P S ARUN - Resume

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ARUN SAJEEV

Business Developer / Naval Architect


+971 529695863 Room : 603, Al Jaber Building
+91 9895114144 Al nadha 2, Dubai
https://www.linkedin.com/in/p-s-arun- 198008169
Arunsajeev2018@gmail.com

To obtain a challenging position in a high quality engineering environment where my Years of experience
experience and academic skills will add value to organizational operations. 2 yrs

Employment history Education


 Business Development Executive at Green Palm Marine Consultancy, Dubai (Sep B.Tech in Naval Architect and
2023 - Present) Shipbuilding Engineering from
 Business Developer/Naval Architect at Green Palm Oil & Gas (Oct 2022 - Sep 2023) (See Narayana Gurukulam
College of Engineering - Cochin)
 Internship Trainee at Power Boat Galleria (July 2022 - Aug 2022 )
Skills
 Internship Trainee at Sea Blue Shipyard Pvt. Ltd (July 2021 - July 2021) Ms. – Office, Excel, PowerPoint, Projects
AutoCAD
Experience
Languages
 MARKETING & ROPOSAL PREPARATION
English
 Proposal For Subsea Pipeline Feed And Technical Support For Fso Hiring
Malayalam
 Proposal For Pre-FEED & FEED of CPP Platform Modification & SBM to FSO Hindi
Transfer System

 Proposal For Survey & Engineering For Pad Eyes & Support Frames for Asry

 Proposal For ADNOC Floating Fueling Station

 Proposal For SPM Analysis For Vessel Delfine - Eagle Marine

 Proposal For Basic And Detail Design Of Vessel - RAAD’s Marine

 Proposal For Stability Booklet Updation

 Proposal For Subsea Pipeline Feed And Technical Support For Fso Hiring - ONGC

 Proposal For Installation Engineering Of Seawater Intake Pipeline

 Proposal For Aras Driller'S Draft Modification


 Proposal For Marine Parts of Al Maryah Waterfront Project - AL NASR

- Tender Document Preparation.

- Logistics Plan for the components from yard to the site.

- Drilling Method Statement for the piles.

- Float off Method Statement for the floating platform.

 DOCUMENT PREPARATION
 HSE Document And Policy Preparation

 QSM Manuel Preparation

 Pre Qualification Document (PQD)

 Non-Disclosure Agreement (NDA)


Continued...

 Master Service Agreement (MSA)

 Memorandum Of Understanding (MOU)

 MDR, CTR etc..

 List of Projects, Enquiry Register, etc..


 POWERPOINT PRESENTATION
 Pipeline Replacement Project(PRP-8) - Oil and Natural Gas Corporation Ltd.

 Business Development Plan

 Detail Engineering For Floaters

 Offshore Transportation and Installation

 Ports and Marine Terminals

 Jack Up rigs

 Marine Vessel Conversion

 Project Execution Methodology for Detail Engineering

 Onshore and Costal Case Study

 Offshore Platform - Case study

 FPSO vs FSO vs Fixed Platform Comparison  etc..

 VENDOR REGISTRATION
Complete Vendor Registration process for the following company’s including preparation of documents.

 WOOD

 Zamil Shipyard

 Nkom

 Neom

 Malaysian Heavy Engineering, etc..

 RESOURSE PLANNING
 Man Hour Estimation (Manpower Histogram)

 Project scheduling

 MARKET ASSESSMENT STUDY OF EXCISTING RIG TO MOPU & BARGE TO FPU - ADANI WELSPUN

 Preliminary MOPU Concept Study Report.


 Market Survey
 Capex and Opex Report.
 Business Model Preperation

 ENGINEERING
 Drafting - Mooring Arrangement of Vessel Near Offshore Platform

 MTO Calculation

 Wind Area Calculation - using AutoCAD & Excel

Page 2 of 3

You might also like