SESSION PLAN

Sector : Electrical and Electronic


Qualification Title : Electrical Installation and Maintenance NC II
Unit of Competency : Perform roughing-in activities, wiring and cabling works for single-phase distribution,
power, lighting and auxiliary systems
Module Title : Performing roughing-in activities, wiring and cabling works for single-phase distribution,
power, lighting and auxiliary systems
Learning Outcomes
Install electrical metallic /nonmetallic (PVC conduit)
1. Install wire ways and cable tray
2. Install auxiliary terminal cabinet and distribution panel
3. Prepare for cable pulling and installation
4. Perform wiring and cabling lay out
5. Notify completion of work

A. INTRODUCTION
This unit covers the knowledge, skills and attitudes on installing electrical metallic and non-metallic conduit, wire ways
and cable clamp, auxiliary terminal cabinet and distribution frame panel board/safety switch and used in roughing-in
based on the required performance standards.

This unit also covers the outcomes required in preparing for cable pulling and installation, performing wiring and cabling
lay-out and notifying completion of work for single-phase distribution, power, lighting and auxiliary systems.

B. LEARNING ACTIVITIES
LO 1: Install electrical metallic /nonmetallic (PVC conduit)
Learning Content Methods Presentation Practice Feedback Resources Time
Interpret electrical Lecture Read information Answer self- Compare Provide sample 1
wiring diagrams and sheet 1.1-1 on check answer key electrical wiring hours
mechanical drawings Interpreting electrical 1.1-1 diagrams and
1.1-1
wiring diagrams and mechanical
mechanical drawings drawings for
and practice.

Identify proper usage Demonstration Read information Perform task Evaluate Supply a 1
and types of conduits, sheet 1.1-2 on sheet 1.1-2 performance guidebook or hour
fittings in electrical Identifying proper criteria chart outlining
installation. usage and types of check-list various conduit
conduits, fittings in 1.1-2 types and
electrical installation. associated
fittings.
Identify technique of Demonstration Read information Perform task Evaluate Supply a 1
installation and sheet 1.1-3 on sheet 1.1-3 performance guidebook or a hours
bending of conduit Identifying technique criteria learning material.
and fitting. of installation and check-list
bending of conduit 1.1-3
and fitting.
Apply proper usage of Demonstration Read information Perform task Evaluate Provide safety 1
safety harness. sheet 1.1-4 on sheet 1.1-4 performa harnesses for hour
Applying proper nce hands-on
usage of safety criteria learning and
harness. check-list emphasize
1.1-4 safety
protocols.

Interpret plan and Lecture Read information Answer self- Compare Provide sample 2
details drawing. sheet 1.1-5 on check answer electrical wiring hours
Interpreting plan key 1.1-5 diagrams and
1.1-5
and details drawing. mechanical
.
drawings for
practice.

Practice proper Demonstration Read information Perform task Evaluate Supply a list of 2
handling of materials, sheet 1.1-6 on sheet 1.1-6 performa tools and hour
tools and equipment proper handling of nce equipment
.
materials, tools and criteria along with
equipment check-list safety
1.1-6 guidelines for
each.

Practice procedure in Demonstration Read information Perform task Evaluate Supply a list of 5
proper bending of sheet 1.1-7 on sheet 1.1-7 performa tools and hours
conduits procedure in proper nce equipment
bending of conduits criteria along with
check-list safety
1.1-7 guidelines for
each.
Practice procedure in Demonstration Read information Perform task Evaluate Supply a list of 2
Installing conduits sheet 1.1-8 on sheet 1.1-8 performa tools, materials hours
proper procedure in nce and equipment
Installing conduits criteria along with
check-list safety
1.1-8 guidelines for
each.

Perform the Group Discussion Read information Answer self- Compare Supply a 1
installation sheet 1.1-9 on check answer guidebook or a hour
economically Performing the key 1.1-9 learning
1.1-9
installation material
economically
LO 2: Install wire ways and cable tray
Learning Content Methods Presentation Practice Feedback Resources Time
Identify use of Demonstration Read information Perform task Evaluate Provide a 2
materials, tools and sheet 1.2-1 on Using sheet 1.2-1 performa detailed list or hours
equipment of materials, tools nce guidebook of
and equipment criteria standard tools,
check-list materials, and
. 1.2-1 their functions.

Interpret Lecture Read information Answer self- Compare Distribute 2


electrical/mechanical sheet 1.2-2 on check 1.2-2 answer various hours
drawing Interpreting key 1.2-2 examples of
electrical/mechanica electrical and
l drawing mechanical
drawings for
individual and
group analysis.
Determine suitability Modular Read information Perform task Evaluate Supply 1
for installation and sheet 1.2-3 on sheet 1.2-3 performa specification hour
used of bus way, cable Determining nce sheets and 30
tray, fittings and suitability for criteria examples of minut
panels, conformity installation and check-list correct and es
with the provision of used of bus way, 1.2-3 incorrect
the PEC Code. cable tray, fittings component
and panels, usage.
conformity with the
provision of the PEC
Code.
Proper uses and Demonstration Read information Perform job Evaluate Equip the 5
installation of wire sheet 1.2-4 on sheet 1.2-4. performa training area hours
ways and cable trays Proper uses and nce with a variety of
installation of wire criteria wire ways,
ways and cable trays check-list cable trays, and
1.2-4. relevant tools
for practice.

Proper use of safety Demonstration Read information Perform task Evaluate Provide safety 30
harness (PPE) sheet 1.2-5 on sheet 1.2-5. performa harnesses and minut
Proper use of safety nce other PPE for es
harness (PPE). criteria hands-on
Provide a video clip check-list practice and
for a safety 1.2-5. safety training
demonstration materials.
showing how to wear
and secure a safety
harness properly
Interpret technical Lecture Read information Answer self- Compare Provide sample 1
plan sheet 1.2-6 on check answer electrical wiring hour
Interpreting plan key 1.2-6 diagrams and
1.2-6
and details drawing. mechanical
drawings for
practice.

Use effective Group Discussion Read information Answer self- Compare Provide a 2
communication skills sheet 1.2-7 on Using check answer detailed list or hours
(written and oral ) effective key 1.2-7 guidebook of
1.2-7
communication standard tools,
skills materials, and
their functions.
Practice effective use Lecture/ Read information Perform task Evaluate Provide 1
of measuring tape Demonstration sheet 1.2-8 on sheet 1.2-8 performa measuring tape hour
effective use of nce and materials
measuring tape criteria
check-list
1.2-8
Perform the Lecture Read information Perform task Evaluate Provide a 1
installation sheet 1.2-9 on sheet 1.2-9 performa detailed list or hour
economically Performing the nce guidebook
installation criteria
economically check-list
1.2-9
LO 3: Install auxiliary terminal cabinet and distribution panel
Learning Content Methods Presentation Practice Feedback Resources Time
Learn and apply Demonstration Read information Perform task Evaluate Provide various 2
mensuration sheet 1.3-1 on sheet 1.3-1 performa measuring tools hours
Learning and nce and reference
applying criteria guides on
mensuration check-list measurement
1.3-1 units and
. conversion.

Determine blue print Modular Read information Answer self- Compare Distribute 2
reading and materials sheet 1.3-2 on check 1.3-2 answer sample hour
specification Determining blue key 1.3-2 blueprints and
print reading and materials
materials specification
specification sheets for
analysis.
Read proper proofing Modular Read information Answer self- Compare Provide a 1
standard sheet 1.3-3 on Read check answer detailed list or hours
proper proofing key 1.3-3 guidebook
1.3-3
standards

Proper procedure in Demonstration Read information Perform task Evaluate Supply 1


installation of sheet 1.3-4 on sheet 1.3-4. performa necessary tools hour
auxiliary terminal Proper procedure in nce and
cabinet and installation of criteria components for
distribution panels. auxiliary terminal check-list auxiliary
cabinet and 1.3-4 terminal
distribution panels. cabinet and
distribution
panel
installation
Proper use of safety Demonstration Read information Perform task Evaluate Provide safety 30
harness and PPE sheet 1.3-5 on sheet 1.3-5. performa harnesses for minut
Proper use of safety nce hands-on es
harness and PPE criteria practice and
check-list relevant safety
Use a step-by-step 1.3-5. guidelines
demonstration or
video to Conduct a
safety demonstration
showing how to wear
and secure a safety
harness.
Interpret technical Group discussion Read information Perform task Evaluate Provide sample 1
plan sheet 1.3-6 on sheet 1.3-6 performa technical plans hour
Interpreting nce and reference 30
technical plan criteria materials on minut
check-list interpreting es
1.3-6 plan symbols
and
terminology

Practice effective use Demonstration Read information Perform task Evaluate Offer various 1
of measuring devices sheet 1.3-7 on sheet 1.3-7 performa measuring hour
effective use of nce devices and
measuring devices criteria worksheets for
check-list practicing
1.3-7 measurements
Practice proper Demonstration Read information Perform task Evaluate Provide a list of 1
handling of tools and sheet 1.3-8 on sheet 1.3-8 performa standard tools hour
equipment proper handling of nce and safety
tools and equipment criteria guidelines for
check-list each
1.3-8

Install terminal Demonstration Read information Perform job Evaluate Provide the 1
cabinet and sheet 1.3-9 on sheet 1.3-9 performa necessary tools, hour
distribution panel Installing terminal nce components,
.
cabinet and criteria and safety
distribution panel check-list equipment for
1.3-9 installation
practice

Perform the Lecture Read information Perform task Evaluate Provide best 1
installation sheet 1.3-10 on sheet 1.3-10 performa practices and hour
economically Performing the nce tips for
installation criteria reducing costs
economically check-list while
1.3-10 maintaining
safety and
quality.
LO 4: Prepare for cable pulling and installation
Learning Content Methods Presentation Practice Feedback Resources Time
Read and familiarize: Lecture Read information Answer self- Compare Provide sample 2
mensuration, blue sheet 1.4-1 on check answer blueprints and hours
print reading and mensuration, blue key 1.4-1 materials
1.4-1
materials print reading and specification
specification, uses of materials guides.
wires, cables and specification, uses of
tools, required sizes of wires, cables and
cable based on PEC tools, required sizes
Wire Table of cable based on
PEC Wire Table

Prepare cable for Lecture Read information Perform task Evaluate Provide cable- 30
installation sheet 1.4-2 on sheet 1.4-2 performa stripping tools minut
Preparing cable for nce and various es
installation criteria cable types for
check-list demonstration.
1.4-2

Interpret technical Lecture Read information Answer self- Compare Offer sample 1
plan and drawing sheet 1.4-3 on check 1.4-3 answer technical plans hour
Interpreting key 1.4-3 and reference
technical plan and materials for
drawing interpreting
plan symbols
and
terminology.
Practice effective use Demonstration Read information Perform task Evaluate Provide various 30
of measuring tapes sheet 1.4-4 on sheet 1.4-4 performa measuring minut
effective use of nce tapes and es
measuring tapes criteria exercises
check-list requiring
1.4-4 accurate
measurements

Practice proper Demonstration Read information Perform task Evaluate Provide a 1


handling of tools and sheet 1.4-5 on sheet 1.4-5 performa selection of hour
equipment proper handling of nce common tools
tools and equipment criteria and safety
check-list equipment for
1.4-5 hands-on
learning.

Apply methods and Demonstration Read information Perform task Evaluate Offer a variety 1
techniques in various sheet 1.4-6 on sheet 1.4-6 performa of wires, cables, hour
type of wiring wires Applying methods nce and related
and cables. and techniques in criteria tools for hands-
various type of check-list on practice
wiring wires and 1.4-6
cables.
LO 5: Perform wiring and cabling lay out
Learning Content Methods Presentation Practice Feedback Resources Time
Read and familiarize: Lecture Read information Answer self- Compare Provide sample 4
Mensuration, Blue sheet 1.5-1 check answer blueprints, hours
print reading and key 1.5-1 materials
1.5-1
materials Explain how to read specification
specification, blueprints, sheets, and
Application of pulling understand types of pulling
compound, Methods materials compounds
in cable pulling specifications, and
use pulling
compounds in cable
pulling methods.
Interpret technical Lecture Read information Answer self- Compare Offer technical 3
plan and drawing sheet 1.5-2 on check 1.5-2 answer plans and hours
Interpreting key 1.5-2 reference
technical plan and materials to
drawing help students
understand
different
sections
Apply methods in Demonstration Read information Perform task Evaluate Provide cable 4
cable pulling sheet 1.5-3 on sheet 1.5-3 performa pulling tools hours
Applying methods in nce and various
cable pulling criteria cables for
check-list demonstration
1.5-3 and practice

Follow procedures in Lecture Read information Perform Job Evaluate Provide visual 5
bending radius and sheet 1.5-4 on sheet 1.5-4 performa aids showing hours
loop tolerances for procedures in nce bending radius
cables. bending radius and criteria limits and loop
loop tolerances for check-list tolerances for
cables. 1.5-4 various types of
cables

LO 6: Notify completion of work


Learning Content Methods Presentation Practice Feedback Resources Time
Describe processes, Lecture Read information Answer self- Compare Provide visual 1
Operations Systems sheet 1.6-1 on check answer aids showing hour
Describe processes, key 1.6-1 tool
1.6-1
- Maintenance of tools Operations Systems maintenance
& materials and techniques and
- Storage of tools Describe how proper storage
electrical processes methods.
and operations
systems work, along
with best practices
for maintaining and
storing tools and
materials.
Check and conform Demonstration Read information Perform task Evaluate Supply 1
the installation based sheet 1.6-2 on sheet 1.6-2 performa checklists and hour
on job requirement Checking and nce reference
.
conforming the criteria materials
installation based on check-list detailing job
job requirement 1.6-2 requirements
and industry
standards.
Practice good Demonstration 5S + 1 reading Conduct Should Supply 1
housekeeping material Inspection in learn to checklists and hour
your area to identify reference
prevent hazards materials
that can cause hazards detailing job
accident requirements
and industry
standards.
Perform Lecture Read information Answer self- Compare Provide testing 1
commissioning sheet 1.6-3 on check answer equipment and hour
activities commissioning key 1.6-3 commissioning
1.6-3
activities checklists for
reference.

C. ASSESSMENT PLAN
 Oral questioning

-This is an insight into trainee’s ability and personality


-Must have knowledge in roughing in, wiring and cabling works for single-phase distribution, power, lighting, and
auxiliary systems.
-Every interview has maximum of 30 minutes

 Performance Test

-This is to determine if the trainee is capable of doing the job


- Must perform in roughing in, wiring and cabling works for single-phase distribution, power, lighting, and auxiliary
systems.
-Demonstration must be performed within 5 hours

 Written Test
-This is to evaluate the trainee's theoretical knowledge of electrical installation and maintenance.
-The test duration is a maximum of 60 minutes, and it consists of multiple-choice questions.
D. TEACHER’S SELF-REFLECTION OF THE SESSION

The competency-based learning module used in the training is very informative, providing a solid foundation in electrical
installation and maintenance. Nonetheless, enhancing its presentation with relevant images, such as diagrams of electrical
wiring or step-by-step visuals for safety procedures, would greatly improve comprehension and engagement.