You are on page 1of 1

(1)

(8) (22)(26)(20)(16)
(2) (6) (21)(17)
(12) (14) (9)
(4) (5) (7)(18)(19)
(3) (11)(13) (10)

(28) (32)

(24) (15) (23) (27)


(25)

(30)

(31)

CONCOURSE
CONCOURSE
ASS-1 1
LIST OF UTILITY

Telephone Cable .
2 CESC 11 KV Cable (2NOS) .
3 BSNL Cable .
4 Unknown Cable .
5 CESC 11 kv Cable . Diverted
6 Unknown Cable .
7 CESC 11 KV Cable. Diverted
8 Telephone Cable (3NOS) . Diverted
9 BSNL Cable (2NOS) . Diverted
10 BSNL Cable (3NOS) . Diverted
11 Optical Fiber . Diverted
CONCOURSE 12 BSNL Cable . Diverted

CONCOURSE 13 BSNL Cable .


14 BSNL Cable .
Diverted
Diverted
15 100 mm Ø KMC Water Pipe . Diverted
16 Unknown Cable. Diverted
17 Unknown Cable. Diverted

OTE DUCT OTE DUCT 18 CESC 11 KV Cable .


19 CESC 11 KV Cable .
Diverted
Diverted

OTE DUCT OTE DUCT 20 Telephone Line .


21 Telephone Line .
Diverted
Diverted

CL TRACK CL TRACK 22 Unknown Cable .


23 750 mm Ø KMC Water Line .
Diverted

CL TRACK
Diverted

CL TRACK 24 Sewerage Line 200 mm Ø (EW).


25 300 mm Ø Gas Line (Dead).
Diverted
Diverted
26 Otical Fiber Cable . Diverted
27 750 mm Ø KMC Gangajal Line. Diverted
28 CESC Cable 11 kv .

PLATFORM
Diverted
29 Sewer Line 200 mm Ø (EW) . Diverted
30 CESC 11 kv Cable .

PLATFORM 31 Brick Sewer Drain .


32 CESC Cable .
Diverted
Diverted

PLATFORM PLATFORM LVL.


PLATFORM PLATFORM LVL.

UPE UPE
UPE UPE DUCT
DUCT
DUCT DUCT UNDERCROFT LVL.
UNDERCROFT LVL.

SECTION AT CH.9780m
STAGE-2
ROAD WIDENING SECTION AT CH.9780m
STAGE-3
ROAD WIDENING & UTILITY DIVERSION

(1)

(8) (22)(26)(20) (16)


(2) (6) (21)(17)
(12) (14) (9)
(4) (5) (7)(18)(19)
(3) (11)(13) (10)

(28) (32)

(24) (15) (23) (27)


(25)

(30)

(31)

CONCOURSE
ASS-1

CONCOURSE

OTE DUCT OTE DUCT


CL TRACK CL TRACK

PLATFORM

PLATFORM PLATFORM LVL.

UPE UPE
DUCT DUCT
UNDERCROFT LVL.

SECTION AT CH.9780m
STAGE-4
CONSTRUCTION OF METRO WORK & TRAFFIC MOVEMENT
METRO RLY's DRAWING NO :
GENERAL CONSULTANCY
PROJECT NAME:
TÜMAŞ CONSTRUCTION OF MOMINPUR - ESPLANADE SECTION OF JOKA -
ESPLANADE METRO CORRIDOR

UTILITY
India

DRAWING TITLE:
SIGNATURE SECTION AT CH. 9780M

SHEET = A3
Güner İNCİ Altamash
Harsimran Singh C.P. Singh A.K. Bhattacherjee G.Nag
S.Sett DRAWING NO : DATE
NAME & Team Leader Sr. Geologist Utility Expert SHEET. 1
DESIGNATION Sr.DGM/CIVIL/EXPT. RE/ SURVEY SCALE: NTS REV.
CPM/KOL-II AGM/CIVIL APPROVED BY CHECKED BY DRAWN BY KOLK-MOES-YPJ-V04-UI-DWG-005 3 04-04-2022