmental
impact
STAKEHOLDERS’ ROLE
✓ Clarity on goals/objectives.
• Work platform
• Clearance Zone
• Additional Requirements
Location of Sampling Port
• Platform- one 220 volt, 15 amp, single phase AC circuit with a grounded, two
receptacle weather proof outlet
• Stack base- one 220 volt, 15 amp, single phase AC circuit with a grounded,
two receptacle weather proof