Professional Documents
Culture Documents
Datasheet
Datasheet
• OI.<O,'^,.*."«,«.O
I--V-TPH-0-HZ
ST V
PROTEC TION : E EXd n B T£
t
c\X^ )
CLIENT GOGPC
J O B NUMBER
S E R I A L NUMBER
REQ/SPECNO.
P U R C H O R D E R NO.
When you have completed the D S highlight the whole page format cells pattern none
Delete these notes on completion
COMMENTS:
DATA SHEETS
I T E M No. ATT ITEM No. ATT I T E M No. ATT
TURBINE
02
01
00 27 July 2021 ISSUED FOR P U R C H A S E RAZAVI HADIDI
C E N T R I F U G A L PUMP DATA S H E E T
Sheet 1 1 of 8
CENTRIFUGAL PUMP DATA SHEET
1 Note A P P L I C A B L E T O : PURCHASE A P P L I C A B L E NTL/INTNTL STANDARD: OTHER SPECIFY API-eiO & IPS-G-PM.105 Rev
2 FOR GACHSARAN OIL & G A S PRODUCTION COMPANY (GOGPC) UNIT NGL-900
6 LIQUID C H A R A C T E R I S T I C S
12 VISCOSITY cP
1 1.5 H 2 S C O N C E N T R A T I O N (ppm): (6.12.1.12) 20-100
16 PUMPING T E M P E R A T U R E : 'C
52 20 20
-40
17 FLOW mVh
12 11 10
18 D I S C H A R G E P R E S S U R E : (6.3.2) bara
J2^ 9.01 8.01
N O T E 2,3
19 SUCTION PRESSURE bara
6 1.35 1.30 1.08
20 DIFFERENTIAL PRESSURE bar
7.67
21 DIFFERENTIAL HEAD
97.73
22 NPSHA N O T E 4,5 i ^^Vf^'f.
23 HYDRAULIC POWER kW
25 LOCATION: COOLING W A T E R :
35 Min
38 VOLTAGE 400
39 PHASE 3
40 HERTZ 50
41
PERFORMANCE D R I V E R (7.1.5)
42
P R O P O S A L C U R V E NO. _ RPM Driver Type MOTOR
43
A s Tested Curve No. GEAR
44
I M P E L L E R DIA.: R A T E D _ MAX. MIN. mm VARIABLE S P E E D REQUIRED
45
RATED POWER kW EFFICIENCY (%) S O U R C E OF VARIABLE S P E E D
46
R A T E D C U R V E B E P F L O W (at rated impeller dia) mYh OTHER
47
MIN F L O W : THERMAL mVh STABLE m'/h MANUFACTURER
48
P R E F E R R E D O P E R A T I N G R E G I O N (6.1.11) to _ mVti NAMEPLATE POWER kW
49
ALLOWABLE OPERATING REGION to _ mVti Nominal R P M
50
MAX H E A D @ R A T E D I M P E L L E R m R A T E D LOAD R P M
51
MAX P O W E R @ R A T E D I M P E L L E R (6.8.9) kW F R A M E OR MODEL
52
NPSH3 AT R A T E D FLOW : m ORIENTATION
53
C L P U M P T O U/S B A S E P L A T E m LUBE
54
N P S H MARGIN A T R A T E D F L O W : m BEARING TYPE:
55
S P E C I F I C S P E E D (6.1.9) m3/ti, rpm, m RADIAL
56
S U C T I O N S P E C I F I C S P E E D LIMIT THRUST
57
SUCTION S P E C I F I C S P E E D m3/h, rpm, m STARTING METHOD
58
MAX. A L L O W . S O U N D P R E S S . L E V E L R E O D (6.1.14) 90 (dBA) S E E D R I V E R DATA S H E E T
59
E S T MAX S O U N D P R E S S . L E V E L (dBA)
60
MAX. S O U N D P O W E R L E V E L R E O ' D (6.1.14)
61
E S T MAX S O U N D P O W E R L E V E L
1 Note CONSTRUCTION
8 P R E S S U R E C A S I N G A U X . C O N N E C T I O N S : (6.4.3.2)
10 S U C T ' N P R E S S . R E G I O N S D E S I G N E D F O R MAWP
12 VENT • I M P E L L E R S INDIVIDUALLY S E C U R E D :
16 S H A F T F L E X I B I L I T Y INDEX ( S F I ) (9,1.1.3)
17 Drain Valve Supplied By SUPPLIER First Critical Speed Wet (Multi stage pumps only)
20 V E N T S MANIFOLDED
22 S P E C I A L F I T T I N G S F O R T R A N S I T I O N I N G (6.4.3.3) MANUFACTURER
23 C Y L I N D R I C A L T H R E A D S R E O U I R E D (6.4.3.8) MODEL
27 DRAIN T O S K I D E D G E RIGID
30 C O U P L I N G WITH P R O P R I E T A R Y C L A M P I N G D E V I C E (7.2.11)
APPENDIX H CLASS S-1
31 MIN D E S I G N M E T A L T E M P (6.12.4.1)
32 C O U P L I N G IN C O M P L I A N C E WITH (7.2.4)
R E D U C E D - H A R D N E S S M A T E R I A L S R E O ' D (6,12.1.12.1)
33 C O U P L I N G G U A R D S T A N D A R D P E R (7.2.13.a)
Applicable Hardness Standard (6.12.1.12.3)
34 Window on Coupling Guard
BARREL:
35 CASE:
36 BASEPLATE
DIFFUSERS
37 API B A S E P L A T E NUMBER :
IMPELLER:
38 B A S E P L A T E C O N S T R U C T I O N (7.3.14)
IMPELLER W E A R RING :
39 B A S E P L A T E D R A I N A G E (7.3.1)
C A S E W E A R RING :
40 MOUNTING :
SHAFT:
41 Bowl(ifVS-type) N O N - G R O U T C O N S T R U C T I O N : (7.3.13)
45 RADIAL / • DRAIN C O N N E C T I O N
14 COOLING REQ'D
15 VIBRATION P R O B E S (7.4.2.2) COOLING WATER PIPING PLAN
16 PROVISIONS FOR VIB. P R O B E S COOLING WATER PIPING
17 NUMBER P E R RADIAL BEARING FITTINGS
18 NUMBER P E R AXIAL BEARING COOLING WATER PIPING MATERIALS
COOLING WATER REQUIREMENTS:
19 MONITORS AND C A B L E S SUPPLIED BY (7.4.2.4) BEARING HOUSING mYtl
20 HEAT EXCHANGER m'/h
21 T E M P E R A T U R E (7.4.2.3) TOTAL COOLING WATER m'/h
27 NUMBER P E R THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
28 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT
29 P R E S S U R E GAUGE T Y P E DRAIN
30 Remarks COOLING WATER
31 TAG ALL ORIFICES (7.5.2.4)
32 S O C K E T WELD CONN ON S E A L GLAND (7.5.2.8)
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
% •
52
53
54
55
56
57
58
59
60
61
62
63
64
65
30 B A S E P L A T E T E S T (7.3.21)
31 HYDROSTATIC
32 HYDROSTATIC T E S T OF BOWLS & COLUMN (9.3.13.2)
33 OTHER P U R C H A S E R REQUIREMENTS PERFORMANCE T E S T
34 COORDINATION MEETING REQUIRED (10.1.3) T E S T IN COMPLIANCE WITH (8.3.3.2)
35 MAXIMUM DISCHARGE P R E S S U R E TO INCLUDE T E S T DATA POINTS TO (8.3.3.3)
36 MAX RELATIVE DENSITY T E S T T O L E R A N C E S TO (8.3.3.4) f_
37 OPERATION TO TRIP S P E E D NPSH (8.3.4.3.1) (8.3.4.3.4)
38 MAX DIA. I M P E L L E R S AND/OR NO OF S T A G E S NPSH-1ST S T G ONLY (8.3.4.3.2)
39 CONNECTION DESIGN APPROVAL (9.2,1.4) NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)
40 TORSIONAL ANALYSIS / R E P O R T (6.9.2.10) T E S T NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)
41 PROGRESS REPORTS R E T E S T ON SEAL LEAKAGE (8.3.3.2.d)
42 OUTLINE OF PROC FOR OPTIONAL T E S T S (10.2.5) R E T E S T REQUIRED A F T E R FINAL HEAD ADJ (8.3.3.7.5)
43 ADDITIONNAL DATA REQUIRING 20 Y E A R S RETENTION (8.2.1.1) COMPLETE UNIT T E S T (8.3.4.4.1)
44 SOUND LEVEL T E S T (8.3.4.5)
45 CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)
LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3)
46
MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION
47
DYNAMIC BALANCE ROTOR (6.9.4.4) ': NOZZLE LOAD T E S T
48
INSTALLATION LIST IN PROPOSAL (10.2.3.1) C H E C K FOR CO-PLANAR MOUNTING PAD S U R F A C E S
49
VFD STEADY S T A T E DAMPED R E S P O N S E ANALYSIS (6.9.2.3) MECHANICAL RUN T E S T UNTIL OIL TEMP S T A B L E
50
4 HR. MECH RUN A F T E R OIL TEMP S T A B L E (8.3.4.2.1)
51
TRANSIENT TORSIONAL R E S P O N S E (6.9.2.4) 4 HR. MECH RUN T E S T (8.3.4.2.2)
52
BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)
IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) B R G HSG RESONANCE T E S T (8.3.4.7)
54 FLANGES ROD IN PLACE OF S K T WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS A F T E R T E S T
55 INCLUDE PLOTTED VIBRATION S P E C T R A (6.9.3.3) (9.2.7.5)
56 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT T E S T (8.3.4.6)
57 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO B E INCLUDED IN AUXILLIARY T E S T S
58 VENDOR TO K E E P REPAIR AND HT RODS (8.2.1.1.c)
59 VENDOR SUBMIT T E S T P R O C E D U R E S (8.3.1.1) LOCATION OF AUXILIARY EQUIPENT T E S T
60 SUBMIT INSPECTION C H E C K LIST (8.1.5)
61 IMPACTTEST (6.12.4.3) P E R E N 13445
62 P E R ASME SECTION VIII
REMOVE CASING A F T E R T E S T
9
STATIC THRUST N N LINE S H A F T DIAMETER
mm
10
A T MIN FLOW
AT RATED FLOW
N
N
N T U B E DIAMETER
mm
N LINE SHAFT COUPLING:
11 A T MAX FLOW N N LINESHAFT CONNECTION
12 MAX T H R U S T N N
13 SOLEPLATE REQUIRED • SUCTION STRAINER T Y P E
14 S O L E P L A T E Length x Width m • LEVEL CONTROL
15 SOLEPLATE THICKNESS mm IMPELLER COLLETS ACCEPTABLE
16 MOUNTING F L A N G E R E Q U I R E D H A R D E N E D S L E E V E S U N D E R B E A R I N G S (9.3.10.5)
17 COLUMN PIPE: RESONANCE T E S T
18 DIAMETER mm S T R U C T U R A L A N A L Y S I S (9.3.5)
19 LENGTH m
20 NUMBER DRIVER ALIGNMENT S C R E W S
21 SPACING SUCTION CAN
22 GUIDE BUSHINGS: SUCTION CAN THICKNESS mm
23 NUMBER LENGTH m
24 LINE S H A F T B E A R I N G S P A C I N G DIAMETER mm
25 GUIDE BUSHING L U B E : S E P A R T A T E M O U N T I N G P L A T E (9.3.8.3.1)
26 P R O V I D E S E P A R A T E S O L E P L A T E (9.3.8.3,3)
27 D R A I N P I P E D T O S U R F A C E (9.3.13.5)
28 BOWL HEAD CALCULATION R E Q U I R E D
29 M A T E R I A L S (additional)
30 S U C T I O N CAN / B A R R E L : LINESHAFT S L E E V E S :
35 BELLMOUTH : HEAD
38 SUMP ARRANGEMENT
39 SUMP DIMENSIONS:
40 GRADE ELEVATION 1 m
41 LOW LIQUID LEVEL 2 m
42 C L . OF DISCHARGE 3 m
43 SUMP DEPTH m
44 PUMP LENGTH m
45 GRADE TO DISCH. Is _ m
46 GRADE TO LOW LIQUID LVL U m
47 GRADE TO 1ST STG IMPL'R. Is m
48 SUBMERGENCE REO'D le _
49 SUMP DIAMETER
50
51
52
T 1
53
54
55
56
57
WELDING AND R E P A I R S
20 RADIOGRAPHY
21 ULTRASONIC INSPECTION
22 MAGNETIC P A R T I C L E INSPECTION
23 LIQUID P E N E T R A N T INSPECTION
24 VISUAL INSPECTION (all surfaces)
25
26 REMARKS:
27
28
29
30
31
32
33
34
36
37
38
39
40
41
42
43
44
45
46
47
48
50
51
52
53
1 Note Rev
2 1) Max & min values refer only to the property listed.
3
4 2) Due to the special operation condition for flare system, gas phase & liquid phase In K.O.Drum are In equilibrium. Therefore vapor pressure of liquid
5 is equal to K.O.Drum pressure. The K.O.Drum pressure varies from 1.08 to 6 bara.
7 3) Suction pressure =K.O.Drum pressure (vapor pressure) + some static head - friction head.
8
g 4) Due to the special operation condition for flare system, NPSHa = some static head - friction head. .«r "S'
10 J^..^ 1
11
5) The maximum acceptable NPSH (required) is 1.75 m. ; S' *'7>>v^ ^ '
12
15
•
-
16
17
18
19
20
21
22
'
23
24
25
26
27
28
29
30
31
32
33
34
35
36
87
38
39
4n
41
4
848
43
AA
88
4
883
4
8DR
4
8/7
4R
80
4Q
80
50
51
52
53
84
•8
88
56
57
58