GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

A. STRUCTURAL WORKS
Site Clearance, Layout and Site
1.
Mobilization.

Site Clearing including removal of


outgrowth, shrubs/hedges and
other obstructions above or
underground, stacking of useful
material as directed, complete with
L.S - - - - -
layout and marking, signboard,
security fence and other temporary
facilities/ fixtures, all to be
dismantled as directed by consultant
all complete.

3. Pile Works - - - -
Pile drilling work for foundation of
10 m long and following diameter
with the desired technique and
equipment in the soil bed including
Betonies as per drawing - - - -
specification and instruction of
consultant.

3.1 600 mm dia Rm 8,703.07 256.77 2,234,687.28 - - - -

3.2 800 mm dia Rm 13,359.95 772.50 10,320,561.38 - - - -

4. Earthwork - - - - -

4.1 Earthwork in Excavation - - - - -

...................Submitted By ...................Checked By ...................Approved By


Page 2 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

E/W in excavation inclusive of


shoring and protection of sides of
property (if any) and dumping,
surplus waste along with trenching,
dewatering all necessary as per - - - - -
design, specification, & instruction
of Consultant, all complete
including the soil dumping outside
the site by transportation.

4.1.1 upto 4 m depth Cu.m 529.20 6,043.11 3,198,013.81 - - - - -

4.1.2 from 4 to 7.5 m depth Cu.m 529.20 4,595.68 2,432,033.86 - - - - -

4.1.3 from 7.5 to 11 m depth Cu.m 529.20 7,211.30 3,816,219.96 - - - - -

4.1.4 from 11 to 14 m depth Cu.m 529.20 1,465.58 775,584.94 - - - - -

4.2 Earthwork in Back Filling wrok - - - - -


E/W in back filling work in
necessary proper compaction with
water sprinkle on layer by layer for
compaction as per desigh, Cu.m 740.88 1,173.14 869,155.96 - - - -
specification & instruction of
consultant all complete.

5.00 Brick soling work - - - - -


laying single layer flar chimney
made brick soling supplie by owner
in line and level as per drawing
specification and instruction of sq m 968.40 9.94 9,625.90 - - - -
consultant all complete

6. Boulder Soling Work - - - - -

...................Submitted By ...................Checked By ...................Approved By


Page 3 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.
Laying 200 mm thick stone boulder
soling with the material provided by
the owner including proper
compaction and filling the gaps with
aggregate sand mix and the Cu.m 7,056.00 378.35 2,669,637.60 - - - - -
compactor if necessary to get the
compaction as per drawing,
specification

...................Submitted By ...................Checked By ...................Approved By


Page 4 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

7. Concreting in Foundation - - - - -

P.C.C. in foundation with cement,


sand, stone ballast 38 mm & down
except material including mixing,
laying finishing to approved line - - - - -
and level all complete as per
drawing, specification and
instruction of the Consultant.

7.1 P.C.C. (1:3:6) all complete. Cu.m 11,889.36 128.35 1,525,999.36 - - - - -

8. P.C.C for R.C.C Work - - - - -


Plain cement concrete for R.C.C
shear wall, column, beam, slabs,
lintels, wall footing and all types of
R.C.C works with cement, sand, and
stone ballast 20mm & down with the
material supplied by the owner
including mixing, laying, finishing
& curing as per drawing, - - - - -
specification and instruction of
Consultant. All concreting work will
be done by batching plant and the
concrete pump.

P.C.C M20 Grade Concreting Cu.m 15,207.00 1.64 24,939.48 - - - -

8.10 P.C.C M25 Grade Concreting Cu.m 16,230.00 6,954.81 112,876,566.30 278.35 4,517,669.17 - - 278.35 4,517,669.17

8.20 P.C.C M30 Grade Concreting Cu.m 20,459.50 280.34 5,735,616.23 - - - - - -

8.30 P.C.C M35 Grade Concreting Cu.m 22,166.50 48.16 1,067,538.64 - - - - - -

8.40 P.C.C M40 Grade Concreting Cu.m 27,126.50 581.96 15,786,537.94 - - - - - -

...................Submitted By ...................Checked By ...................Approved By


Page 5 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

9. Form Work - - - - - - -
Form work, centering and
shuttering with standard quality
water proof ply wood for all kinds
of R.C.C. works including all
necessary propping, scaffolding,
sq m 1,054.48 28,187.52 29,723,176.09 1,483.98 1,564,822.01 - - 1,483.98 1,564,822.01
staging, supporting and necessary
hooks, screws, clamps, nuts, bolt,
etc. all complete.

10. Steel Reinforcement -


TMT steel work with the steel
supplied by the owner including
straightening, cleaning, cutting,
bending with 20 SWG annealed
- - - - - - -
tying wire and fixing in position
drawing, specification & instruction
of the Consultant.

10.10 HYSD Fe 500 Grade MT 154,000.00 1,263.11 194,518,940.00 53.01 8,163,605.48 - - 53.01 8,163,605.48

...................Submitted By ...................Checked By ...................Approved By


Page 6 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

13. HYSD Fe 500 Grade - - - - -

N. Plaster Works -

Supply and applying exterior


texture paints over outer AAC wall
over plaster surface with coats of
sq m -
paints to give an even and uniform
shade as specification and
instruction of consultant

At Service room (Inner) 2,500.00 6,974.00 -

At outer Wall ( AAC Block wall) 762.00 -

-
B. FLOORING WORK

-
3.00 Porcelian Tile Work

Providing and laying single charge


plain white 600x600 mm porcelian
tile for shop floor fixed with cement
mortar (1:6) as required upto 40 mm
a thick on shop floor and joint Sq m 3,700.00 14,707.00 -
finished with joint filled with tile
grount of approved color as per
drawing, specification and
instruction of the consultant.

Q Additional Bill -
Straightening and Binding of old
1.00 existing rebar as instructed by the -
consultant
2.00 Site Clearance work -
Dismantaling of old pile by using
3.00 -
breaker
Cutting and Collection of old rebar
4.00 -
from different location of site
5.00 Scaffollding -

...................Submitted By ...................Checked By ...................Approved By


Page 7 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

ABSTRACT OF COST OF FOUNDATION


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
As per BOQ Upto date As Per Previous Bill As Per This Bill
Unit Rate
S.No. Item Unit Remarks
NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs. Quantity Amount NRs.

Scaffolding work with platform


(Providing and laying of Double sq m 2,238.08 -
scaffolding with platforms using MS
pipe, Coupler and platform woor 3"*4"
6.00 Water proofing sq m -
water proofing with 2 layer crystaline sq m 1,151.32 -
coating and 50 micron plastic
A. Total= 14,246,096.66 14,246,096.66

...................Submitted By ...................Checked By ...................Approved By


Page 8 of 57

GWALLEK NIRMAN SEWA Pvt Ltd


BAITADI, NEPAL

Quantity summary sheet


Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Balkhu, Kathmandu
Bill No: 1
I Block Structure

As per BOQ Upto date As Per Previous Bill As Per This Bill
S.No. Item Unit Remarks
Quantity Quantity Quantity Quantity

I Block
8. P.C.C for R.C.C Work -
Plain cement concrete for R.C.C shear wall, column, beam, slabs, lintels, wall
footing and all types of R.C.C works with cement, sand, and stone ballast
20mm & down with the material supplied by the owner including mixing,
laying, finishing & curing as per drawing, specification and instruction of
Consultant. All concreting work will be done by batching plant and the
concrete pump.

P.C.C M20 Grade Concreting Cu.m 1.64 -

8.10 P.C.C M25 Grade Concreting Cu.m 6,954.81 278.35 278.35

8.20 P.C.C M30 Grade Concreting Cu.m 280.34 -

8.30 P.C.C M35 Grade Concreting Cu.m 48.16 -

8.40 P.C.C M40 Grade Concreting Cu.m 581.96 -

9. Form Work -
Form work, centering and shuttering with standard quality water proof ply
wood for all kinds of R.C.C. works including all necessary propping,
scaffolding, staging, supporting and necessary hooks, screws, clamps, nuts, sq m 28,187.52 1,483.98 1,483.98
bolt, etc. all complete.
10. Steel Reinforcement
TMT steel work with the steel supplied by the owner including straightening,
cleaning, cutting, bending with 20 SWG annealed tying wire and fixing in
position drawing, specification & instruction of the Consultant. -

HYSD Fe 500 Grade MT 1,263.11 53.01 53.01

13. HYSD Fe 500 Grade -

...................Submitted By ...................Checked By ...................Approved By


Page 9 of 57

GWALLEK NIRMAN SEWA Pvt Ltd.


Baitadi, Nepal

BAR BENDING SCHEDULE


Total Wt. Ton.
Total Wt.= 6486.92 2285.23 0.00 0.00 596.22 9466.63 3462.44 0.00 22.30
Unit wt.= 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No. Two
Total Length (m)
Ø of Cut Length/pc
S.N. Description Bar Details dimensions (m) No. Remark
Bar,mm (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

TMT steel work with the steel supplied by the owner including straightening, cleaning, cutting,
10. bending with 20 SWG annealed tying wire and fixing in position drawing, specification &
instruction of the Consultant.
10.1 HYSD Fe 500 Grade
BLOCK K (between grid 26 & 37)
A Column (from lvl -14.7 to lvl --7.55)
1 Column K-C2 ( Column size 1m*1m) (5 Nos of Column) 4.050 28 80.0 8.95 716.32
16*1=16 nos of Vertical rebar of 25mm dia (Type a) a 4.454

0.450

0
16 *1=16 nos of Vertical rebar of 25mm dia (Type b)

b 7.105 25 80.0 7.56 604.40

0.450

Ring 0.10
Type 1 0.94 10 360.0 3.96 1425.60
72 nos of 10mm dia main ring
. 0.940
Type2
72 nos of 8mm dia ring 0.08

0.651 8 360.0 2.76 995.04

0.651
Type 3 0.08
72*2 =144 nos of 8mm dia ring 0.48 8 720.0 3.00 2160.00 `
0.940
Type 4 0.08 0.08 8 2880.0 1.10 3168.00
72*8=576 nos of 8mm dia ring 0.940

.........................Submitted By .......................Checked By .......................Approved By


Page 10 of 57

Bill No. Two


Total Length (m)
Ø of Cut Length/pc
S.N. Description Bar Details dimensions (m) No. Remark
Bar,mm (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

2.0 Column K-C3 ( Column size 1m*1M) (5 Nos of Column) 3.975 25 96.0 8.81 845.28
16*3=48 nos of Vertical rebar of 28mm dia (Type b) a 4.380

0.450

16*3=48 nos of Vertical rebar of 25mm dia (Type a)

b 7.105 25 96.0 7.56 725.28

0.450

Ring 0.10
Type 1 0.94 10 432.0 3.96 1710.72
72*3=216 nos of 10mm dia main ring
. 0.940
Type2
72*3=216 nos of 8mm dia ring 0.08
0.651 8 432.0 2.76 1194.05
0.651
Type 3 0.08
72*3 =432 nos of 8mm dia ring 0.48 8 864.0 3.00 2592.00
0.940
Type 4 0.08 0.08 8 3456.0 1.10 3801.60
72*8=1728 nos of 8mm dia ring 0.940

2.0 Column K-C4 ( Column size 1m*1m) (2 Nos of Column) 3.975 25 32.0 8.81 281.76
16*3=48 nos of Vertical rebar of 28mm dia (Type b) a 4.380

0.450

16*3=48 nos of Vertical rebar of 25mm dia (Type a)

b 7.105 20 32.0 7.56 241.76

0.450

Ring 0.10
Type 1 0.94 10 144.0 3.96 570.24
72*3=216 nos of 10mm dia main ring
. 0.940
Type2

.........................Submitted By .......................Checked By .......................Approved By


Page 11 of 57

Bill No. Two


Total Length (m)
Ø of Cut Length/pc
S.N. Description Bar Details dimensions (m) No. Remark
Bar,mm (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

72*3=216 nos of 8mm dia ring 0.08


0.651 8 144.0 2.76 398.02
0.651
Type 3 0.08
72*3 =432 nos of 8mm dia ring 0.48 8 288.0 3.00 864.00
0.940
Type 4 0.08 0.08 8 1152.0 1.10 1267.20
72*8=1728 nos of 8mm dia ring 0.940

.........................Submitted By .......................Checked By .......................Approved By


GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No. Two
S.No Description Unit Nos Length Breadth Height Quantity Remarks
Formwork (Form work, centering and
shuttering with standard quality water
proof ply wood for all kinds of R.C.C.
9 works including all necessary propping,
scaffolding, staging, supporting and
necessary hooks, screws, clamps, nuts, bolt,
etc. all complete.)

A Form Work of K Block Column From lvl -13.5 to Slab Lvl -7.55)
BLOCK K (between grid 26 & 37)

1 Existing Column (E29,E32,E37,E26) sq m 4 1.000 1.000 1.250 20.00

New Column (B26,B29,B32,B37,C29, 5.8=5.95-


3 sq m 8 1.000 1.000 5.800 185.60 0.15
C32,C37,C26)

New column towards shear wall


4 sq m 4 1.000 0.650 5.800 53.36
(Column A26, A29, A32, A37)
Total 258.960 sqm
GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill no: Two
S.No Description Units Nos Length Breadth Height Quantity Remarks

PCC for RCC work (Plain cement concrete for R.C.C shear
wall, column, beam, slabs, lintels, wall footing and all types of
R.C.C works with cement, sand, and stone ballast 20mm &
8. down with the material supplied by the owner including
mixing, laying, finishing & curing as per drawing,
specification and instruction of Consultant. All concreting
work will be done by batching plant and the concrete pump.)

8.3 P.C.C. M25 Grade Concreting


BLOCK K (between grid 26 & 37)
A From lvl -13.5 to lvl -7.55
New Column
1 (A26,A29,A32,A37,B26,B29,B32, cu m 12 1.000 1.000 5.800 69.60
B37,C26,C29,C32,C37)
2 Existing Column (E,26E29,E32,E37) cu m 4 1.000 1.000 1.150 4.60
Total 74.20 cu m
Page 14 of 57

GWALLEK NIRMAN SEWA Pvt Ltd.


Baitadi, Nepal

BAR BENDING SCHEDULE


Total Wt.
Ton.
Total Wt.= 0.00 0.00 3614.65 4991.55 0.00 0.00 0.00 0.00 8.61
Unit wt.= 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No : Two
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
10. Steel Reinforcement

TMT steel work with the steel


supplied by the owner
including straightening,
cleaning, cutting, bending
with 20 SWG annealed tying
wire and fixing in position
drawing, specification &
instruction of the Consultant.

HYSD Fe 500 Grade


BLOCK K (between grid 26 & 37)

BLOCK I (-13600mm LEVEL


to -7550mm LEVEL)

Along Grid A
VERTICAL OUTER
BAR(between Grid 26 to 37)

2.95

...................Submitted By ...................Checked By ...................Approved By


Page 15 of 57

Bill No : Two
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
2.95 0.300 16 124.0 3.25 403.00

(A)12mm.∅ bars @ 200 C/C


7.1 0.300 12 124.0 7.40 917.60
Lap for
(A)12mm.∅ bars @ 200 C/C 0.600 12 124.0 0.60 74.40
(1 position)

VERTICAL INNER BAR


0.600

7.1 0.300 12 165.0 8.00 1320.00

Lap for
0.600 12 165.0 0.60 99.00
(1 position)

HORIZONTAL BAR
(F) 16MM dia bar @ 200 C/C 14.274 16 74.0 14.27 1056.28
lap
3 position 0.6 16.0 222 0.60 133.20

Along Grid 37
VERTICAL OUTER
BAR(between Grid 29 to 37)

2.95 0.300 16 85.0 3.25 276.25

(A)12mm.∅ bars @ 200 C/C


7.1 0.300 12 85.0 7.40 629.00
Lap for
(A)12mm.∅ bars @ 200 C/C 0.600 12 85.0 0.60 51.00

...................Submitted By ...................Checked By ...................Approved By


Page 16 of 57

Bill No : Two
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
(1 position)

VERTICAL INNER BAR


0.600

7.1 0.300 12 114.0 8.00 912.00

Lap for
0.600 12 114.0 0.60 68.40
(1 position)

HORIZONTAL BAR
(F) 16MM dia bar @ 200 C/C 16.884 16 74.0 16.88 1249.42
lap
1 position 0.6 16.0 74 0.60 44.40

...................Submitted By ...................Checked By ...................Approved By


GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No : Two
S.No Description Nos Length Breadth Height Quantity Remarks
Remaining portion of I block
9 Form Work
Form work, centering and shuttering
with standard quality water proof ply
wood for all kinds of R.C.C. works
including all necessary propping,
scaffolding, staging, supporting and
necessary hooks, screws, clamps, nuts,
bolt, etc. all complete.

9.1 Formwork
BLOCK K (between grid 26 & 37)
-13500mm to -7550 mm
outer wall
Along Grid A (Between grid 2m from grid 1 24.525 5.95 145.92375
26-grid 37(column face)

Along Grid 37 (Between E(4.04m from grid 1 16.884 5.95 100.4598


E toward Grid C) And grid A(column face)
Inner wall
1 Between grid 32/37 1 4.618 5.2 24.0136
2 Between grid 29/32 1 5.407 5.2 28.1164
3 Between grid 26/29 1 9.502 5.2 49.4104
4 Between grid 24a/26 1 2 5.2 10.4
5 Between grid A/B 1 3.523 5.2 18.3196
6 Between grid B/C 1 6.003 5.2 31.2156
7 Between grid C/E 1 4.359 5.2 22.6668

Total 430.53
GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill no: Two
SN Description Units Nos Length Breadth Height Quantity Remarks
8. P.C.C for R.C.C Work
Plain cement concrete for R.C.C
shear wall, column, beam, slabs,
lintels, wall footing and all types of
R.C.C works with cement, sand, and
stone ballast 20mm & down with the
material supplied by the owner
including mixing, laying, finishing &
curing as per drawing, specification
and instruction of Consultant. All
concreting work will be done by
using batching plant and the
concrete pump.

8.2 P.C.C. M25 Grade Concreting Total 69.856 cu m


Concrete Grade M25 Design Mix 300 ml
Chemical
BLOCK K (between grid 26 & 37)
SHEAR WALL FROM -13500mm
level to -7550 mm Level

Shear wall
1 Between grid 32/37 1 4.618 0.35 5.8 9.37454
2 Between grid 29/32 1 5.407 0.35 5.8 10.97621
3 Between grid 26/29 1 8.502 0.35 5.8 17.25906
4 Between grid 24a/26 1 2 0.35 5.8 4.06
5 Between grid A/B 1 3.523 0.35 5.8 7.15169
6 Between grid B/C 1 6.003 0.35 5.8 12.18609
7 Between grid C/E 1 4.359 0.35 5.8 8.84877
Page 19 of 57

GWALLEK NIRMAN SEWA Pvt Ltd.


Baitadi, Nepal

BAR BENDING SCHEDULE


Total Wt.
Ton.
Total Wt.= 77.58 2518.62 625.33 0.00 2020.42 8487.94 0.00 0.00 13.73
Unit wt.= 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Reinforcement (TMT steel work with the steel supplied


by the owner including straightening, cleaning, cutting,
10 bending with 20 SWG annealed tying wire and fixing in
position drawing, specification & instruction of the
Consultant.)
K block
Rebar of main beam
At lvl -7.55 level
1 Along Grid A-A
LONGITUDINAL BARS

0 24.500 0.3 25 2 24.80 49.60


Top 25mm 2 nos T1 Bars

Top 25 mm 3 nos T2 Bars 0 24.500 0.3 25 3 24.80 74.40

Bottom 25 mm 2 nos B1 Bars 0 24.500 0.30 25 2 24.80 49.60

Bottom 25 mm 3 nos B2 Bars 0 24.500 0.30 25 3 24.80 74.40

...................Submitted By ...................Checked By ...................Approved By


Page 20 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

LAP (50D) FOR


Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))
Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50
(2 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00
(2 position))
Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50
(2 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.350 8 87 2.26 196.62
0.700

STIRRUPS S3
Stirrups - 10 Ø @ 100 mm C/C 0.1 0.350 10 55 2.30 126.50
0.700

STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 63 2.30 144.90
0.700

EXTRA BARS
At junction 26
Top 5.725 20 4 5.73 22.90

Bottom 5.725 20 2 5.725 11.45

At junction 29

...................Submitted By ...................Checked By ...................Approved By


Page 21 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Top 5.024 20 4 5.02 20.10

Bottom 5.024 20 3 5.024 15.07

At junction 32
Top 4.050 20 4 4.05 16.20

Bottom 4.050 20 4 4.050 16.20

At junction 37
Top 0.3 2.385 20 5 2.685 13.42

Bottom 0.3 2.385 20 4 2.685 10.74

SIDE BARS
24.500 12 4 24.500 98.00

LAP FOR SIDE BARS


0.600 12 8 0.600 4.80

1 Along Grid B-B


LONGITUDINAL BARS

0 24.500 0.3 25 2 24.80 49.60


Top 25mm 2 nos T1 Bars

Top 25 mm 3 nos T2 Bars 0 24.500 0.3 25 3 24.80 74.40

Bottom 25 mm 2 nos B1 Bars 0 24.500 0.30 25 2 24.80 49.60

...................Submitted By ...................Checked By ...................Approved By


Page 22 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Bottom 25 mm 3 nos B2 Bars 0 24.500 0.30 25 3 24.80 74.40


LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))
Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50
(2 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00
(2 position))
Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50
(2 position))
STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 248 2.30 570.40
0.700

EXTRA BARS
At junction 26
Top 5.725 20 5 5.73 28.63

Bottom 5.725 20 2 5.725 11.45

At junction 29
Top 5.024 20 5 5.02 25.12

Bottom 5.024 20 2 5.024 10.05

At junction 32
Top 4.050 20 5 4.05 20.25

Bottom 4.050 20 3 4.050 12.15

At junction 37

...................Submitted By ...................Checked By ...................Approved By


Page 23 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Top 0.3 2.385 20 5 2.685 13.42

Bottom 0.3 2.385 20 4 2.685 10.74

SIDE BARS
24.500 12 4 24.500 98.00

LAP FOR SIDE BARS


0.600 12 8 0.600 4.80

1 Along Grid C-C


LONGITUDINAL BARS

0 24.500 0.3 25 2 24.80 49.60


Top 25mm 2 nos T1 Bars

Top 25 mm 3 nos T2 Bars 0 24.500 0.3 25 3 24.80 74.40

Bottom 25 mm 2 nos B1 Bars 0 24.500 0.30 25 2 24.80 49.60

Bottom 25 mm 3 nos B2 Bars 0 24.500 0.30 25 3 24.80 74.40


LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))
Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50
(2 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00
(2 position))
Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50
(2 position))
STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 248 2.30 570.40

...................Submitted By ...................Checked By ...................Approved By


Page 24 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

0.700

EXTRA BARS
At junction 26
Top 5.725 25 4 5.73 22.90

Bottom 5.725 20 2 5.725 11.45

At junction 29
Top 5.024 25 4 5.02 20.10

Bottom 5.024 20 2 5.024 10.05

At junction 32
Top 4.050 20 5 4.05 20.25

Bottom 4.050 20 3 4.050 12.15

At junction 37
Top 0.3 2.385 20 5 2.685 13.42

Bottom 0.3 2.385 20 4 2.685 10.74

SIDE BARS
24.500 12 4 24.500 98.00

LAP FOR SIDE BARS


0.600 12 8 0.600 4.80

1 Along Grid E-E

...................Submitted By ...................Checked By ...................Approved By


Page 25 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

LONGITUDINAL BARS

0 24.500 0.3 25 2 24.80 49.60


Top 25mm 2 nos T1 Bars

Top 25 mm 3 nos T2 Bars 0 24.500 0.3 25 3 24.80 74.40

Bottom 25 mm 2 nos B1 Bars 0 24.500 0.30 25 2 24.80 49.60

Bottom 25 mm 3 nos B2 Bars 0 24.500 0.30 25 3 24.80 74.40


LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))
Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50
(2 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00
(2 position))
Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50
(2 position))
STIRRUPS S3
Stirrups - 10 Ø @ 100 mm C/C 0.1 0.350 10 106 2.30 243.80
0.700

STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 135 2.30 310.50
0.700

EXTRA BARS
At junction 26
Top 5.725 20 5 5.73 28.63

...................Submitted By ...................Checked By ...................Approved By


Page 26 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Bottom 5.725 20 2 5.725 11.45

At junction 29
Top 5.024 20 5 5.02 25.12

Bottom 5.024 20 2 5.024 10.05

At junction 32
Top 4.050 20 5 4.05 20.25

Bottom 4.050 20 3 4.050 12.15

At junction 37
Top 0.3 2.384 20 5 2.684 13.42

Bottom 0.3 2.384 20 4 2.684 10.74

SIDE BARS
24.500 12 4 24.500 98.00

LAP FOR SIDE BARS


0.600 12 8 0.600 4.80

5 Along Grid 26-26


LONGITUDINAL BARS
Top 25mm 2 nos T1 Bars 0.3 21.644 0.3 25 2 22.24 44.49

Top 25 mm 3 nos T2 Bars 0.3 21.644 0.3 25 3 22.24 66.73

...................Submitted By ...................Checked By ...................Approved By


Page 27 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Bottom 25 mm 2 nos B1 Bars 0.3 5.443 0.30 25 2 6.04 12.09


Between A and B only
Bottom 25 mm 3 nos B2 Bars 0.3 5.443 0.30 25 3 6.04 18.13
Between A and B only

Bottom 25 mm 2 nos B1 Bars 0.3 17.122 0.30 25 2 17.72 35.44


Between B and E only

Bottom 25 mm 3 nos B2 Bars 0.3 17.122 0.30 25 3 17.72 53.17


Between B and E only
LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))

Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50


(2 position))

Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00


(2 position))

Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50


(2 position))
STIRRUPS S3
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.550 10 61 2.20 134.20
0.450

STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 158 2.30 363.40
0.700

EXTRA BARS
At junction A
Top 2.110 20 2 2.41 4.82

...................Submitted By ...................Checked By ...................Approved By


Page 28 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
0.3
Bottom
2.110 20 2 2.41 4.82
0.3
At junction B
Top 3.925 20 4 3.93 15.70

Bottom towards A 2.150 0.30 20 2 2.45 4.90

Bottom towards C 2.775 0.30 20 2 3.07 6.15

At junction C
Top 5.100 20 5 5.100 25.50

Bottom 5.100 20 2 5.100 10.20

At junction E
Top 3.285 25 4 3.585 14.34
0.3
Bottom 3.285 20 2 3.585 7.17
0.3
SIDE BARS
17.122 12 2 17.122 34.24

17.122 12 2 17.122 34.24

LAP FOR SIDE BARS


0.600 12 4 0.600 2.40

0.600 12 4 0.600 2.40

5 Along Grid 29-29


LONGITUDINAL BARS

...................Submitted By ...................Checked By ...................Approved By


Page 29 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Top 25mm 2 nos T1 Bars 0.3 21.644 0.3 25 2 22.24 44.49

Top 25 mm 3 nos T2 Bars 0.3 21.644 0.3 25 3 22.24 66.73

Bottom 25 mm 2 nos B1 Bars 0.3 5.443 0.30 25 2 6.04 12.09


Between A and B only
Bottom 20 mm 3 nos B2 Bars 0.3 5.443 0.30 20 3 6.04 18.13
Between A and B only

Bottom 25 mm 2 nos B1 Bars 0.3 17.122 0.30 25 2 17.72 35.44


Between B and E only

Bottom 25 mm 3 nos B2 Bars 0.3 17.122 0.30 25 3 17.72 53.17


Between B and E only
LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))

Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50


(2 position))

Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00


(2 position))

Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50


(2 position))
STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.550 10 48 2.20 105.60
0.450

STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 191 2.30 439.30
0.700

...................Submitted By ...................Checked By ...................Approved By


Page 30 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

EXTRA BARS
At junction A
Top 2.110 20 3 2.41 7.23
0.3
Bottom
2.110 20 2 2.41 4.82
0.3
At junction B
Top 3.925 20 5 3.93 19.63

Bottom towards A 2.082 0.30 20 2 2.38 4.76

Bottom towards C 2.735 0.30 20 2 3.03 6.07

At junction C
Top 5.100 25 4 5.100 20.40

Bottom 5.100 20 2 5.100 10.20

At junction E
Top 3.285 25 4 3.585 14.34
0.3
Bottom 3.285 20 2 3.585 7.17
0.3
SIDE BARS
17.122 12 2 17.122 34.24

17.122 12 2 17.122 34.24

LAP FOR SIDE BARS


0.600 12 4 0.600 2.40

0.600 12 4 0.600 2.40

...................Submitted By ...................Checked By ...................Approved By


Page 31 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

5 Along Grid 32-32


LONGITUDINAL BARS
Top 25mm 2 nos T1 Bars 0.3 21.644 0.3 25 2 22.24 44.49

Top 25 mm 3 nos T2 Bars 0.3 21.644 0.3 25 3 22.24 66.73

Bottom 25 mm 2 nos B1 Bars 0.3 5.443 0.30 25 2 6.04 12.09


Between A and B only
Bottom 20 mm 3 nos B2 Bars 0.3 5.443 0.30 20 3 6.04 18.13
Between A and B only

Bottom 25 mm 2 nos B1 Bars 0.3 17.122 0.30 25 2 17.72 35.44


Between B and E only

Bottom 25 mm 3 nos B2 Bars 0.3 17.122 0.30 25 3 17.72 53.17


Between B and E only
LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))

Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50


(2 position))

Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00


(2 position))

Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50


(2 position))
STIRRUPS S6
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.550 10 37 2.20 81.40
0.450

...................Submitted By ...................Checked By ...................Approved By


Page 32 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.275 10 37 1.65 61.05
0.450

STIRRUPS S5
Stirrups - 10 Ø @ 75 mm C/C 0.1 0.350 10 191 2.30 439.30
0.700

EXTRA BARS
At junction A
Top 2.110 20 3 2.41 7.23
0.3
Bottom
2.110 20 2 2.41 4.82
0.3
At junction B
Top 3.925 20 5 3.93 19.63

Bottom towards A 2.082 0.30 20 2 2.38 4.76

Bottom towards C 2.735 0.30 20 2 3.03 6.07

At junction C
Top 5.100 25 4 5.100 20.40

Bottom 5.100 20 2 5.100 10.20

At junction E
Top 3.285 25 4 3.585 14.34
0.3
Bottom 3.285 20 2 3.585 7.17
0.3
SIDE BARS

...................Submitted By ...................Checked By ...................Approved By


Page 33 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
17.122 12 2 17.122 34.24

17.122 12 2 17.122 34.24

LAP FOR SIDE BARS


0.600 12 4 0.600 2.40

0.600 12 4 0.600 2.40

5 Along Grid 37-37


LONGITUDINAL BARS
Top 25mm 2 nos T1 Bars 0.3 21.644 0.3 25 2 22.24 44.49

Top 25 mm 3 nos T2 Bars 0.3 21.644 0.3 25 3 22.24 66.73

Bottom 25 mm 2 nos B1 Bars 0.3 5.443 0.30 25 2 6.04 12.09


Between A and B only
Bottom 25 mm 3 nos B2 Bars 0.3 5.443 0.30 25 3 6.04 18.13
Between A and B only

Bottom 25 mm 2 nos B1 Bars 0.3 17.122 0.30 25 2 17.72 35.44


Between B and E only

Bottom 25 mm 3 nos B2 Bars 0.3 17.122 0.30 25 3 17.72 53.17


Between B and E only
LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 4 1.25 5.00
(2 position))

Top 25 mm 3 nos T2 Bars 1.250 25 6 1.25 7.50


(2 position))

Bottom 25 mm 2 nos B1 Bars 1.250 25 4 1.25 5.00

...................Submitted By ...................Checked By ...................Approved By


Page 34 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
(2 position))

Bottom 25 mm 3 nos B2 Bars 1.250 25 6 1.25 7.50


(2 position))
STIRRUPS S6
Stirrups - 10 Ø @ 100 mm C/C 0.1 0.550 10 37 2.20 81.40
0.450

Stirrups - 10 Ø @ 100 mm C/C 0.1 0.275 10 37 1.65 61.05


0.450

STIRRUPS S3
Stirrups - 10 Ø @ 100 mm C/C 0.1 0.350 10 153 2.30 351.90
0.700

EXTRA BARS
At junction A
Top 2.110 20 3 2.41 7.23
0.3
Bottom
2.110 20 3 2.41 7.23
0.3
At junction B
Top 3.925 20 5 3.93 19.63

Bottom towards A 2.082 0.30 20 3 2.38 7.15

Bottom towards C 2.735 0.30 20 3 3.03 9.10

At junction C
Top 5.100 20 5 5.100 25.50

...................Submitted By ...................Checked By ...................Approved By


Page 35 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Bottom 5.100 20 3 5.100 15.30

At junction E
Top 3.285 20 5 3.585 17.93
0.3
Bottom 3.285 20 2 3.585 7.17
0.3
SIDE BARS
17.122 12 2 17.122 34.24

17.122 12 2 17.122 34.24

LAP FOR SIDE BARS


0.600 12 4 0.600 2.40

0.600 12 4 0.600 2.40

...................Submitted By ...................Checked By ...................Approved By


Page 36 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

...................Submitted By ...................Checked By ...................Approved By


Page 37 of 57

30

...................Submitted By ...................Checked By ...................Approved By


Page 38 of 57

GWALLEK NIRMAN SEWA Pvt Ltd.


Baitadi, Nepal

BAR BENDING SCHEDULE


Total Wt.
Ton.
Total Wt.= 361.94 0.00 0.00 115.17 800.30 1747.40 0.00 0.00 3.02
Unit wt.= 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Reinforcement (TMT steel work with the steel supplied


by the owner including straightening, cleaning, cutting,
10 bending with 20 SWG annealed tying wire and fixing in
position drawing, specification & instruction of the
Consultant.)
K block
Rebar of secondary beam
At lvl -7.55 level
1 Along SB1
LONGITUDINAL BARS

0 24.525 0.9 25 2 25.42 50.85


Top 25mm 2 nos T1 Bars

Top 25 mm 1 nos T2 Bars 0 24.525 0.9 25 1 25.42 25.42

Bottom 25 mm 2 nos B1 Bars 0 24.525 0.90 25 2 25.42 50.85

Bottom 25 mm 2 nos B2 Bars 0 24.525 0.90 25 2 25.42 50.85

...................Submitted By ...................Checked By ...................Approved By


Page 39 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

LAP (50D) FOR


Top 25mm 2 nos T1 Bars 1.250 25 2 1.25 2.50
(1 position))
Top 25 mm 1 nos T2 Bars 1.250 25 1 1.25 1.25
(1 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 2 1.25 2.50
(1 position))
Bottom 25 mm 2 nos B2 Bars 1.250 25 2 1.25 2.50
(1 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.250 8 92 1.56 143.52
0.450

1 Along SB2
LONGITUDINAL BARS

0 24.525 0.9 25 2 25.42 50.85


Top 25mm 2 nos T1 Bars

Top 25 mm 1 nos T2 Bars 0 24.525 0.9 25 1 25.42 25.42

Bottom 25 mm 2 nos B1 Bars 0 24.525 0.90 25 2 25.42 50.85

Bottom 25 mm 2 nos B2 Bars 0 24.525 0.90 25 2 25.42 50.85


LAP (50D) FOR
Top 25mm 2 nos T1 Bars 1.250 25 2 1.25 2.50
(1 position))
Top 25 mm 1 nos T2 Bars 1.250 25 1 1.25 1.25
(1 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 2 1.25 2.50

...................Submitted By ...................Checked By ...................Approved By


Page 40 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

(1 position))
Bottom 25 mm 2 nos B2 Bars 1.250 25 2 1.25 2.50
(1 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.250 8 92 1.56 143.52
0.450

1 Along SB3
LONGITUDINAL BARS

0 24.525 0.9 20 2 25.42 50.85


Top 20mm 2 nos T1 Bars

Top 20 mm 1 nos T2 Bars 0 24.525 0.9 20 1 25.42 25.42

Bottom 25 mm 2 nos B1 Bars 0 24.525 0.90 25 2 25.42 50.85

Bottom 25 mm 1 nos B2 Bars 0 24.525 0.90 25 1 25.42 25.42


LAP (50D) FOR
Top 20mm 2 nos T1 Bars 1.000 20 2 1.00 2.00
(1 position))
Top 20 mm 1 nos T2 Bars 1.000 20 1 1.00 1.00
(1 position))
Bottom 25 mm 2 nos B1 Bars 1.250 25 2 1.25 2.50
(1 position))
Bottom 25 mm 1 nos B2 Bars 1.250 25 1 1.25 1.25
(1 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.250 8 92 1.56 143.52
0.450

...................Submitted By ...................Checked By ...................Approved By


Page 41 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Along SB11
LONGITUDINAL BARS

0.9 21.724 0.9 20 2 23.52 47.05


Top 20mm 2 nos T1 Bars

Top 20 mm 1 nos T2 Bars 0.9 21.724 0.9 20 1 23.52 23.52

Bottom 20 mm 2 nos B1 Bars 0.9 21.724 0.90 20 2 23.52 47.05

Bottom 20 mm 2 nos B2 Bars 0.9 21.724 0.90 20 2 23.52 47.05


LAP (50D) FOR
Top 20mm 2 nos T1 Bars 1.000 20 2 1.00 2.00
(1 position))
Top 20 mm 1 nos T2 Bars 1.000 20 1 1.00 1.00
(1 position))
Bottom 20 mm 2 nos B1 Bars 1.000 20 2 1.00 2.00
(1 position))
Bottom 20 mm 2 nos B2 Bars 1.000 20 2 1.00 2.00
(1 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.250 8 156 1.56 243.36
0.450

Along SB12
LONGITUDINAL BARS

...................Submitted By ...................Checked By ...................Approved By


Page 42 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

0.9 21.724 0.9 16 2 23.52 47.05


Top 16mm 2 nos T1 Bars

Top 16 mm 1 nos T2 Bars 0.9 21.724 0.9 16 1 23.52 23.52

Bottom 20 mm 2 nos B1 Bars 0.9 21.724 0.90 20 2 23.52 47.05

Bottom 20 mm 1 nos B2 Bars 0.9 21.724 0.90 20 1 23.52 23.52


LAP (50D) FOR
Top 16mm 2 nos T1 Bars 0.800 16 2 0.80 1.60
(1 position))
Top 16 mm 1 nos T2 Bars 0.800 16 1 0.80 0.80
(1 position))
Bottom 20 mm 2 nos B1 Bars 1.000 20 2 1.00 2.00
(1 position))
Bottom 20 mm 1 nos B2 Bars 1.000 20 1 1.00 1.00
(1 position))
STIRRUPS S1
Stirrups - 8 Ø @ 100 mm C/C 0.08 0.250 8 156 1.56 243.36
0.450

...................Submitted By ...................Checked By ...................Approved By


Page 43 of 57

Bill No.2
Ø of Cut Total Length (m)
S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

...................Submitted By ...................Checked By ...................Approved By


Page 44 of 57

frpm grid 29 30

...................Submitted By ...................Checked By ...................Approved By


Page 45 of 57

GWALLEK NIRMAN SEWA Pvt Ltd.


Baitadi, Nepal

BAR BENDING SCHEDULE

Total Wt.
Ton.
Total Wt.= 5065.60 286.47 0.00 0.00 0.00 0.00 0.00 0.00 5.35
Unit wt.= 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Reinforcement (TMT steel work with the steel


supplied by the owner including straightening,
cleaning, cutting, bending with 20 SWG
10
annealed tying wire and fixing in position
drawing, specification & instruction of the
Consultant.)

K block(between grid 29 & 37)


at lvl -7.55m
Rebar of Slab
Bottom rebar
Main Rebar along E-W direction A-B
Bottom 8mm B2 Bars @150 mm c/c 0.1 24.51 8 31.0 24.61 762.91
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 62.0 0.40 24.80

Main Rebar along E-W direction B-C


Bottom 8mm B2 Bars @150 mm c/c 0.1 24.51 8 44.0 24.61 1082.84
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 88.0 0.40 35.20

Main Rebar along E-W direction C-E


Bottom 8mm B2 Bars @150 mm c/c 0.1 24.51 8 59.0 24.61 1451.99

...................Submitted By ...................Checked By ...................Approved By


Page 46 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

LAP (50D) FOR


Bottom 8mm B2 Bars @150 mm c/c 0.40 8 118.0 0.40 47.20

Main Rebar along S-N direction 24a-26(2m)


Bottom 8mm B2 Bars @150 mm c/c 0.1 21.884 0.1 8 17.0 22.08 375.43
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 34.0 0.40 13.60

Main Rebar along S-N direction 26-29


Bottom 8mm B2 Bars @150 mm c/c 0.1 21.884 0.1 8 58.0 22.08 1280.87
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 116.0 0.40 46.40

Main Rebar along S-N direction 29-32


Bottom 8mm B2 Bars @150 mm c/c 0.1 21.884 0.1 8 40.0 22.08 883.36
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 80.0 0.40 32.00

Main Rebar along S-N direction 32-37


Bottom 8mm B2 Bars @150 mm c/c 0.1 21.884 0.1 8 36.0 22.08 795.02
LAP (50D) FOR
Bottom 8mm B2 Bars @150 mm c/c 0.40 8 72.0 0.40 28.80

TOP REBAR(along E-W) A&B


Distribution bar between grid A& B 0.1 24.51 8 15.0 24.61 369.15

lap 0.4 8 30.0 0.40 12.00


Extra top bar

Across grid 26 2.325 8 16.0 2.33 37.20

between 26 and 29 2.2 8 32.0 2.20 70.40

Across grid 29 2.35 8 16.0 2.35 37.60

...................Submitted By ...................Checked By ...................Approved By


Page 47 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Between Grid 29 and 32 2.25 8 16.0 2.25 36.00

Across grid 32 2.275 8 16.0 2.28 36.40

Between Grid 32&37 2.1 8 16.0 2.10 33.60

Across grid 37 0.895 0.1 8 16.0 1.00 15.92

TOP REBAR(along E-W) B &C


Distribution bar between grid B&C 0.1 24.51 8 29.0 24.61 713.69

lap 0.4 8 58.0 0.40 23.20


Extra top bar

Across grid 26 2.325 8 15.0 2.33 34.88

between 26 and 29 2.2 8 30.0 2.20 66.00

Across grid 29 2.35 8 15.0 2.35 35.25

Between Grid 29 and 32 2.25 8 15.0 2.25 33.75

Across grid 32 2.275 8 15.0 2.28 34.13

Between Grid 32&37 2.1 8 15.0 2.10 31.50

Across grid 37 0.895 0.1 8 15.0 1.00 14.93

...................Submitted By ...................Checked By ...................Approved By


Page 48 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

TOP REBAR(along E-W) C &E


Distribution bar between grid C &E 0.1 24.51 8 35.0 24.61 861.35

lap 0.4 8 70.0 0.40 28.00


Extra top bar

Across grid 26 2.325 8 24.0 2.33 55.80

between 26 and 29 2.2 8 48.0 2.20 105.60

Across grid 29 2.35 8 24.0 2.35 56.40

Between Grid 29 and 32 2.25 8 24.0 2.25 54.00

Across grid 32 2.275 8 24.0 2.28 54.60

Between Grid 32&37 2.1 8 24.0 2.10 50.40

Across grid 37 0.895 0.1 8 24.0 1.00 23.88

TOP REBAR(along S-N) 24a-26(2 m)


Distribution bar between grid 24a-26 0.1 21.884 0.10 8 8.0 22.08 176.67
\
LAP (50D) FOR
Distribution bar between grid 24a-26 0.40 8 16.0 0.40 6.40

Across grid A 1.14 0.1 8 9.0 1.24 11.12

...................Submitted By ...................Checked By ...................Approved By

extra top
Page 49 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Across grid B 2.95 8 9.0 2.95 26.55

extra top
Between grid B and C 2.425 8 9.0 2.43 21.83
bar
nos=botto
m bar nos
- top
Across grid C 2.425 8 9.0 2.43 21.83 distributio
n bar nos
Between grid C and E 2.225 8 18.0 2.23 40.05

...................Submitted By ...................Checked By ...................Approved By


Page 50 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Across grid E 1.060 8 9.0 1.16 10.44


0.10

TOP REBAR(along S-N) 26-29


Distribution bar between grid 26-29 0.1 21.884 0.10 8 39.0 22.08 861.28
\
LAP (50D) FOR
Distribution bar between grid 26-29 0.40 8 78.0 0.40 31.20

Across grid A 1.14 0.1 8 19.0 1.24 23.47

Across grid B 2.95 8 19.0 2.95 56.05

Between grid B and C 2.425 8 19.0 2.43 46.07

Across grid C 2.425 8 19.0 2.43 46.07

Between grid C and E 2.225 8 38.0 2.23 84.55

Across grid E 1.060 8 19.0 1.16 22.04


0.10

TOP REBAR(along S-N) 29-32


Distribution bar between grid 29-32 0.1 21.884 0.10 8 27.0 22.08 596.27
\
LAP (50D) FOR
Distribution bar between grid 29-32 0.40 8 54.0 0.40 21.60

Across grid A 1.14 0.1 8 13.0 1.24 16.06

...................Submitted By ...................Checked By ...................Approved By


Page 51 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Across grid B 2.95 8 13.0 2.95 38.35

Between grid B and C 2.425 8 13.0 2.43 31.53

Across grid C 2.425 8 13.0 2.43 31.53

Between grid C and E 2.225 8 26.0 2.23 57.85

Across grid E 1.060 8 13.0 1.16 15.08


0.10

TOP REBAR(along S-N) 32-37


Distribution bar between grid 32-37 0.1 21.884 0.10 8 28.0 22.08 618.35
\
LAP (50D) FOR
Distribution bar between grid 32-37 0.40 8 56.0 0.40 22.40

Across grid A 1.14 0.1 8 8.0 1.24 9.88

Across grid B 2.95 8 8.0 2.95 23.60

Between grid B and C 2.425 8 8.0 2.43 19.40

Across grid C 2.425 8 8.0 2.43 19.40

Between grid C and E 2.225 8 16.0 2.23 35.60

Across grid E 1.060 8 8.0 1.16 9.28


0.10

...................Submitted By ...................Checked By ...................Approved By


Page 52 of 57

Bill no. 2

Ø of Cut Total Length (m)


S.N. Description Bar Details dimensions (m) Bar,m No. Length/pc Remark
m (m) 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø

Chair 10 384.0 1.21 464.64 as per site


1.21

...................Submitted By ...................Checked By ...................Approved By


GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Projec Project :Construction Of Commercial Building of Aadar Multi Investment Company Limited.
Site : Site : Balkhu, Kathmandu
Bill No : One
S.No Description Nos Length Breadth Height Quantity Remarks
8. P.C.C for R.C.C Work
Plain cement concrete for R.C.C shear
wall, column, beam, slabs, lintels, wall
footing and all types of R.C.C works
with cement, sand, and stone ballast
20mm & down with the material
supplied by the owner including
mixing, laying, finishing & curing as
per drawing, specification and
instruction of Consultant. All
concreting work will be done by using
batching plant and the concrete pump.

8.1 P.C.C. M25 Grade Concreting Total 134.30 cu m


BLOCK K (between grid 29 & 37)
BEAM AT -II Level
-7550mm LEVEL SLAB
150 mm thick slab 1.0 24.525 21.725 0.15 79.92

Deductions

Main beam Along East-West


Direction
Along main beam at grid A-A,B-B,C- 23.54
C,E-E(26-37) 4 24.525 0.400 0.600

Main beam Along North-South


Direction
Along main beam grid 37-37,32-32,29- 13.63
1
29,26-26(between gridB-E) 4 14.202 0.400 0.600
Along main beam grid 37-37,32-32,29- 1.90
2
29,26-26(between gridA-B) 3 3.523 0.400 0.450
Secondary beam Along East-West
Direction
7.22
Along Secondary beam SB1,SB2,SB3
3 22.925 0.300 0.350

Secondary beam Along North-


South Direction
Secondary beam 8.07
SB9/SB10/SB11/SB12 4 19.224 0.300 0.350
GWALLEK NIRMAN SEWA Pvt Ltd.
Baitadi, Nepal

Measurement Sheet

Project : Construction Of Commercial Building of Aadar Multi Investment Company Limited.


Site : Balkhu, Kathmandu
Bill No : Two
S.No Description Nos Length Breadth Height Quantity Remarks
9. Form Work
Form work, centering and shuttering
with standard quality water proof ply
wood for all kinds of R.C.C. works
including all necessary propping,
scaffolding, staging, supporting and
necessary hooks, screws, clamps, nuts,
bolt, etc. all complete.

9.1 Formwork Total 794.489 Sq m


K Block (inbetween grid 26 & 32)
-II level slab=-7550 mm level

Beam sofit and slab 1 24.525 21.724 532.78

Deduction of column portion 12 1.000 1.000 (12.00)


Column(1000*1000)

Sides of Mainbeam ( East - West


Direction)
Along grid B,C,E (2m from 26 to 37) 70.29
1
(bothsides) 6 19.525 0.600
Along grid A (2m from 26 to 37) 11.71
2
(inner) 1 19.525 0.600
-
Sides of Mainbeam ( North - -
South Direction)
12.68
1 Along beam 26,29,32&37(A-B)(bothsides)
8 3.523 0.450
Along beam along 26,29,32&37(B-E) 68.17
2
(bothsides) 8 14.202 0.600
-
Sides of secondary beam(East- -
West direction)
Along Beam SB1/SB2/SB3 6 22.102 0.350 46.41
-
Sides of secondary beam(North- -
South direction)
Along Beam SB9/SB10/SB11/SB12 8 19.224 0.350 53.83
-
-
Form work at slab face (along grid 10.61
E and 14) 1 70.728 0.150
FINISHING WORK

Quantity
Sn Items Units
A Block B Block C Block D Block E Block F Block G Block H Block Total Remarks

You might also like