Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

HP IPH DEPARTMENT

ECONOMICAL DIA STATEMENT(LWSS)

NAME OF WORK : PROVIDING LWSS TO NC/PC HABITATION OF CENSUS VIILAGE SOGAT , RUND BASSA DABIANA IN TEHSIL NURPUR DISTT. KANGRA(HP)
DATA : CALCULATIONS : PIPE RATES
Length of rising main = 2770 m Initial water requirement = 133560 lpd = 133.5600 klpd Dia Rate
RL of highest discharge point = 577.50 m Initial net water requirement Q1 = 133560 lpd = 133.5600 klpd 20 73.00
RL of pump shaft level = 170.50 m Intermidiate water requirement = 166320 lpd = 166.3200 klpd 25 112.80
LWL in sump well = 170.50 m Intermidiate net water requirement Q2 = 166320 lpd = 166.3200 klpd 32 145.10
Pumping hour at the end of 1st 15 years = 8 hrs. Ultimate water requirement = 199080 lpd = 199.0800 klpd 40 160.20
No.of working pump set providing = 1 Nos. Ultimate net water requirement Q3 = 199080 lpd = 199.0800 klpd 50 208.20 GI pipe
Construction period = 4 years Ist 15 years 2nd 15 years 65 256.30 Medium
Rate of population increase = 1.75 % Discharge at installation = 0.13356 mld 0.16632 mld 80 308.70 Class
Value of 'C' = 100 Discharge at the end of 15 years = 0.16632 mld 0.19908 mld 100 420.00
Cost of pumping unit/Kw = 6000 /- Average discharge during 15 years = 0.14994 mld 0.18270 mld 125 584.20
Energy charges/unit = 1 /- Avg. hours of pumping during 15 years = 7.21 hrs. 7.34 hrs 150 665.20
interest rate = 8.5 % Average annual energy charges = 2631.65 /- 2679.10 /- 200 1092.90 MSERW
Combined efficiency of P/machinary = 60 % Pumping rate = 498.960 klpd 597.240 klpd 250 1311.50 as per
Percentage of stand bye Pump sets = 100 % 300 1573.80 IS:1978
Life of pumping machinery = 15 years 350 1888.55
Life of rising main = 30 years 400 2266.25
Water available from Gravity source = 0 lpd 450 2719.50
Persons Student Hospital Hostel Hotels Pilgrim Employee Govt.Res. 500 3263.40
Water requirement per capita @ 70 40 340 135 180 25 10 70
Population as per Census of 2001 = 1564 -- -- -- -- -- -- --
Present population in 2009 = 1783 0 0 0 0 0 0 0
Initial Pop.after Const.period 2013 = 1908 0 0 0 0 0 0 0
Intermideate population after 15 yrs. 2028 = 2376 0 0 0 0 0 0 0
Ultimate population after 30 yrs. 2043 = 2844 0 0 0 0 0 0 0

S.No. Pipe Velocity Res. Static First stage of flow = 0.16632 mld 2nd stage of flow = 0.19908 mld Cost of pipes Total present Econ.
Size Ist 2nd head Head Friction Other Total KW req. Cost of Annual Capatalis- Total Friction Other Total KW req. Cost of Annual Capatalised Total capat. Cost/Rmt Total cost worth of all Dia of
stage stage head losss head i/c 100% pumps energy ed energy Capatalis- head losss head i/c 100% pumps energy energy cost of pump of 2770m investments R/main
flow flow loss standbye Charges charges ed cost loss standbye Charges charges & energy pipe length
(mm) (mps) (mps) (m) (m) (m) (m) (m) (KW) (Ths Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (m) (m) (m) (KW) (1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (Rs.) (1000 Rs.) (1000 Rs.) (mm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 65 1.74 2.083 3.0 407.00 253.00 25.30 688.30 131.79 790.74 173.41 1440.06 2230.80 352.95 35.30 798.24 182.95 1097.70 245.07 2035.13 921.49 256.30 709.95 3862.24 0
2 80 1.149 1.375 3.0 407.00 92.03 9.20 511.23 97.89 587.34 128.81 1069.64 1656.98 128.39 12.84 551.23 126.33 757.98 169.23 1405.28 636.30 308.70 855.10 3148.38 0
3 100 0.735 0.880 3.0 407.00 31.04 3.10 444.15 85.04 510.24 111.90 929.23 1439.47 43.30 4.33 457.63 104.88 629.28 140.49 1166.68 528.26 420.00 1163.40 3131.13 100
4 125 0.471 0.563 3.0 407.00 10.47 1.05 421.52 80.71 484.26 106.20 881.91 1366.17 14.61 1.46 426.07 97.65 585.90 130.81 1086.25 491.85 584.20 1618.23 3476.25 0

The Economical dia of pumping main is = 100 mm

DATA :-
1 Design pumping rate = 5.78 lps
2 Pumping hours = 8 hrs DESIGN OF PUMPING MACHINERY
3 Length of rising main = 2770 m Suction : Delevery: Rising Main:
4 No. of working pump sets required = 1 sets 1 Friction Losses in sucn.pipe = 0.023 m 1 Velocity in delevery pipe = 1.150 mps 1 Velocity in R.Main = 0.736 m/s
5 Dia of rising main = 100 mm 2 Velocity in Suction pipe = 0.471 m/s 2 Friction losses in delry. pipe = 0.000 m 2 Velocity head(V^2/2g) = 0.028 m
6 Static delevery lift (HD.Pt.-PSL) = 407.00 m 3 Velocity Head V^2/2g = 0.011 m 3 Velocity Head V2/2g = 0.067 m 3 Friction losses in R.Main = 31.041 m
7 Static sucn. Lift (PSL-LWL) = 0.00 m 4 Entrance Losses = 0.005 m 4 Losses due to sluice Valve = 0.034 m 4 Losses due to bends @ 5% = 1.552 m
8 Detail of system :- Suction Delevery 5 Losses due to sluice Valve = 0.006 m 5 Losses due to reflux valve = 0.034 m 5 Exit losses = 0.028 m
a) Dia of pipe = 125 mm 80 mm 6 Losses due to foot valve = 0.018 m 6 Losses due to Bend = 0.028 m 6 Rasidual head = 3.000 m
b) Length of pipe = 6 m 6 m 7 Losses due to Bend = 0.000 m 7 Losses due to expander = 0.000 m 7 Static head = 407.000 m
c) No. of L.R. bends = 0 Nos. 2 Nos. 8 Losses due to expender = 0.000 m Total losses = 0.096 m 8 Total delivery head = 442.621
d) Foot valve = 2 Nos. 0 Nos. 9 Static Suction lift = 0.000 m NPSHA Total head = 442.768 m
e) Sluce valve = 1 Nos. 1 Nos. Total suction lift = 0.052 m Losses in NPSH due to V. Pressure = 0.226 m Total BHP @ 60% eff.+ 15 % = 65.40 HP = 65.00 HP
f) Reflux valve = 0 Nos. 1 Nos. Losses in NPSH due to Atm. Press. = 0.540 m
g)Unequal T = 0 Nos. 1 Nos. Static suction lift = 0.00 m Say = 70.00 HP Provide 65.0 HP
I) Expender(increaser) = 0 Nos. 0 Nos. Total loss of NPSH = 0.766 m Use 1 working pump set of 65 HP as per manufactur-
10 Altitude of Pump house = 450 m.above MSL NPSHA = 9.254 m and provide 1 sets to act as stand bye ing range
11 Normal water temprature = 28 degree C Discharge 5.78 lps(each) T.Head 442.77 m

O/O Chief Engineer(CZ) Mandi.


DATA :
1 NAME OF WORK:- PROVIDING LWSS TO NC/PC HABITATION OF C### Life of rising main = 30 years
2 Length of rising main = 205 m ### Water not to be lifted = 0 lpd
3 RL of highest discharge point = 173.00 m PersonsPersonsHospital Hostel Hotels Floating Employee Govt.Res.
4 RL of pump shaft level = 162.00 m ### Water requirement per capita @ 70 ### 340 135 180 25 10 70
5 LWL in sump well = 160.00 m ### Population as per Census of 2001 = 1564 ### -- -- -- -- -- --
6 Pumping hour at the end of 1st 15 years = 8 hrs. ### Present population in 2009 = 1783 ### 0 0 0 0 0 0
7 No.of working pumps = 1 Nos. ### Altitude of Pump house = 450.00 m.above MSL
8 Construction period = 4 years ### Normal water temprature = 28 degree C
9 Rate of population increase = 1.75 % ### Detail of system :- Suction Delevery
10 Value of 'C' = 100 a) Length of pipe = 6 mtr ###
11 Cost of pumping unit/Kw = 6000 /- b) No. of L.R. bends = 0 No ###
12 Energy charges/unit = 1.00 /- c) Foot valve = 2 No ###
13 Interest rate = 8.5 % d) Sluice valve = 1 No ###
14 Combined efficiency of P/machinary = 60 % e) Reflux valve = 0 No ###
15 Percentage of stand bye Pump sets = 100 % f) Unequal T = 0 No ### E/Dia Of R/main 100 mm
16 Life of pumping machinery = 15 years g) Expander(enlarger) = 0 No ### Velocity 0.88
17 Residual head = 3.00 m ### Trial dia of Rising main 65
### 100 ### 150+ BHP 2 x 5 HP
18 Census year = 2001 year Head 18.91 m
19 Present Year = 2009 year Discharge 5.78 lps

NAME OF WORK : PROVIDING LWSS TO NC/PC HABITATION OF CENSUS VIILAGE SOGAT , RUND BASSA DABIANA IN TEHSIL NURPUR DISTT. KANGRA(HP)
DATA : CALCULATIONS : PIPE RATES
Length of rising main = 205 m Initial water requirement = 133560 lpd = 133.5600 klpd Dia Rate
RL of highest discharge point = 173.00 m Initial net water requirement Q1 = 133560 lpd = 133.5600 klpd 20 73.00
RL of pump shaft level = 162.00 m Intermidiate water requirement = 166320 lpd = 166.3200 klpd 25 112.80
LWL in sump well = 160.00 m Intermidiate net water requirement Q2 = 166320 lpd = 166.3200 klpd 32 145.10
Pumping hour at the end of 1st 15 years = 8 hrs. Ultimate water requirement = 199080 lpd = 199.0800 klpd 40 160.20
No.of working pump set providing = 1 Nos. Ultimate net water requirement Q3 = 199080 lpd = 199.0800 klpd 50 208.20 GI pipe
Construction period = 4 years Ist 15 years 2nd 15 years 65 256.30 Medium
Rate of population increase = 1.75 % Discharge at installation = 0.13356 mld 0.16632 mld 80 308.70 Class
Value of 'C' = 100 Discharge at the end of 15 years = 0.16632 mld 0.19908 mld 100 420.00
Cost of pumping unit/Kw = 6000 /- Average discharge during 15 years = 0.14994 mld 0.18270 mld 125 584.20
Energy charges/unit = 1 /- Avg. hours of pumping during 15 years = 7.21 hrs. 7.34 hrs 150 665.20
interest rate = 8.5 % Average annual energy charges = 2631.65 /- 2679.10 /- 200 1092.90 MSERW
Combined efficiency of P/machinary = 60 % Pumping rate = 498.960 klpd 597.240 klpd 250 1311.50 as per
Percentage of stand bye Pump sets = 100 % 300 1573.80 IS:1978
Life of pumping machinery = 15 years 350 1888.55
Life of rising main = 30 years 400 2266.25
Water available from Gravity source = 0 lpd 450 2719.50
Persons Studen Hospital Hostel Hotels Pilgrim Employe Govt.Res. 500 3263.40
Water requirement per capita @ 70 40 340 135 180 25 10 70
Population as per Census of 2001 = 1564 -- -- -- -- -- -- --
Present population in 2009 = 1783 0 0 0 0 0 0 0
Initial Pop.after Const.period 2013 = 1908 0 0 0 0 0 0 0
Intermideate population after 15 yrs. 2028 = 2376 0 0 0 0 0 0 0
Ultimate population after 30 yrs. 2043 = 2844 0 0 0 0 0 0 0

S.No. Pipe Velocity Res. Static First stage of flow = 0.16632 mld 2nd stage of flow = ###
mld Cost of pipes Total present Econ.
Size Ist 2nd head Head Friction Other Total KW req. Cost of Annual Capatalis Total Friction Other Total KW req. Cost of
Annual Capatalised Total capat. Cost/Rmt Total cost worth of all Dia of
stage stage head losss head i/c 100% pumps energy ed energyCapatali head losss head i/c 100% pumps energy energy cost of pump of 205m investments R/main
flow flow loss standbye Charges charges ed cost loss standbye Charges charges & energy pipe length
(mm) (mps) (mps) (m) (m) (m) (m) (m) (KW) (Ths Rs.) (1000 Rs.) (1000 Rs.(1000 Rs (m) (m) (m) (KW) (1000 (1000
Rs.) Rs.)(1000 Rs.) (1000 Rs.) (Rs.) (1000 Rs.) (1000 Rs.) (mm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ### 21 22 23 24 25 26
1 65 1.74 2.083 3.0 13.00 18.72 1.87 36.60 7.01 42.06 9.22 76.60 118.66 26.12 2.61 44.73 10.25 61.50### 114.02 51.63 256.30 52.54 222.83 0
2 80 1.149 1.375 3.0 13.00 6.81 0.68 23.49 4.50 27.00 5.92 49.17 76.17 9.50 0.95 26.45 6.06 36.36### 67.41 30.52 308.70 63.28 169.98 0
3 100 0.735 0.880 3.0 13.00 2.30 0.23 18.53 3.55 21.30 4.67 38.79 60.09 3.21 0.32 19.53 4.48 26.88### 49.83 22.57 420.00 86.10 168.75 100
4 125 0.471 0.563 3.0 13.00 0.78 0.08 16.85 3.23 19.38 4.25 35.29 54.67 1.08 0.11 17.19 3.94 23.64### 43.83 19.85 584.20 119.76 194.28 0

The Economical dia of pumping main is = 100 mm

DATA :-
1 Design pumping rate = 5.78
2 Pumping hours = 8 DESIGN OF PUMPING MACHINERY
3 Length of rising main = 205 Suction : Delevery: Rising Main:
4 No. of working pump sets required = 1 1 Friction Losses in sucn.pip= 0.199 m 1 Velocity in delevery pipe = 1.150 1 Velocity in R.Main = 0.736 m/s
5 Dia of rising main = 100 2 Velocity in Suction pipe = 1.150 m/s 2 Friction losses in delry. pipe = 0.000 2 Velocity head(V^2/2g) = 0.028 m
6 Static delevery lift (HD.Pt.-PSL) = 11.00 3 Velocity Head V^2/2g = 0.067 m 3 Velocity Head V2/2g = 0.067 3 Friction losses in R.Main = 2.297 m
7 Static sucn. Lift (PSL-LWL) = 2.00 4 Entrance Losses = 0.032 m 4 Losses due to sluice Valve = 0.034 4 Losses due to bends @ 5% = 0.115 m
8 Detail of system :- Suction Delevery 5 Losses due to sluice Valve= 0.034 m 5 Losses due to reflux valve = 0.034 5 Exit losses = 0.028 m
a) Dia of pipe = 80 mm 80 mm 6 Losses due to foot valve = 0.108 m 6 Losses due to Bend = 0.028 6 Rasidual head = 3.000 m
b) Length of pipe = 6 m 6 m 7 Losses due to Bend = 0.000 m 7 Losses due to expander = 0.000 7 Static head = 11.000 m
c) No. of L.R. bends = 0 Nos. 2 Nos. 8 Losses due to expender = 0.000 m Total losses = 0.096 8 Total delivery head = 16.440
d) Foot valve = 2 Nos. 0 Nos. 9 Static Suction lift = 2.000 m NPSHA Total head = 18.908 m
e) Sluce valve = 1 Nos. 1 Nos. Total suction lift = 2.373 m Losses in NPSH due to V. Pressure = #N/A Total BHP @ 60% eff.+ 10 % = 2.67 HP = 5.00 HP
f) Reflux valve = 0 Nos. 1 Nos. Losses in NPSH due to Atm. Press. = 0.540
g)Unequal T = 0 Nos. 1 Nos. Static suction lift = 2.00 Say = 5.00 HP Provide 5.0 HP
I) Expender(increaser) = 0 Nos. 0 Nos. Total loss of NPSH = #N/A Use 1 working pump set of 5 HP as per manufactur-
10 Altitude of Pump house = 450 NPSHA = #N/A and provide 1 sets to act as stand bye ing range
11 Normal water temprature = 28 Discharge 5.78 lps(each) T.Head 18.91 m

You might also like