Name of work:- C/o 8 Nos T/well in Gangath Constituency in Teh & Distt Kangra(H.P.)
`
1 Peak daily water requireme = 16.34 Lps
2 Maximum daily pump. Hours. 16 Hrs. Rates of ACC Pipes:-
3 Length of rising main = 60 Mtrs. Dia.
4 Length of Column assembly = 43 Mtrs.
5 Dia of col assembly. = 125 Mm Valueof C for C/A:-(M.S. 100
6 Highest point of discharge = 101.7 Mtrs.
7 R.L. of Pump House. = 57.50 Mtrs. Loss in C/A 2.36 125
8 Lowest water level 67.08 Mtrs.
9 Value of C"for Delivery Hea = 110 150
###Per Kwh energy charges = 3.1 Rs.
###Rate of p/ machinery per H = 4500 Rs. 200
###Total pumping hours per ye = 2230.83 Hrs.
###Peak daily design requirement 250
with 16 Hours Pumping. = 24.51 Lps
###Delivery Head = 34.62 Mtrs. 300
###Static suction lift = 0.00 Mtrs.
###P/ Efficiency = 60 %
###Intrest rate. = 8.5 %
1 2 3 4 5 6 7 8 9
1 125 60 46.07 2.76 0.28 2.00 34.62 0.00
S. Dia of Rising main in mm Annual Capitalis P/cost Capitalise I/Inv. For Pipe & G/Total
N Electric ed for Ist 15 d Pumps for joint cost of
o. Charges( E/charge Yrs.Rate E/charges next 15 cap.cost(
HP*0.73 s for Ist of for next 15 Yrs. Col.17+1
55*3.10* 15 Pumping Yrs. @0.2941 of 8+19+20
T/pumpi Yrs.@8. machiner @2.443 of col.18 +21)
ng Hours 3 of y * Col. col.16
of Year) col.16 15
1 2 16 17 18 19 20 21 22
1 125 119474 992140 105700 291828 31091 9600 1430358
23 24 25
0.00 0
0.00 0
DESIGN OF PUMPING MACHINERY:-
Design Discharge 24.51 Lps
Length of Rising Main 60 Mtrs
Economical dia of Rising Main 200 Mm
Delivery head 34.62 Mtrs
Length of Col. Assembly. 43.00 Mtrs
Dia of Col assembly 125.00 Mm
Losses in Col Assembly 2.36 Mtrs
Static suction head 0.00 Mtrs
Residual head 3.00 Mtrs
Frictional losses / 1000 4.67 Mtrs
Total losses 0.28 Mtrs
Other losses 0.03 Mtrs
Velocity 0.71 Mtrs
Enterance losses 0.01 Mtrs
Total head 40.30 Mtrs
B.H.P. required 21.95 B.H.P.
Say 25 H.P.
ECONOMICAL DIA STATEMENT
Name of work:- C/o 5 Nos T/well in Nurpur area Tehsil Nurpur Distt Kangra(H.P.) T/Well-DEHARI
`
1 Peak daily water requiremen = 16.34 Lps Rates of MSERW Pipes:-
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 60 Mtrs. Loss in C/A Dia. O/Dia. Pressure
4 Length of Column assembly. = 43 Mtrs. 2.36
5 Dia of col assembly. = 125 Mm
6 Highest point of discharge = 101.7 Mtrs.
7 R.L. of Pump . = 57.50 Mtrs. 100 168.3 4.40
8 Lowest water level 67.08 Mtrs.
9 Value of "C". = 100 125 219.1 2.93
10 Per Kwh energy charges = 3.1 Rs.
11 Rate of p/ machinery per HP = 4500 Rs. 150 273.1 2.15
12 Total pumping hours per year = 2230.83 Hrs.
13 Peak daily design requirement 200 323.9 1.38
with 16 Hours Pumping. = 24.51 Lps
14 Delivery Head = 34.62 Mtrs. 250 355.6 0.72
15 Static suction lift = 0.00 Mtrs.
16 P/ Efficiency = 60 %
17 Intrest rate. = 8.5 %
S.No. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction
metres Losses/ losses Losses Head lift
1000 @10%
1 2 3 4 5 6 7 8 9
1 100 60 162.94 9.78 0.98 3.12 34.62 0.00
1 2 16 17 18 19 20 21 22
1 100 141247 1172952 124963 345012 36757 36940 1716624
1
of MSERW Pipes:- 2
3
F.Stress Thickness
Total Thickness Thickness taken Wt./Rmt (Kg.)Rate/Rmt 4
5
6
7
128 3.41 5.25 3.60 14.62 615.66 8
9
128 2.95 4.74 4.00 21.21 893.41 10
11
128 2.69 4.46 4.80 31.74 1337.24 12
13
128 2.05 3.75 4.00 31.54 1328.69 14
15
128 1.17 2.79 4.80 41.51 1748.43 16
17
18
19
20
23 24 25
0.00 0
0.00 0
DESIGN OF PUMPING MACHINERY:-
Design Discharge 24.51 Lps
Length of Rising Main 60 Mtrs
Economical dia of Rising Main 200 mm
Delivery head 34.62 Mtrs
Length of Col. Assembly. 43.00 Mtrs
Dia of Col assembly 125.00 mm
Losses in Col Assembly 2.36 Mtrs
Static suction head 0.00 Mtrs
Residual head 3.00 Mtrs
Frictional losses / 1000 5.57 Mtrs
Total losses 0.33 Mtrs
Other losses 0.03 Mtrs
Velocity 0.78 Mtrs
Enterance losses 0.02 Mtrs
Surge pressure 249.20 Mtrs
Total head 40.37 Mtrs
Surge pressure 97.34 Mtrs
Total head I/c surge pressure 137.71 Mtrs
Wall thickness of MSERW. Pip 4 mm
B.H.P. required 21.99 B.H.P.
Say 60 H.P.
ECONOMICAL DIA STATEMENT
Name of work:- C/o 10 No. T/well in Chalwara Samker area { C/O T/well Sanourth) DESIGN OF PUMPING MACHINERY:-
` 1 Design Discharge 14.43Lps
1 Peak daily water requirement = 9.62 Lps Rates of MSERW Pipes:- 2 Length of Rising Main 615 Mtrs
2 Maximum daily pump. Hours. 16 Hrs. 3 Economical dia of Rising Main 200 mm
3 Length of rising main = 615 Mtrs. Loss in C/A Dia. O/Dia. Pressure F.Stress Thickness Total Thickness Thickness taken Wt./Rmt (Kg.) Rate/Rmt 4 Delivery head 103.50Mtrs
4 Length of Column assembly. = 78 Mtrs. 4.76 5 Length of Col. Assembly. 78.00Mtrs
5 Dia of col assembly. = 100 Mm 6 Dia of Col assembly 100.00mm
6 Highest point of discharge = 125.5 Mtrs. 7 Losses in Col Assembly 4.76Mtrs
7 R.L. of Pump . = 22.00 Mtrs. 125 141.3 2.19 128 1.42 3.06 3.60 12.22 514.74 8 Static suction head 0.00Mtrs
8 Lowest water level 22.00 Mtrs. 9 Residual head 3.00Mtrs
9 Value of "C". = 100 150 168.3 1.70 128 1.31 2.95 4.00 16.20 682.41 10 Frictional losses / 1000 2.09Mtrs
10 Per Kwh energy charges = 3.1 Rs. 11 Total losses 1.28Mtrs
11 Rate of p/ machinery per HP = 4500 Rs. 200 219.1 1.48 128 1.49 3.14 4.00 21.21 893.41 12 Other losses 0.13Mtrs
12 Total pumping hours per year = 3074 Hrs. 13 Velocity 0.46Mtrs
13 Peak daily design requirement 250 273.1 1.37 128 1.72 3.39 4.00 26.53 1117.69 14 Enterance losses 0.01Mtrs
with 16 Hours Pumping. = 14.43 Lps 15 Surge pressure 57.31Mtrs
14 Delivery Head = 103.50 Mtrs. 300 323.9 1.30 128 1.94 3.63 4.00 31.54 1328.69 16 Total head 112.68Mtrs
15 Static suction lift = 0.00 Mtrs. 17 Surge pressure 57.31Mtrs
16 P/ Efficiency = 60 % 18 Total head I/c surge pressure 169.99Mtrs
17 Intrest rate. = 8.5 % 19 Wall thickness of MSERW. Pipe 4mm
20 B.H.P. required 36.13B.H.P.
Say 40 H.P.
S. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction Entranc Residual Total Surge pressure Total BHP required
No metres Losses/ losses Losses Head lift e Head Head(5+6+8+ (125* Velocity) Head(12+1 @60% eff.
. 1000 @10% Losses 9+10+11)+Lo 3) Q*H/(75*0.60)
sses in C/A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 150 615 8.48 5.21 0.52 0.82 103.50 0.00 0.02 3.00 117.02 101.89 218.90 37.52
2 200 615 2.09 1.28 0.13 0.46 103.50 0.00 0.01 3.00 112.68 57.31 169.99 36.13
3 250 615 0.70 0.43 0.04 0.29 103.50 0.00 0.00 3.00 111.74 36.68 148.42 35.83
4 300 615 0.29 0.18 0.02 0.20 103.50 0.00 0.00 3.00 111.46 25.47 136.93 35.74
5 350 615 0.14 0.08 0.01 0.15 103.50 0.00 0.00 3.00 111.36 18.71 130.07 35.71
S. Dia of Rising main in mm Annual Capitalis P/cost Capitalise I/Inv. For Pipe & G/Total Designe Designed Remarks.
No Electric ed for Ist 15 d Pumps for next joint cost of d BHP Dia.
. Charges( E/charge Yrs.Rate E/charges 15 Yrs. cap.cost(
HP*0.73 s for Ist of for next @0.2941 of Col.17+1
55*3.10* 15 Pumping 15 Yrs. col.18 8+19+20
T/pumpi Yrs.@8. machiner @2.443 of +21)
ng Hours 3 of y * Col. col.16
of Year) col.16 15
1 2 16 17 18 19 20 21 22 23 24 25
1 150 262999 2184003 168857 642403 49667 316563 3361493 0.00 0
2 200 253257 2103104 162602 618607 47828 419683 3351822 36.13 200 Provide MSERW. Pipe of dia 200 mm(4.0 mm Thick)
3 250 251145 2085569 161246 613449 47429 549444 3457138 0.00 0 Capacity of Pumping Set. 36.13 H.P.
Hence provide 1 No. of P/set
4 300 250512 2080314 160840 611903 47309 687380 3587747 0.00 0 40 H.P.(each)
S. Dia of Rising main in mm Length in F/Losses/1000 Actual Others Velocity Delivery Suction lift Entrance Residual Total Surge pressure Total BHP required
No. metres losses Losses Head Losses Head Head(5+6+8 (125* Velocity) Head(12+1 @60% eff.
@10% +9+10+11) 3) Q*H/(75*0.60)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 150 60 28.23 1.69 0.17 1.56 126.50 0.00 0.06 3.00 131.43 195.09 326.51 80.70
2 200 60 6.95 0.42 0.04 0.88 126.50 0.00 0.02 3.00 129.98 109.74 239.71 79.81
3 250 60 2.35 0.14 0.01 0.56 126.50 0.00 0.01 3.00 129.66 70.23 199.89 79.61
4 300 60 0.97 0.06 0.01 0.39 126.50 0.00 0.00 3.00 129.57 48.77 178.34 79.55
5 350 60 0.46 0.03 0.00 0.29 126.50 0.00 0.00 3.00 129.53 35.83 165.36 79.53
S. Dia of Rising main in mm Annual Capitalised P/cost for Capitalise I/Inv. For Pipe & G/Total of Designed BHP Designed Dia. Remarks.
No. Electric E/charges for Ist 15 d Pumps for joint cost cap.cost(Col
Charges( Ist 15 Yrs.Rate E/charges next 15 .17+18+19+
HP*0.735 Yrs.@8.3 of of for next Yrs. 20+21)
5*3.10*T/ col.16 Pumping 15 Yrs. @0.2941
pumping machiner @2.443 of of col.18
Hours of y * Col. col.16
Year) 15
1 2 16 17 18 19 20 21 22 23 24 25
1 150 387514 3218011 363129 946545 106811 18641 4653136 0.00 0
2 200 383248 3182584 359131 936125 105635 21677 4605152 0.00 0 Provide MSERW. Pipe of di 250 mm(6.4 mm Thick)
3 250 382317 3174852 358258 933851 105378 28349 4600689 79.61 250 Capacity of Pumping Set. 79.61 H.P.
Hence provide 2 No. of P/set
4 300 382036 3172520 357995 933165 105301 35437 4604417 0.00 0 125 H.P.(each)
ECONOMICAL DIA STATEMENT
Name of work:- LIS Bharoli.
`
1 Peak daily water requirement = 6.89 Lps Rates of D.I.Pipes:-
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 620 Mtrs. S.No. Dia. Rate/Rmt
4 Highest point of discharge = 464.62 Mtrs.
5 R.L. of Pump . = 363.78 Mtrs. 1 150 900.58
6 Lowest water level 363.78 Mtrs.
7 Value of "C". = 140 2 200 1220.08
8 Per Kwh energy charges = 3.1 Rs.
9 Rate of p/ machinery per HP = 4500 Rs. 3 250 1612.63
### Total pumping hours per year = 2499.31 Hrs.
### Peak daily design requirement 4 300 2005.16
with 16 Hours Pumping. = 10.33 Lps
### Delivery Head = 100.84 Mtrs. 5 350 2530.43
### Static suction lift = 0.00 Mtrs.
### P/ Efficiency = 60 % 6 400 2930.07
### Intrest rate. = 8.5 %
S. Dia of Rising main in mm Annual Capitalise P/cost Capitalis I/Inv. For Pipe & G/Total of
N Electric d for Ist 15 ed Pumps joint cost cap.cost(
o. Charges( E/charge Yrs.Rate E/charge for next Col.17+1
HP*0.73 s for Ist of s for next 15 Yrs. 8+19+20
55*3.10* 15 Pumping 15 Yrs. @0.2941 +21)
T/pumpi Yrs.@8.3 machiner @2.443 of col.18
ng Hours of col.16 y * Col. of col.16
of Year) 15
1 2 16 17 18 19 20 21 22
1 150 138096 1146779 109051 337313 32076 558362 2183581
2 200 136443 1133055 107746 333277 31692 756450 2362220
S. Dia of Rising main in mm Annual Capitalise P/cost Capitalis I/Inv. For Pipe & G/Total of
N Electric d for Ist 15 ed Pumps joint cost cap.cost(
o. Charges( E/charge Yrs.Rate E/charge for next Col.17+1
HP*0.73 s for Ist of s for next 15 Yrs. 8+19+20
55*3.10* 15 Pumping 15 Yrs. @0.2941 +21)
T/pumpi Yrs.@8.3 machiner @2.443 of col.18
ng Hours of col.16 y * Col. of col.16
of Year) 15
1 2 16 17 18 19 20 21 22
1 250 1937135 ### 1780401 4731659 523687 2017140 ###
23 24 25
24.23 150
0.00 0 Provide D.I. Pipe of dia. 150 mm
0.00 0
0.00 0
IA STATEMENT
Rates of Pipes.
Designed BHP
Designed Dia. Remarks.
23 24 25
0.00 0
0.00 0
Rates
900.58
1220.08
1612.63
2005.16
2530.43
2930.07
3491.74
3910.50
DESIGN OF PUMPING MACHINERY:- Steel Grade:- 320
1 Design Discharge 129.90 Lps
2 Length of Rising Main 900 Mtrs
3 Economical dia of Rising Main 400 Mm
4 Delivery head 132.23 Mtrs
5 Static suction head 0.00 Mtrs
6 Residual head 3.00 Mtrs
7 Frictional losses / 1000 0.04 Mtrs
8 Total losses 0.03 Mtrs
9 Other losses 0.00 Mtrs
10 Velocity 0.08 Mtrs
11 Enterance losses 0.00 Mtrs
12 Surge pressure 229.29 Mtrs
13 Total head 135.27 Mtrs
14 Surge pressure 10.26 Mtrs
14 Total head I/c surge pressure 145.53 Mtrs
15 Wall thickness of MSERW. P 7.9mm
16 B.H.P. required 390.47 B.H.P.
or say 450 H.P.