5G-NR PROJECT

AS-BUILT DRAWING
(ROOFTOP)

SUBPROJECT CODE: 21MIN00051312


SUBPROJECT NAME: PH1000026 NR
LON(E): 124.65031
LAT(N): 8.48286
TOWER TYPE: ZCG-12-280C-1NPT (290KPH/C)

700M&2100M&2600M&(NR)
1- BATTERY, 1- RM, 1- DCDU, 3 - 5GAAU
TABLE OF CONTENTS
NO. DRAWING NO. DESCRIPTION
CONSTRUCTION SAFETY REQUIREMENTS
BILL OF QUANTITY
ARCHITECTURAL
1 AR-01 SITE INFORMATION
2 AR-02 PERSPECTIVE VIEW/ SITE LAYOUT/ ANTENNA VIEW
3 AR-03 SITE DEVELOPMENT PLAN/ ELEVATION VIEW
4 AR-04a ELEVATION VIEW
5 AR-04b CABLE TYPES AND ROUTES
6 AR-05 EQUIPMENT LAYOUT
STRUCTURAL
1 ST-01 INSTALLED ROOFTOP FRAMING
ELECTRONICS
1 ECE-01 EQUIPMENT LAYOUT IN CABINET
2 ECE-02 EQUIPMENT CONNECTION DIAGRAM
3 ECE-03 5GNR CABLING
ELECTRICAL
1 EL-01 SINGLE LINE DIAGRAM
2 EL-02 GROUNDING RISER DIAGRAM

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: TABLE OF CONTENTS DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
CONSTRUCTION SAFETY REQUIREMENTS

1.The constructors shall follow the safety regulations and the mandatory provisions 15.It is strictly forbidden to cut off the power of a running equipment without
while constructing telecommunication project. authorization.
2.While constructing in special areas such as highways, railways, bridges, navigational 16. No connector is allowed in the middle of a power cord.
channels, and in urban areas with crowded traffic, it is necessary to set warning signs, 17.It is forbidden to install switches or fuses in the ground lead or AC neutral wire.
or send special guards if needed. 18. It is strictly forbidden to hang signal lines and power lines on the lightning
3. In high-altitude operations, constructors should ware safety belts, helmets, and soft receptor, down conductor and its support.
rubber insulated shoes. 19. It is strictly forbidden to hang the AC power cord on the communication device.
4. Temporary facilities such as living place, offices must be safe, secure, and 20. Verify the power supply capacity when using the original power outlet.
comply with fire safety regulations. Combustible material is strictly forbidden in building 21. Electric operations should use well-insulated tools and be operated by qualified
temporary facilities. Temporary facilities should be far away from electrical facilities operator. When operating in running equipment, head cabinets, and branch
and high-voltage electric wires. cabinets, do not wear metal ornaments and take effective measures to prevent
5.Living room should be built in places far away from landslides, floods and metal materials such as screws, gaskets, and metal chips from falling.
mudslides. 22. No tools or equipment shall be placed on iron frames, channels, racks, ladders.
6. When working on rivers, lakes and reservoirs, it's necessary to wear life vest and 23. When working in machine room with running equipment, the working area shall
listen to the unified command. be demarcated. The operator shall not touch the running equipment, or the fire
7. Fire and smoking are strictly prohibited while operating in optical (electric) cable protection facilities, unless it is necessary.
entry rooms, waterline houses, machine rooms, unattended stations, woodworking 24. Non-construction personnel are strictly prohibited from entering the construction
sites, warehouses, forest areas, grasslands, etc. Fire protection device for exhaust area without the consent of the on-site commander. When lifting and working on the
pipe must be INSTALLED in vehicles before entering the fire ban area. tower, it is prohibited work or stand under the tower.
8.When the cables and other materials passing through the walls or floors, the holes 25. It is strictly forbidden to operate on the tower if sick or drunk.
must be sealed with fireproof materials. 26. When working on the tower, the safety belt of the operator must be fixed to the
9. When the electrical equipment is on fire, the power must be cut off first. main structure of the tower.
10. Safety belts must comply with the national standards. It is strictly forbidden to 27. When installing the antenna feeder at high altitude, the constructor should pay
replace the seat belt with ordinary ropes, wires, etc. attention to the safety and prevent the damage of the falling objects to the people on
11.When working near power supply line, constructors must wear safety helmets, the ground.
insulated gloves, insulated shoes and use insulated tools. 28. When laying cables, do not pull hard. Do not stand on the windowsill when
12.When working near high-voltage line, the minimum distance from the laying cables on the roof. Use safety belts when you must stand on the windowsill.
high-voltage line to constructors must be guaranteed: 2.5m while the line voltage is 29. Set obvious safety warning signs at the entrance of the construction site, cranes,
below 35kV, and 4m while the line voltage is above 35kV. temporary power facilities, access passages, holes, manholes, tower bottoms,
13.When working in flammable and explosive places, explosion-proof tools must be hazardous gas and liquid storage. Safety warning signs must comply with national
used. regulations.
14.It is strictly forbidden to store flammable, explosive and other dangerous
materials in the machine room.

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: Construction Safety Requirements DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
BILL OF QUANTITY

ITEM CODE ITEM/ ITEM DESCRIPTION QTY UOM REMARK

D01140100060 Model A23-NR co-site construction-64TR-3 sectors-no control board change-AQQN 1 Site

D01140100013 OMC-R Basic Software Package-NR 6 Carrier Sector

D06040200013 Outdoor integrated cabinet-Outdoor integrated cabinet-1-Integrated power cabinet 0 Frame

D06080500005 Outdoor integrated cabinet-Power&Environment Monitoring sensor-Power&Environment Monitoring sensor 0 Site

D06050400010 48V 150Ah Lithium Battery 1 Group

D06121400003 Rectifier Module (50A) 1 Block

D06040400006 Embedded Power 0 Frame

D06080500005 Outdoor integrated cabinet-Power&Environment Monitoring sensor-Power&Environment Monitoring sensor 0 Frame

D14090100248 Equipment Installation-Macro NodeB-NR System Asynchronous Construction-3 Sectors-3 AAUs 1 Site

D14090100249 NR-Single Site Optimization(SSO) 6 Carrier Sector

D14090300137 Installing- Outdoor Integrated Cabinet 0 Frame

D14090300138 Installing- Embedded Switch Power System 0 Frame

D14090300149 Minor Expansion- Other Power System 1 Site

D14090300142 Installing- Iron Phosphate Lithium Batteries 1 Group

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: BILL OF QUANTITY DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
N

Site Information
Site
Site ID PH1000026
Site Code
Site Name
Area Type Urban SITE
SITE ID (PH1000026)
Location Detail ANTONIO LUNA ST., BRGY. 27
CAGAYAN DE ORO CITY,
Longtitude(E): 124.65031 NORTHERN MINDANAO,
(REGION X)
Latitude(N): 8.48286
Altitude(m): 5
Region NORTHERN MINDANAO (REGION X)

Province MISAMIS ORIENTAL


Site Address ANTONIO LUNA ST., BRGY. 27, CAGAYAN DE ORO CITY
Site Detail
Site Type MacroSite
Frequency band 700M&2.1G&2.6G&NR
Quantity of sectors 3
Site Sub-type Rooftop
Site category 5GNR
Type of property Private land
Building height(m) 9.695
Quantity of floors 3
Tower height( m) 12

B VICINITY MAP
SCALE NTS

Civil Work Input:


Exposure category: C D ;
Soil Bearing Capacity: N/A kpa;
Under Ground Water Level: N/A m;
Soft Subsoil: Yes No N/A .

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE AR-01
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: SITE INFORMATION DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
EXISITNG LIGHTNING ARRESTER

171°
EXISITNG OB LIGHT
EXISITNG POWER SUPPLY CABINET 2
EXISITNG INSTALLED 5GNR
L700&L2100&L2600 ANTENNA ( RRU AT THE BACK)
(RRU AT THE BACK OF ANTENNA)
EXISITNG POWER SUPPLY CABINET 1

EXISITNG POWER 14500 N


SUPPLY CABINET 1&2 EXISITNG
ZCG-12-280C-1NPT (290KPH/C)
EXISITNG
UPGRADED FROM 160AT TO 225AT ACPDB EXISITNG
24 HOLES BUSBAR

EXISITNG DC CABLE (OB LIGHT)


EXISITNG GPS ANTENNA
INSTALLED 5G AAU CABLE
EXISITNG CABLE LADDER
400 1100 2600 200

EXISITNG DC CABLE (RRH & RRU)

1600
EXISITNG 225 AT
ACPDB

EXISITNG
24 HOLES BUSBAR EXISITNG CABLE LADDER

2900

13500
2900 1100

ROOF DECK
ELEVATION 9 M AGL

EXISITNG GPS ARRESTER

EXISITNG 225
AT MCB
EXISITNG
KWH-METER

EXISITNG 225 AT MCB

EXISITNG
TEST PIT

INSTALLED
B SITE LAYOUT TEST PIT
SCALE NTS INSTALLED UPGRADED FROM 160AT
TO 225AT MTS, MCB
(LOCATED AT 1ST FLOOR)
LEGEND: A PERSPECTIVE VIEW
SCALE NTS

DC CABLE
5G AAU /FOC

GPS CABLE
AC CABLE

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE AR-02
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: PERSPECTIVE VIEW/SITE LAYOUT DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
EXISITNG LIGHTNING ARRESTER

EXISITNG OB LIGHT

171°
EXISITNG INSTALLED 5GNR
L700&L2100&L2600 ANTENNA ( RRU AT THE BACK)
(RRU AT THE BACK OF ANTENNA)
EXISITNG POWER SUPPLY CABINETS
14500 N
EXISITNG POWER
SUPPLY CABINET 1&2 EXISITNG
ZCG-12-280C-1NPT (290KPH/C)
EXISITNG
UPGRADED FROM 160AT TO 225AT ACPDB EXISITNG
24 HOLES BUSBAR

EXISITNG DC CABLE (OB LIGHT)


EXISITNG GPS ANTENNA
INSTALLED 5G AAU CABLE 400 1100 2600
EXISITNG CABLE LADDER

EXISITNG DC CABLE (RRH & RRU)


200

1600
EXISITNG
UPGRADED FROM 160AT TO 225AT ACPDB
EXISITNG 225 AT
ACPDB

EXISITNG
24 HOLES BUSBAR EXISITNG CABLE LADDER

2900

13500
2900 1100

ROOF DECK
ELEVATION 9 M AGL

EXISITNG GPS ARRESTER

2*100mm² AC CABLE
(BLACK/RED)
(UPGRADED FROM 60mm2 TO
100mm2)

EXISITNG 225
AT MCB
EXISITNG
KWH-METER

EXISITNG 225 AT MCB

EXISITNG
TEST PIT
EXISITNG
TEST PIT
EXISITNG UPGRADED FROM 160AT
TO 225AT MTS, MCB
A PERSPECTIVE VIEW 1 ELECTRICAL LAYOUT (LOCATED AT 1ST FLOOR)
SCALE NTS
SCALE: NTS
NOTES :FOR WIRING & CONDUIT DETAILS REFER TO "SINGLE LINE DIAGRAM"

LEGEND:
DC CABLE
INSTALLED Equipment list
5G AAU /FOC FROM TO DISTANCE NO. Item Dimension(mm)(W*D*H) QTY Comments
KHWR METER MCB 2.0m 1 POWER SUPPLY CABINET 12000(H) 2
GPS CABLE
MCB MTS 2.0m 2 EQUIPMENT SUPPLY CABINET
AC CABLE MTS ACPDB 30.0m 3 MCB 1 UPGRADED FROM 160AT TO 225 AT
GROUNDING CABLE ACPDB RECTIFIER 5.0m 4 MTS 1 UPGRADED FROM 160AT TO 225 AT
TOTAL 39.0m 5 ACPDB 1 UPGRADED FROM 160AT TO 225 AT

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR PROJECT CODE: 21MIN0005 PAGE AR-03
C.DIEZ Z.CADER M. HARON

GLENN L. BRIONES
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRICAL ENGINEER
PRC NO.: 0004812 PTR NO.: 4591490 SITE NAME: SCALE AS SHOWN
TIN: 921-277-492 DATE ISSUED: 01/02/2024
SHEET NAME: Site Development Plan/Elevation View DATE 30-JAN-2024
PLACE ISSUED: MALAYBALAY CITY, BUKIDNON
NOTE:
THE INSTALLED 5GNR AAU ON
EXISITNG LIGHTNING ARRESTER PLATFORM 1 AZIMUTH RANGES
FROM:
EXISITNG OB LIGHT A01
-A04 (10°-30°-90°) N
-A05 (130°- 150°- 210°)
-A06 (250°- 270°- 330°)
EXISITNG S01:30°
L700&L2100&L2600 ANTENNA
INSTALLED 5GNR ( RRU EXISITNG
AT THE BACK) INSTALLED 5GNR
(RRU AT THE BACK OF ANTENNA) L700&L2.1G&L2.6G ANTENNA
20.95m ( 2.1G RRU )
A04 (L700 RRH & 2.6G RRU)

A06
EXISITNG
EXISITNG AHPC:
L700&L2.1G&L2.6G ANTENNA
2*6mm² RRU DC POWER CABLE(BLUE/BLACK)
EXISITNG ARGA: (L700 RRH & 2.6G RRU) INSTALLED 5GNR
2*10mm² RRU DC POWER CABLE(BLUE/BLACK) S03:270°
EXISITNGARGA: INSTALLED 5GAAU:
2*10mm² RRU DC POWER CABLE(BLUE/BLACK) A03
2*10mm² RRU DC POWER
CABLE(BLUE/BLACK)
IEXISITNG
L700&L2.1G&L2.6G ANTENNA
(L700 RRH & 2.6G RRU)
EXISITNG DC CABLE
EXISITNG (OB LIGHT)
POWER SUPPLY CABINET 1 & 2
INSTALLED 5GNR
S02:150°
EXISITNG ( 2.1G RRU ) A05 A02
UPGRADED FROM 160AT TO
225AT ACPDB

PLATFORM 1 LAYOUT
Antenna Information
ANT Dimension(H*W*D Ant mounted
Sector ID NO. Antenna Group Azimuth(°) M-tilt(°) E-tilt(°) Type Remark
Height(m) ) on
12.579m
INSTALLED GPS
LOCATION S01 A01 L700&L2.1&L2.6 16ports 13.2dBi 30 20.95 2695x469x198 0 9 Platform 1 T2024L6R021 RETAINED
S02 A02 L700&L2.1&L2.6 16ports 13.2dBi 150 20.95 2695x469x198 0 7 Platform 1 T2024L6R021 RETAINED
S03 A03 L700&L2.1&L2.6 16ports 13.2dBi 270 20.95 2695x469x198 0 7 Platform 1 T2024L6R021 RETAINED
S01 A04 5GNR 30 20.95 1001x448x113 2 0 Platform 1 5GAAU INSTALLED
9.694m S02 A05 5GNR 150 20.95 1001x448x113 2 0 Platform 1 5GAAU INSTALLED
S03 A06 5GNR 270 20.95 1001x448x113 2 0 Platform 1 5GAAU INSTALLED
A7 GPS ANT 12.579 RETAINED

RRU INFORMATION
NO. RRU Dimension(H*W*D) QTY Type Status
1 700M RRH 336.5x295x125 3 AHPC RETAINED
2 2100M RRU 115x420x400 2 ARGA RETAINED
6.0m 3 2600M RRU 370x423x127 3 FZHN RETAINED
4 NR 1001x448x113 3 5GAAU INSTALLED

INSTALLED SECTOR FREQUENCY BAND OBJECTIVES SECTOR FREQUENCY BAND


SECTOR 1 700M+2100M+2600M SECTOR 1 700M+2100M+2600M+NR
SECTOR 2 700M+2100M+2600M SECTOR 2 700M+2100M+2600M+NR
SECTOR 3 700M+2100M+2600M SECTOR 3 700M+2100M+2600M+NR

3.0m
CABLE INFORMATION
NO. Cable Type Length (m) Existing Quantity Add Quantity

LEGEND: 1 CPRI 30 8 6
2 Jumper 3 43 0
DC CABLE
3 Jumper 10 8 0
5G AAU /FOC 4 AISG 3 3 0
GPS CABLE 5 AISG 10 0 0
0m
AC CABLE 6 RF Power Cable (+/-) 30 8 3
INSTALLED
TEST PIT GROUNDING CABLE 7 Grounding 12 8 3
A RIGHT SIDE ELEVATION
SCALE NTS

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR RIZZA PROJECT CODE: 21MIN0005 PAGE AR-04a
C.DIEZ Z.CADER LAYAN

RONIE A. SOLIJON
______________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRONICS ENGINEER
PRC NO.: 0000364 PTR NO.: 5869599 SITE NAME: SCALE AS SHOWN
TIN: 176-146-755 DATE ISSUED: 01/03/2024
SHEET NAME: ELEVATION VIEW DATE 30-JAN-2024
PLACE ISSUED: CAGAYAN DE ORO CITY
PROJECT NAME: F&T 2022 MIN WIRELESS
ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR RIZZA PROJECT CODE: 21MIN0005 PAGE AR-04b
C.DIEZ Z.CADER LAYAN

RONIE A. SOLIJON
______________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRONICS ENGINEER
PRC NO.: 0000364 PTR NO.: 5869599 SITE NAME: SCALE AS SHOWN
TIN: 176-146-755 DATE ISSUED: 01/03/2024
SHEET NAME: CABLE TYPES AND ROUTES DATE 30-JAN-2024
PLACE ISSUED: CAGAYAN DE ORO CITY
1100

200

1100
2600
EXISTING LOCATION ANCHOR 400x400
OF EQUIPMENT PAD

2900
INSTALLED
225 AT ACPDB

1600 2900
ORIGINAL COLUMN IS 300x600MM
AND TOWER COLUMN IS 400x400MM
ANCHOR 400x400

ORIGINAL COLUMN IS 300x600MM


AND TOWER COLUMN IS 450x450MM

ROOF INSTALLED ELEMENTS


TYPE INDEX SIZE(mmXmm)
COLUMN C1 300x600
BEAM B1 250X500
SLAB S1 NTS

BILL OF MATERIALS (CABLE TRAY)

SPECIFICATION LENGTH (M) REMARK

CABLE TRAY - -

INSTALLED
1 ROOF FRAMING PLAN
SCALE 1:20 NTS

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS CIVIL
BASE STATION PROJECT
V1 5G-NR ZHAO PROJECT CODE: 21MIN0005 PAGE ST-01
C.DIEZ Z.CADER ZHIGANG

NIVARD B. SERRANO
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
CIVIL ENGINEER
PRC NO.: 0101741 PTR NO.: 2469747 SITE NAME: SCALE AS SHOWN
TIN: 246-378-714 DATE ISSUED: 01/04/2024
SHEET NAME: EXISTING ROOFTOP FRAMING DATE 30-JAN-2024
PLACE ISSUED: LIBON, ALBAY
Power Supply Cabinet 1 Power Supply Cabinet 2
LLVD MCB LLVD MCB
16A 16A 32A 32A 32A 32A 32A 32A 32A 32A 125A 125A 125A 125A 125A 125A 16A 16A 16A 16A 16A 16A 25A 25A 25A 32A 32A 32A 32A 16A 16A 16A 16A 16A 32A 32A 32A 32A 32A 32A 32A 32A 125A 125A 125A 125A 125A 125A 16A 16A 16A 16A 16A 16A 25A 25A 25A 32A 32A 32A 32A 16A 16A 16A

Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder Noder

15 Spare
10 Spare

10 Spare

13 Spare

18 Spare

19

15 Spare
10 Spare

10 Spare

13 Spare

19
12

12 Spare

14 Spare

16 Spare

17

12

12 Spare

14 Spare

16 Spare

17

18 Spare
20 Spare

20 Spare
11

11 Obstruction Light

11

11 Spare
5

7
3

3
6

9
2

2
4

4
1

1
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
Spare

Spare
DCDU 1

DCDU 1

DCDU 2

DCDU 2
5G BBU

BATTERY 1

BATTERY 2

BATTERY 3

BATTERY 4

BATTERY 5

BATTERY 6
4G BBU

700M RRH

700M RRH

700M RRH

2100M RRU

2100M RRU

HEX

HEX
GFSU

A1

A1

Air Conditioner

Air Conditioner
DCDU 1 ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
DCDU 2 ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I

9x40A 0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
4x40A 0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF
0
OFF

40A 40A 40A 40A 40A 40A 40A 40A 40A 4x30A 40A 40A 40A 40A 30A 30A 30A 30A

LLVD MCB
LLVD MCB 2x16A/1P
2x16A/1P 8x32A/1P
8x32A/1P 2x125A/1P
2x125A/1P BLVD MCB
BLVD MCB 6x16A/1P
Battery MCB
Battery MCB 6x16A/1P
4x125A/1P 3x25A/1P
4x125A/1P 3x25A/1P
5x32A/1P
5x32A/1P Monitor
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 2x16A/1P
Monitor 2x16A/1P
DCDU 1 40A 40A 40A 40A 40A 40A 40A 40A 40A
DCDU 2 40A 40A 40A 40A 30A 30A 30A 30A RECTIFIER
RECTIFIER MODULE
MODULE DCDU 2-1U

NR
Spare

NR
Spare

Spare

Spare
Spare

Spare

Spare

Spare
Spare

Spare

NR
Spare
50A (5)

2600M RRU

2600M RRU
2600M RRU
DCDU 1-1U 50A (3)
FMS GSFU-1U
A1-1U

RESERVED-2U

SPARE-1U

RESERVED IDU-2U

SPARE-1U

BBU-3U

EQUIPMENT SCHEDULE IN EQUIPMENT CABINET

ODF-3U NO. Equipment Existing QTY Add QTY Comments Remarks

1 DC 2

2 BBU 1

INSTALLED IN EXISTING
3 BATTERY 5 1 150AH(LI)
POWER SUPPLY CABINET 2 150A Lithium BATTERY
150A Lithium BATTERY
INSTALLED IN EXISTING
4 RECTIFIER MODULE 7 1 50A
POWER SUPPLY CABINET 2
5 GSFU 1
INSTALLED IN EXISTING
6 DCDU 1 1
POWER SUPPLY CABINET 2
7 DCPDB 0 150A Lithium BATTERY
150A Lithium BATTERY
8 IPRAN 1 A1
9 MW IDU 0
10 ODF 1
11 GPS ARRESTER 1
150A Lithium BATTERY
150A Lithium BATTERY

Existing Power Supply Existing Power Supply


Cabinet 1 Cabinet 2
PROJECT NAME: F&T 2022 MIN WIRELESS
ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS ELECTRONICS
BASE STATION PROJECT
V1 5G-NR RIZZA PROJECT CODE: 21MIN0005 PAGE ECE-01
C.DIEZ Z.CADER LAYAN

RONIE A. SOLIJON
______________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRONICS ENGINEER
PRC NO.: 0000364 PTR NO.: 5869599 SITE NAME: SCALE AS SHOWN
TIN: 176-146-755 DATE ISSUED: 01/03/2024
SHEET NAME: EQUIPMENT LAYOUT IN CABINET DATE 30-JAN-2024
PLACE ISSUED: CAGAYAN DE ORO CITY
PROJECT NAME: F&T 2022 MIN WIRELESS
ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS ELECTRONICS
BASE STATION PROJECT
V1 5G-NR RIZZA PROJECT CODE: 21MIN0005 PAGE ECE-02
C.DIEZ Z.CADER LAYAN

RONIE A. SOLIJON
______________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRONICS ENGINEER
PRC NO.: 0000364 PTR NO.: 5869599 SITE NAME: SCALE AS SHOWN
TIN: 176-146-755 DATE ISSUED: 01/03/2024
SHEET NAME: EQUIPMENT CONNECTION DIAGRAM DATE 30-JAN-2024
PLACE ISSUED: CAGAYAN DE ORO CITY
PROJECT NAME: F&T 2022 MIN WIRELESS
ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS ELECTRONICS
BASE STATION PROJECT
V1 5G-NR RIZZA PROJECT CODE: 21MIN0005 PAGE ECE-03
C.DIEZ Z.CADER LAYAN

RONIE A. SOLIJON
______________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRONICS ENGINEER
PRC NO.: 0000364 PTR NO.: 5869599 SITE NAME: SCALE AS SHOWN
TIN: 176-146-755 DATE ISSUED: 01/03/2024
SHEET NAME: 5GNR CABLING DATE 30-JAN-2024
PLACE ISSUED: CAGAYAN DE ORO CITY
225 AMP /Single Phase GENERAL NOTES:
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH DITO
SERVICE ENTRANCE PEDESTAL SPECIFICATIONS, THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES AND
2-100mm² THW (Black/Red) +
REGULATION OF THE LOCAL MUNICIPALITY AND POWER UTILITY COMPANY.
1-50mm² THW GROUND (GREEN)
IN 50mmØ IMC OR 50mm PVC PIPE 2. WIRING METHOD:
A. INTERMEDIATE METAL CONDUIT (IMC) FOR SERVICE ENTRANCE AND ALL EXPOSED PORTIONS.
(ACPDB)
AC DISTRIBUTION PANEL B. UNDERGROUND CONDUITS SHALL BE PVC, ENCASED IN CONCRETE .
MECB IP 55 Enclosure in 304 Stainless Steel
FROM ELECTRIC UTILITY CO. IN NEMA 3R ENCLOSURE C. GROUNDING WIRES SHALL BE INSULATED.
SERVICE DROP 225 AT, 2P, 25 kAIC MCCB 3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS SHALL BE PROPERLY GROUNDED.
230VAC, 1 PHASE SYSTEM, 60Hz 230V, 60 Hz
4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5 mm² TYPE THHN/THW, UNLESS OTHERWISE INDICATED.
5. ALL WIRES SHALL BE A BRAND.
225 AT, 2P
6. WIRING DEVICES SHALL BE A BRAND.
GROUNDING
TO TEST PIT 7. ALL CIRCUIT BREAKERS SHALL BE BOLT ON TYPE IN IP 55 ENCLOSURE
2-100mm² THW (Black/Red) +
FOR OUTDOOR LOCATIONS, USING DITO TYPE APPROVED ENCLOSURE.
1-50mm² THW GROUND (GREEN)
IN 50mmØ IMC OR 50mm PVC PIPE 8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL TYPE, 25 kAIC, WHILE BRANCH CIRCUIT BREAKERS
SHALL BE COMMERCIAL TYPE, 10 kAIC
M
9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITNESSED .
GENSET PROVISION RESISTANCE SHALL BE GREATER THAN FIFTY(50) MEGA OHMS.

2-100mm² THW (Black/Red) + GROUNDING 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USE.
1-50mm² THW GROUND (GREEN) TO TEST PIT 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED, EVEN IF NOT

125AT, 2P

125AT, 2P

125AT, 2P

20AT, 2P

20AT, 2P

20AT, 2P

20AT, 2P

20AT, 2P
IN 50mmØ IMC OR 50mm PVC PIPE

100 kA
INDICATED IN THE PLANS.

SPD
12. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
MTS LICENSED AND REGISTERED ELECTRICAL ENGINEER.
IN NEMA 3R OR 4X ENCLOSURE
NOTE:
2- 225 AT, 2P, 25 kAIC MCCB
230V, 60 Hz TO GROUNDING THE POWER CORD OF THE SITE AVIATION OBSTRUCTION LIGHT SHOULD BE INSTALLED WITH
MTS
A POWER CABLE WITH A METAL SHEATH OR LAID THROUGH A STEEL TUBE.
SINGLE LINE DIAGRAM 7 C.OUTLET
THE METAL OUTER SHEATH OF THE CABLE (OR STEEL PIPE) SHOULD BE GROUNDED AT
6 SPARE
SCALE NTS
BOTH ENDS AND INTO THE EQUIPMENT ROOM.
SPARE 6
BOTH ENDS OF THE OUTDOOR CABLE LADDER SHOULD BE GROUNDED, AND THE GROUND
5 SPARE
CONNECTION
4 SPARE
WIRE SHOULD BE A MULTI-STRAND COPPER WIRE WITH A CROSS-SECTIONAL AREA OF NOT
3 RECTIFIER 3 LESS THAN 10MM2.
2 RECTIFIER 2
1 RECTIFIER 1

SCHEDULE OF LOADS (225 AMP MAIN)


PANEL : ACPDB
POWER SOURCE : 230V, 1-PHASE, 60Hz Computation: KVA LOAD SINGLE PHASE:
ENCLOSURE : IP 55 W/ GROUNDING BAR; BOTTOM FEED LOAD_AMP = LOAD_VA / LOAD_V = (230 x 143.49) / 1000
DEMAND FACTOR (%) = 100 = 33.0 KVA
CIRCUIT BREAKERS TOTAL AMP = 114.79 A = 50 KVA, which is still minimum allowable transformer
CKT. LOAD DESCRIPTION VOLTS_V LOAD_VA LOAD_AMP PROTECTION AMP = TOTAL AMP * 1.25 = 143.49 A
NO. capacity of COOP.
AT POLE WIRE SIZE GROUND SIZE CONDUIT
1 RECTIFIER 1 230 9000 39.13 125 2P 2 - 35mm², THW 1-14mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC
LEGEND
2 RECTIFIER 2 230 15000 65.22 125 2P 2 - 35mm², THW 1-14mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC

3 RECTIFIER 3 - - - 125 2P - - - Feeder:


2-100mm² THW (Black/Red) + 1-22mm² THW GROUND (GREEN) M KILOWATT HOUR METER
4 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THW 1 - 3.5mm², THW 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC IN 50 mmØ IMC or 50mm Ø PVC
MECB MAIN ENCLOSED CIRCUIT BREAKER
SPARE 230 600 2.61 20 2P 2 - 3.5mm², THW 1 - 3.5mm², THW 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
5
MTS MANUAL TRANSFER SWITCH
SPARE 230 600 2.61 20 2P 2 - 3.5mm², THW 1 - 3.5mm², THW 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
6 AC PANEL DISTRIBUTION BOARD
C. OUTLETS 1 - 3.5mm², THW
Protection: ACPDB

7 230 600 2.61 20 2P 2 - 3.5mm², THW 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
225 AT, 1-Phase MECB 2P, 230 V, 25 KAIC (EZD),
8 SPACE - - - - - - - - in NEMA 3R or 4x Enclosure. SPD

9 SPACE - - - - - - - -
GROUND
10 SPACE - - - - - - - -
SERVICE ENTRANCE
TOTAL LOAD 26400 114.79

PROJECT NAME: F&T 2022 MIN WIRELESS


ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS ELECTRICAL
BASE STATION PROJECT
V1 5G-NR PROJECT CODE: 21MIN0005 PAGE EL-01
C.DIEZ Z.CADER M. HARON

GLENN L. BRIONES
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRICAL ENGINEER
PRC NO.: 0004812 PTR NO.: 4591490 SITE NAME: SCALE AS SHOWN
TIN: 921-277-492 DATE ISSUED: 01/02/2024
SHEET NAME: SINGLE LINE DIAGRAM DATE 30-JAN-2024
PLACE ISSUED: MALAYBALAY CITY, BUKIDNON
LEGEND:
AIR TERMINAL WELDED AT THE EQUIPMENT SHELLS OF RRU, AAU, ODU, AND OTHER
THE TOP OF THE H-FRAME TELECOMMUNICATION EQUIPMENT ARE CONNECTED TO THE METAL
OF TRIPOD TOWER SHIELDS OF THEIR RESPECTIVE POWER CABLES, AND THEN THE 38mm² BARE COPPER WIRE
SHELL OF RRU/AAU/ODU IS CONNECTED DIRECTLY TO THE TOWER
BODY AT THE TOP OF THE TOWER WITH A GROUNDING CABLE. 38mm² INSULATED COPPER WIRE
16mm² INSULATED COPPER CABLE YELLOW/GREEN WITH
GROUNDING KIT CONNECTED TO THE TOWER BODY. 16mm² COPPER CABLE (GREEN/YELLOW)

CRIMP TYPE TERMINAL LUG

ANTENNA
FOR 38mm² BARE COPPER WIRE
RRH/RRU 5G AAU

MW DISH
ODU 16mmØ or 85"Ø x 3m
COPPER CLAD STEEL

AAU CABLE

NOTE:
IF POWER CABLE
1. GROUNDING SYSTEM FOR RRU IS UNDER DISCRETION OR
RRH/RRU POWER CABLE GPS AS PER RECOMMENDATION/APPROVAL OF DITO
TELECOMMUNITY ON HOW TO DO IT BY OTHERS BASED ON
STANDARD GROUNDING SYSTEM RECOMMENDED IN LATEST
GPS CABLE PEC (PHILIPPINE ELECTRICAL CODE).

GROUNDING 2. INSULATED COPPER CABLE (GREEN) FOR GROUNDING


BUSBAR INSIDE SERVICE EQUIPMENT WILL BE DEPEND ON THE kVA RATING

POWER CABINET 1

POWER CABINET 2
PANELBOARDS
OF THE TRANSFORMER. Please refer to the SINGLE LINE

CABLE TRAY
DIAGRAM FOR EXACT kVA RATING OF TRANSFORMER.

ACPDB
* 25kVA = 25mm² INSULATED COPPER CABLE (GREEN)
* 37.5kVA = 30mm² INSULATED COPPER CABLE (GREEN)
* 50kVA = 50mm² INSULATED COPPER CABLE (GREEN)
TOWER BODY 3. THE EQUIPMENT SHELL OF RRU, ODU AND OTHER
16mm² COPPER CABLE
GPS SURGE
PROTECTOR (GREEN/YELLOW) EQUIPMENT ARE GROUNDED INTO ONE AT THE TOP OF THE
24 HOLES GROUNDING
TOWER AND THE METAL SHIELDING LAYER OF THE POWER
35mm² INSULATED COPPER CABLE(GREEN)
For GROUNDING ELECTRODE CONDUCTOR BUSBAR UNDER POLE CABLES ARE CONNECTED TO BUSBAR BELOW IF LESS THAN
16mm² INSULATED COPPER OR EQUAL TO 60MTRS, IF RRU POWER CABLES ARE MORE

SUPPORT LEG 1
16mm² INSULATED COPPER

SUPPORT LEG 2
CABLE (YELLOW)
CABLE YELLOW/GREEN WITH THAN 60 MTRS INSTALL BUSBAR ON TOP TOWER WHICH IS

MAIN LEG
50mm² INSULATED GROUNDING KIT CONNECTED
COPPER CABLE TO GROUNDING BUSBAR
CONNECTED TO BUSBAR BELOW, AND TERMINATE
GROUNDING KIT TO ABOVE BUSBAR AND ALSO BELOW
38mm² BARE COPPER WIRE
BUSBAR.
ENCASE WITH 25mm Ø PVC PIPE
16mm² INSULATED COPPER CABLE
YELLOW/GREEN WITH GROUNDING KIT
CONNECTED TO GROUNDING BUSBAR 24 HOLES GROUNDING
BUSBAR EQUIPMENT PAD REFER TO NOTE 2
38mm² BARE COPPER WIRE

MCB
MTS
ROOFTOP LEVEL

38mm² BARE COPPER WIRE

GROUNDING ROD
GROUND LEVEL

TEST PIT

GROUNDING RISER DIAGRAM


PROJECT NAME: F&T 2022 MIN WIRELESS
ENGINEER: REV DESCRIPTION DESIGNED CHECKED APPROVED STATUS ELECTRICAL
BASE STATION PROJECT
V1 5G-NR PROJECT CODE: 21MIN0005 PAGE EL-02
C.DIEZ Z.CADER M. HARON

GLENN L. BRIONES
_____________________________________ SUBPROJECT NAME: PH1000026 NR REV 00
PROFESSIONAL ELECTRICAL ENGINEER
PRC NO.: 0004812 PTR NO.: 4591490 SITE NAME: SCALE AS SHOWN
TIN: 921-277-492 DATE ISSUED: 01/02/2024
SHEET NAME: GROUNDING RISER DIAGRAM DATE 30-JAN-2024
PLACE ISSUED: MALAYBALAY CITY, BUKIDNON