Sr. NCC
Site Record Issue/Condition Solution Solution Description Notes
No. Compliance

Site Visit The oor joists over the Remove Joists and Replace — Certain implications of this option:
conducted on entry are not as per Removal of currently installed 290 - This was proposed in the
____ date by drawings. The drawings mm joists and re tting with original construction and thereby
Ruby Tuesday showed 140 mm joists, the 140 mm as per the working approved by the relevant
& Abhigyaan builder has installed 290 drawings approved. authorities. Yet this requires the
Sarangi mm joists at the same maximum amount of intervention
height as those to the Instruction - Discarded option of compared to the rest of the
main addition. The 140 recti cation options presented below. Heavy
1 mm joists should have Recti cation Yes intervention results in delays and
been installed 70 mm increased cost..
lower according to the
drawings. The roof across
the entrance cannot be
constructed as currently
drawn and this may cause
issues for compliance with
the NCC.
fi
fl
fi
fi
Trim Joists - The joists have to be Certain implications of this option:
trimmed to the right size with - Insitu trimming can generally be
battons and joists at 400 centres. an awkward process as it is an
The notches of the button needs to intervention post construction.
be trimmed precisely as well. - Long delays can be expected if
the joists are removed and then
Another way can be to trim the joists trimmed.
Redesign 1 Yes
without the battons.

This process will require a structural


engineer involved in the process.

Instruction - Move forward with


option of re-design

Flip Detail - The box gutter is placed Certain implications of this option:
adjacent to the door. The slope is - This process is heavily
reversed and now it will be towards consuming. Constructing a slope
the door. The collection will be infant is in itself a time consuming
of the door, the down pipe will be process. Reversing that process
placed there along with the rain and redoing it the other way
Redesign 2 No
pipe. around is a long process.
- This also insures cost of using
Instruction - Discarded option of re- extra materials.
desig
Add Up stand at the door — Another Certain implications of this option:
way could be too raising the nished - It adds to the existing cost of
oor level of the door above the materials required. Thereby
required 290 mm. increasing the total cost of the
project.
Instruction - Discarded option of re- - It will cause a su cient issue of
Redesign 3 Yes
design mobility, by triggering a trip
hazard. The movement in its own
will be uncomfortable.
- The option is not desirable but
exists as an option.