2441 BP LNGC
MEGI FGS SYSTEM
Preliminary
System overview
2
3
Overall Configuration Preliminary
Major Equipment : (MEGI +DFGE)+ (2HiCOM + PRS) DFGE : Dual Fuel Gen Engine (Wartsila)
MEGI : MAN B&W Electronically controlled
Gas-Injection (MAN)
No.2 HiCOM R HiCOM : HP Compressor system (BCA)
PRS : Partial Reliquefaction System
IGG/GCU : Inert Gas Generator /
DFGE FROM 2ND STAGE Gas Combustion Unit (Wartsila)
3
PRS R
PCHE
2 9 8
1
Gas/Liquid
Separator
5
LIT
6
LIC
H
L
RETURN
J-T valve
ME-GI LV TO TANK
7
Partial Reliquefaction System
(DSME Patent Pending)
GAS
DOME
ME-GI
Forcing
Combined Vaporizer
IGG/GCU
STRIPPING
PUMP
CARGO TANK 3
Preliminary
FGSS Equipment
4
5
FGSS Equipment - HiCOM
Preliminary
HiCOM system :
supplies the fuel gas of the MEGI engines and DFGEs by compressing BOG. It consists of a 5-stage high
pressure compressor which can compress BOG to high pressure for supplying fuel gas to the MEGI engines
directly. Fuel gas for the DFGEs is supplied from the 2nd stage outlet of the FG compressor.
No.1 FG Compressor
No.2 FG Compressor
G DF
G DF
BOG
G DF
G DF
MEGI MDO/
MEGI MGO/
HFO
5
6
FGSS Equipment - PRS
Preliminary
No.2 FG Compressor
G DF
G DF
BOG
G DF
G DF
MEGI MDO/
MEGI MGO/
HFO
6
7
FGSS Equipment - FRS
Preliminary
No.2 FG Compressor
G DF
G DF
BOG
G DF
G DF
MEGI MDO/
MEGI MGO/
HFO
7
8
FGSS Equipment – HiCOM+F/V
Preliminary
G DF F/V
BOG
G DF
G DF
MEGI MDO/
MEGI MGO/
HFO
8
Preliminary
9
PRS(FRS) Theory Preliminary
10
PRS(FRS) Concept Preliminary
1. Major Equipment
- Heat Recovery Unit(DCHE)
- Liquid/Gas Separator
- J-T Valves
0.025 bar g/31.5 oC 305 bar g/43 oC
4. Service:
Reliquefied to LNG & Return to Cargo Tank 0.05 bar g/-153.2 oC
3 bar g/-148.3 oC
0.05 bar g/-125 oC
11
Preliminary
12
PRS(FRS) Major Component
– DCHE(Diffusion Bonded Compact Heat Exchanger) Preliminary
13
PRS(FRS) Major Component
– Joule Thomson Valves Preliminary
14
PRS(FRS) Major Component
– Liquid Gas Separator Preliminary
15
PRS(FRS) Major Component
– GA & Cold Box Preliminary