Professional Documents
Culture Documents
IVR - 48-32-002501-Rev-01
IVR - 48-32-002501-Rev-01
Page: 1 of 11
ACTIVITY
1)inspected No. Product Qty
Material: 1 NIOC-48-32-002501-DRILL PIPE 2-7/8″ 31000 FT
(Material
description,
Quantity,
Part/Item No. in
detail)
2)Scope of Items in approved Contract
inspection: ➢ Item 1, Visual inspection.
(In detail) ➢ Item 2, Marking inspection.
➢ Item 3, Packing inspection.
➢ Item 4, Review document.
4)Instruments
used:
(Name, Calibration Date
& Serial/No.)
5)Inspection According to Contract No. 48-32-0025001, inspector visited TIANHE OIL GROUP HUIFENG
Description: PETROLEUM EQUIPMENT CO., LTD sub-vendor Shandong Mingzhu to carry out the
inspection, the details as below:
(Detailed Scope
of Inspection) ➢ Item 1, Visual inspection.
Inspector performed visual inspection for pin and box threads of tool joints of the drill
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 2 of 11
pipes, phosphating film surface was smooth, no damaged threads was found.
Inspector performed visual inspection for drill pipes body, internal flush connection, the
drill pipes were new and unused, no pit, scratch and damage was found.
Inspector performed inspection for the coating, all the drill pipes external surface were
painted black coating for protection from corrosion, the coating was smooth, hard to
touch.
Inspector performed visual inspection for internal coating of the drill pipes, the coating
was smooth, hard to touch, free of foreign material, no defects. The coating color was
green.
Result was accepted.
➢ Item 2, Marking inspection.
Inspector randomly checked marking for the drill pipes, the marking is clear, the marking
information conform to API 5DP, and result was acceptable, details as following:
Stencil marking of drill pipes as following:
MADE IN CHINA TIANHE 01 24 2 7/8″ 10.40 G EU L2 Length Weight tool joint traceability
code.
Stamp marking on outside surface of box tool joints as following:
TIANHE API SPEC 5DP-0048 <API Monogram> 1223 23708988 NC31 L2 tool joint No.
Stamp marking at box counterbore tool joints as following:
TH 01 24 G 2 NC31 L2
Stamp marking on outside surface of pin tool joints as following:
TIANHE API SPEC 5DP-0048 <API Monogram> 1223 23768988 NC31 L2 tool joint No.
Stamp marking at base of pin threads of pin tool joints as following:
TH 01 24 G 2 NC31 L2 tool joint traceability code.
Stamp marking on mill slot for pin ends:
TDG2
Result was accepted.
The protectors were installed on both end threads (pin and box threads), thread
protectors are plug type, the factory taped the vents of the external thread protectors ,
so as to avoid threads and internal coating being damage.
All threads (Pin and Box) were fully coated with thread compound.
Inspector checked packing for the drill pipes, no damaged drill pipes or protector was
found, each bundle used 3 sets of metal racks and 9 steel straps, metal racks were with
lock- nuts. Each layer of pipes was underlaid with rubber at the contact surface of the
metal racks, to prevent the metal racks damaged the pipe body.
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 3 of 11
Inspector reviewed the process quality records, below documents were provided for
review during this visit, the results can be conformed to client’s requirements.
a. MTC of raw material. The green pipes were purchased from Linzhou Fengbao, sub-
vendor heat treated to G105 grade PSL-2 level. The pipe body OD was 2-7/8 in, ID was
2.151 in, thickness was 0.362 in.
b. MTC of tool joint. the tool joints were purchased from Yanchen Teda. The tool joint ID
was 2 in, OD was 4-1/8 in. Tool joint was phosphating treatment, the thread met API 7-2
requirements, the tool joint met the G105 PSL-2 requirements of API 5DP.
c. Certificate of conformity.
d. Calibration certificates of gauges.
e. Drill pipe tally sheet, 2-7/8″10.4ppf G105 grade EU(external upset), single length range
9.42~9.75m(31~32 FT),met the requirements of contract.
f. MTC of finished drill pipe is provided and checked by inspection office in Tehran.
details see attachment 1-5, result was accepted.
6) Non- NA
Conformances:
(If there is any)
7) Further NA
Activities:
(Next inspection
schedule, etc.)
8) Conclusion: ➢ Item 1, Visual inspection, accepted.
(Short & clear ➢ Item 2, Marking inspection, accepted.
explanation)
➢ Item 3, Packing inspection, accepted.
➢ Item 4, Review document, accepted.
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 4 of 11
9) Attachments:
(Any Reviewed, Attachment-1 Drill pipe tally sheet
Approved/Signed Attachment-2 MTC of raw material
Documents by Attachment-3 MTC of tool joint
Inspector)
Attachment-4 Calibration certificates of gauges
Attachment-5 Certificate of conformity
11) Photos:
(With short Description )
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 5 of 11
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 6 of 11
Stamp marking at base of box thread Stamp marking at base of pin thread
Stamp marking at base of pin thread Stamp marking on pin outside surface
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 7 of 11
Stamp marking at base of pin thread Stamp marking on mill slot for pin end
Stamp marking on mill slot for pin end Stamp marking at base of box thread
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 8 of 11
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 9 of 11
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 10 of 11
F-OD-003 REV.: 4
INSPECTION VISIT REPORT
Page: 11 of 11
Approved by:
Shiva-Jalal 01.24.2024
End
F-OD-003 REV.: 4