ABSTRACT OF COST

NAME OF WORK :-
(S/H :- C/O OHSR 64000 Ltrs.capacity with 3.00 Metre Staging height.)
S.No. Description of item Quantity Rate Unit Amount
1) Construction of RCC over head tank 64000 litres with 3.00 meters
staging height from ground level to bottom of dome slab comprising of inlet, 64000.00 4.65 /Litre 297600.00
scour & over flow pipes as per deatails given below from G.L. to tank including
bends of required degrees,valves of reqd.size conforming to relevants codes
RCC Spiral 1.0 wide stair case/MS stair case i/c GMS pipe railing as per
IS specification,steel ladder 45cms.wide of usual height as per site requirement
irement ,SFRC manhole cover (Medium duty) of 560 mm dia.and weight of
frame and cover should not be less than 100 kg, ventilator at top dome with
minimum opening of 90x90 cms., water level indicator including floats and
measuring gauge, lightening conductor with earthing arrangement etc.
The RCC over head reservoir shall include randering/plastering of the uneven
expose surface, two coats of snowcem paint and any other component reqd.
for the completion of the job to the entire satisfaction of Engineer-in-charge.
The offers shall also include detail structural drawing / design calculations to
be approved by the competent authority based on the raft foundation by
taking seismic forces in the design calculation expension joints as required at
site.The offer shall also i/c the cost of providing and fixing of GMS/MS pipes,
and valve/fitting complete i/c duck foot bends,puddle collars,expansion joints
etc.connecting with rising main & distribution main with reqd. length from the
edge of foundationand any other components required for the completion of
job upto the entire satsfactionof the Engineer-in-Charge.
Dia.of piping arrangement :-
Inlet pipe = mm
Outlet pipe = mm
Scour pipe = mm
Reduced levels :-
Bench mark/Ground level = Metre
Inlet level = Metre
Outlet pipe = Metre
Scour pipe = Metre Total 297600.00
Detail of Measurement
NAME OF WORK :-
(S/H :- C/O OHSR 64000 Ltrs.capacity with 3.00 Metre Staging height.)
S.No. Description of item No's DIMENSIONS QUANTITY UNIT
LENGTH WIDTH H/D
1) Construction of RCC over head tank 64000 litres with 3.00 meters 1.00 64000.00 64000.00 Litres
staging height from ground level to bottom of dome slab comprising of inlet,
scour & over flow pipes as per deatails given below from G.L. to tank including
bends of required degrees,valves of reqd.size conforming to relevants codes
RCC Spiral 1.0 wide stair case/MS stair case i/c GMS pipe railing as per
IS specification,steel ladder 45cms.wide of usual height as per site requirement
irement ,SFRC manhole cover (Medium duty) of 560 mm dia.and weight of
frame and cover should not be less than 100 kg, ventilator at top dome with
minimum opening of 90x90 cms., water level indicator including floats and
measuring gauge, lightening conductor with earthing arrangement etc.
The RCC over head reservoir shall include randering/plastering of the uneven
expose surface, two coats of snowcem paint and any other component reqd.
for the completion of the job to the entire satisfaction of Engineer-in-charge.
The offers shall also include detail structural drawing / design calculations to
be approved by the competent authority based on the raft foundation by
taking seismic forces in the design calculation expension joints as required at
site.The offer shall also i/c the cost of providing and fixing of GMS/MS pipes,
and valve/fitting complete i/c duck foot bends,puddle collars,expansion joints
etc.connecting with rising main & distribution main with reqd. length from the
edge of foundationand any other components required for the completion of
job upto the entire satsfactionof the Engineer-in-Charge.
Dia.of piping arrangement :-
Inlet pipe = mm
Outlet pipe = mm
Scour pipe = mm
Reduced levels :-
Bench mark/Ground level = Metre
Inlet level = Metre
Outlet pipe = Metre
Scour pipe = Metre