Monthly S-Curve for KAFD-297 Design & Build of Area 6 Stage 1 Utility Tunnel &

Infra Works
12.00% 120.00%

10.09%

9.70%
9.31%

9.24%
10.00% 100.00% 100.00%
97.69%
93.90%
90.10%
84.48%
8.00% 80.00%
75.24%

6.53%
65.54%

5.62%
5.50%

5.29%
6.00% 59.02% 60.00%

4.87%
4.86%
54.15%
49.29%
46.40%

3.80%

3.79%
43.53%
40.38%

3.22%
4.00% 40.00%

3.15%
37.17%

2.89%
2.87%
31.87%

2.31%
1.97%

1.48%

21.78%
1.27%

2.00% 20.00%
1.00%
0.55%

12.47%
0.39%
0.22%
0.08%

6.97%
4.48% 5.49%
0.00% 0.08% 0.30% 0.85% 1.24% 2.51% 0.00%

Planned budgeted % comm Planned budgeted %