ECONOMICAL DIA STATEMENT

Name of work:- C/o 8 Nos T/well in Gangath Constituency in Teh & Distt Kangra(H.P.)
`
1 Peak daily water requireme = 16.34 Lps
2 Maximum daily pump. Hours. 16 Hrs. Rates of ACC Pipes:-
3 Length of rising main = 60 Mtrs. Dia.
4 Length of Column assembly = 43 Mtrs.
5 Dia of col assembly. = 125 Mm Valueof C for C/A:-(M.S. 100
6 Highest point of discharge = 101.7 Mtrs.
7 R.L. of Pump House. = 57.50 Mtrs. Loss in C/A 2.36 125
8 Lowest water level 67.08 Mtrs.
9 Value of C"for Delivery Hea = 110 150
###Per Kwh energy charges = 3.1 Rs.
###Rate of p/ machinery per H = 4500 Rs. 200
###Total pumping hours per ye = 2230.83 Hrs.
###Peak daily design requirement 250
with 16 Hours Pumping. = 24.51 Lps
###Delivery Head = 34.62 Mtrs. 300
###Static suction lift = 0.00 Mtrs.
###P/ Efficiency = 60 %
###Intrest rate. = 8.5 %

S. Dia of Rising main in mm Length in F/ Actual Others Velocity in Delivery Suction


N metres Losses/ losses Losses C/Assembl Head lift
o. 1000 @10% y

1 2 3 4 5 6 7 8 9
1 125 60 46.07 2.76 0.28 2.00 34.62 0.00

2 150 60 18.96 1.14 0.11 1.39 34.62 0.00

3 200 60 4.67 0.28 0.03 0.78 34.62 0.00

4 250 60 1.57 0.09 0.01 0.50 34.62 0.00

5 300 60 0.65 0.04 0.00 0.35 34.62 0.00

S. Dia of Rising main in mm Annual Capitalis P/cost Capitalise I/Inv. For Pipe & G/Total
N Electric ed for Ist 15 d Pumps for joint cost of
o. Charges( E/charge Yrs.Rate E/charges next 15 cap.cost(
HP*0.73 s for Ist of for next 15 Yrs. Col.17+1
55*3.10* 15 Pumping Yrs. @0.2941 of 8+19+20
T/pumpi Yrs.@8. machiner @2.443 of col.18 +21)
ng Hours 3 of y * Col. col.16
of Year) col.16 15

1 2 16 17 18 19 20 21 22
1 125 119474 992140 105700 291828 31091 9600 1430358

2 150 114371 949765 101185 279364 29763 23520 1383597

3 200 111666 927301 98792 272756 29059 41760 1369669

4 250 111075 922393 98269 271312 28905 59760 1380639

5 300 110896 920910 98111 270876 28858 82620 1401376


1
2
Rates of ACC Pipes:- 3
Rate /Rmt 4
5
6
5
160 6
7
392 8
9
696 10
11
996 12
13
1377 14

Entrance Residual Total Total Head Surge Total BHP required


Losses Head Head(5+6+8 forACC pipe pressure Head(12a @60% eff.
+9+10+11)+ (12-9) (125* +13) Q*H/(75*0.60)
Losses in Velocity)
10 11 C/A 12 12a 13 14 15
0.10 3.00 43.13 43.13 249.56 292.68 23.49

0.05 3.00 41.28 41.28 173.30 214.59 22.49

0.02 3.00 40.31 40.31 97.48 137.79 21.95

0.01 3.00 40.09 40.09 62.39 102.48 21.84

0.00 3.00 40.03 40.03 43.33 83.35 21.80

Designe Designe Remarks.


d BHP d Dia.

23 24 25
0.00 0

0.00 0 Provide MSERW 4mm th 200 mm

21.95 200 Capacity of Pumping Set. 21.95 H.P.


Hence provide 1 No. of P/set
0.00 0 25 H.P.(each)

0.00 0
DESIGN OF PUMPING MACHINERY:-
Design Discharge 24.51 Lps
Length of Rising Main 60 Mtrs
Economical dia of Rising Main 200 Mm
Delivery head 34.62 Mtrs
Length of Col. Assembly. 43.00 Mtrs
Dia of Col assembly 125.00 Mm
Losses in Col Assembly 2.36 Mtrs
Static suction head 0.00 Mtrs
Residual head 3.00 Mtrs
Frictional losses / 1000 4.67 Mtrs
Total losses 0.28 Mtrs
Other losses 0.03 Mtrs
Velocity 0.71 Mtrs
Enterance losses 0.01 Mtrs
Total head 40.30 Mtrs
B.H.P. required 21.95 B.H.P.
Say 25 H.P.
ECONOMICAL DIA STATEMENT
Name of work:- C/o 5 Nos T/well in Nurpur area Tehsil Nurpur Distt Kangra(H.P.) T/Well-DEHARI
`
1 Peak daily water requiremen = 16.34 Lps Rates of MSERW Pipes:-
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 60 Mtrs. Loss in C/A Dia. O/Dia. Pressure
4 Length of Column assembly. = 43 Mtrs. 2.36
5 Dia of col assembly. = 125 Mm
6 Highest point of discharge = 101.7 Mtrs.
7 R.L. of Pump . = 57.50 Mtrs. 100 168.3 4.40
8 Lowest water level 67.08 Mtrs.
9 Value of "C". = 100 125 219.1 2.93
10 Per Kwh energy charges = 3.1 Rs.
11 Rate of p/ machinery per HP = 4500 Rs. 150 273.1 2.15
12 Total pumping hours per year = 2230.83 Hrs.
13 Peak daily design requirement 200 323.9 1.38
with 16 Hours Pumping. = 24.51 Lps
14 Delivery Head = 34.62 Mtrs. 250 355.6 0.72
15 Static suction lift = 0.00 Mtrs.
16 P/ Efficiency = 60 %
17 Intrest rate. = 8.5 %

S.No. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction
metres Losses/ losses Losses Head lift
1000 @10%

1 2 3 4 5 6 7 8 9
1 100 60 162.94 9.78 0.98 3.12 34.62 0.00

2 125 60 54.96 3.30 0.33 1.99 34.62 0.00

3 150 60 22.62 1.36 0.14 1.38 34.62 0.00

4 200 60 5.57 0.33 0.03 0.78 34.62 0.00

5 350 60 0.36 0.02 0.00 0.25 34.62 0.00


S.No. Dia of Rising main in mm Annual Capitalis P/cost Capitalised I/Inv. For Pipe & G/Total
Electric ed for Ist 15 E/charges Pumps joint cost of
Charges( E/charge Yrs.Rate for next 15 for next cap.cost(
HP*0.73 s for Ist of Yrs. 15 Yrs. Col.17+1
55*3.10* 15 Pumping @2.443 of @0.2941 8+19+20
T/pumpi Yrs.@8. machiner col.16 of col.18 +21)
ng Hours 3 of y * Col.
of Year) col.16 15

1 2 16 17 18 19 20 21 22
1 100 141247 1172952 124963 345012 36757 36940 1716624

2 125 121099 1005635 107138 295797 31513 53604 1493688

3 150 115040 955318 101777 280997 29937 80235 1448263

4 200 111831 928669 98938 273159 29102 79721 1409588

5 350 110841 920447 98062 270740 28844 104906 1422999


STATEMENT

1
of MSERW Pipes:- 2
3
F.Stress Thickness
Total Thickness Thickness taken Wt./Rmt (Kg.)Rate/Rmt 4
5
6
7
128 3.41 5.25 3.60 14.62 615.66 8
9
128 2.95 4.74 4.00 21.21 893.41 10
11
128 2.69 4.46 4.80 31.74 1337.24 12
13
128 2.05 3.75 4.00 31.54 1328.69 14
15
128 1.17 2.79 4.80 41.51 1748.43 16
17
18
19
20

Entrance Residual Total Surge pressure (125* Total BHP


Losses Head Head(5+ Velocity) Head(12 required
6+8+9+1 +13) @60%
0+11)+L eff.
osses in Q*H/(75*
C/A 0.60)
10 11 12 13 14 15
0.25 3.00 50.98 389.38 440.36 27.77

0.10 3.00 43.71 249.20 292.91 23.81

0.05 3.00 41.52 173.06 214.58 22.62

0.02 3.00 40.37 97.34 137.71 21.99

0.00 3.00 40.01 31.79 71.79 21.79


Designe Designe Remarks.
d BHP d Dia.

23 24 25
0.00 0

0.00 0 Provide MSERW. Pipe of di 200 mm(4.0 mm Thick)

0.00 0 Capacity of Pumping Set. 21.99 H.P.


Hence provide 1 No. of P/set
21.99 200 35 H.P.(each)

0.00 0
DESIGN OF PUMPING MACHINERY:-
Design Discharge 24.51 Lps
Length of Rising Main 60 Mtrs
Economical dia of Rising Main 200 mm
Delivery head 34.62 Mtrs
Length of Col. Assembly. 43.00 Mtrs
Dia of Col assembly 125.00 mm
Losses in Col Assembly 2.36 Mtrs
Static suction head 0.00 Mtrs
Residual head 3.00 Mtrs
Frictional losses / 1000 5.57 Mtrs
Total losses 0.33 Mtrs
Other losses 0.03 Mtrs
Velocity 0.78 Mtrs
Enterance losses 0.02 Mtrs
Surge pressure 249.20 Mtrs
Total head 40.37 Mtrs
Surge pressure 97.34 Mtrs
Total head I/c surge pressure 137.71 Mtrs
Wall thickness of MSERW. Pip 4 mm
B.H.P. required 21.99 B.H.P.
Say 60 H.P.
ECONOMICAL DIA STATEMENT
Name of work:- C/o 10 No. T/well in Chalwara Samker area { C/O T/well Sanourth) DESIGN OF PUMPING MACHINERY:-
` 1 Design Discharge 14.43Lps
1 Peak daily water requirement = 9.62 Lps Rates of MSERW Pipes:- 2 Length of Rising Main 615 Mtrs
2 Maximum daily pump. Hours. 16 Hrs. 3 Economical dia of Rising Main 200 mm
3 Length of rising main = 615 Mtrs. Loss in C/A Dia. O/Dia. Pressure F.Stress Thickness Total Thickness Thickness taken Wt./Rmt (Kg.) Rate/Rmt 4 Delivery head 103.50Mtrs
4 Length of Column assembly. = 78 Mtrs. 4.76 5 Length of Col. Assembly. 78.00Mtrs
5 Dia of col assembly. = 100 Mm 6 Dia of Col assembly 100.00mm
6 Highest point of discharge = 125.5 Mtrs. 7 Losses in Col Assembly 4.76Mtrs
7 R.L. of Pump . = 22.00 Mtrs. 125 141.3 2.19 128 1.42 3.06 3.60 12.22 514.74 8 Static suction head 0.00Mtrs
8 Lowest water level 22.00 Mtrs. 9 Residual head 3.00Mtrs
9 Value of "C". = 100 150 168.3 1.70 128 1.31 2.95 4.00 16.20 682.41 10 Frictional losses / 1000 2.09Mtrs
10 Per Kwh energy charges = 3.1 Rs. 11 Total losses 1.28Mtrs
11 Rate of p/ machinery per HP = 4500 Rs. 200 219.1 1.48 128 1.49 3.14 4.00 21.21 893.41 12 Other losses 0.13Mtrs
12 Total pumping hours per year = 3074 Hrs. 13 Velocity 0.46Mtrs
13 Peak daily design requirement 250 273.1 1.37 128 1.72 3.39 4.00 26.53 1117.69 14 Enterance losses 0.01Mtrs
with 16 Hours Pumping. = 14.43 Lps 15 Surge pressure 57.31Mtrs
14 Delivery Head = 103.50 Mtrs. 300 323.9 1.30 128 1.94 3.63 4.00 31.54 1328.69 16 Total head 112.68Mtrs
15 Static suction lift = 0.00 Mtrs. 17 Surge pressure 57.31Mtrs
16 P/ Efficiency = 60 % 18 Total head I/c surge pressure 169.99Mtrs
17 Intrest rate. = 8.5 % 19 Wall thickness of MSERW. Pipe 4mm
20 B.H.P. required 36.13B.H.P.
Say 40 H.P.

S. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction Entranc Residual Total Surge pressure Total BHP required
No metres Losses/ losses Losses Head lift e Head Head(5+6+8+ (125* Velocity) Head(12+1 @60% eff.
. 1000 @10% Losses 9+10+11)+Lo 3) Q*H/(75*0.60)
sses in C/A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 150 615 8.48 5.21 0.52 0.82 103.50 0.00 0.02 3.00 117.02 101.89 218.90 37.52

2 200 615 2.09 1.28 0.13 0.46 103.50 0.00 0.01 3.00 112.68 57.31 169.99 36.13

3 250 615 0.70 0.43 0.04 0.29 103.50 0.00 0.00 3.00 111.74 36.68 148.42 35.83

4 300 615 0.29 0.18 0.02 0.20 103.50 0.00 0.00 3.00 111.46 25.47 136.93 35.74

5 350 615 0.14 0.08 0.01 0.15 103.50 0.00 0.00 3.00 111.36 18.71 130.07 35.71

S. Dia of Rising main in mm Annual Capitalis P/cost Capitalise I/Inv. For Pipe & G/Total Designe Designed Remarks.
No Electric ed for Ist 15 d Pumps for next joint cost of d BHP Dia.
. Charges( E/charge Yrs.Rate E/charges 15 Yrs. cap.cost(
HP*0.73 s for Ist of for next @0.2941 of Col.17+1
55*3.10* 15 Pumping 15 Yrs. col.18 8+19+20
T/pumpi Yrs.@8. machiner @2.443 of +21)
ng Hours 3 of y * Col. col.16
of Year) col.16 15

1 2 16 17 18 19 20 21 22 23 24 25
1 150 262999 2184003 168857 642403 49667 316563 3361493 0.00 0

2 200 253257 2103104 162602 618607 47828 419683 3351822 36.13 200 Provide MSERW. Pipe of dia 200 mm(4.0 mm Thick)

3 250 251145 2085569 161246 613449 47429 549444 3457138 0.00 0 Capacity of Pumping Set. 36.13 H.P.
Hence provide 1 No. of P/set
4 300 250512 2080314 160840 611903 47309 687380 3587747 0.00 0 40 H.P.(each)

5 350 250279 2078372 160690 611332 47265 817142 3714802 0.00 0


ECONOMICAL DIA STATEMENT
Name of work:- Imp. Of LIS Bharoli in Teh Dehra Distt.KANGRA (H.P.)
`
1 Peak daily water requiremen = 18.42 Lps Rates of MSERW Pipes:-
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 60 Mtrs. S.No. Dia. O/Dia. Pressure F.Stress Thickness Total Thickness Thickness taken Wt./Rmt (Kg.) Rate/Rmt
4 Highest point of discharge = 126.5 Mtrs.
5 R.L. of Pump . = 44.00 Mtrs. 1 150 168.3 3.27 128 2.53 4.28 4.00 16.21 310.68
6 Lowest water level 44.00 Mtrs.
7 Value of "C". = 100 2 200 219.1 2.40 128 2.41 4.16 4.00 21.22 361.28
8 Per Kwh energy charges = 3.1 Rs.
9 Rate of p/ machinery per HP = 4500 Rs. 3 250 273.1 2.00 128 2.51 4.26 4.00 26.54 472.49
10 Total pumping hours per year = 2106.18 Hrs.
11 Peak daily design requirement 4 300 323.9 1.78 128 2.65 4.42 4.40 34.67 590.61
with 16 Hours Pumping. = 27.63 Lps
12 Delivery Head = 126.50 Mtrs. 5 350 355.6 1.65 128 2.70 4.47 4.80 41.52 610.90
13 Static suction lift = 0.00 Mtrs.
14 P/ Efficiency = 60 %
15 Intrest rate. = 8.5 %

S. Dia of Rising main in mm Length in F/Losses/1000 Actual Others Velocity Delivery Suction lift Entrance Residual Total Surge pressure Total BHP required
No. metres losses Losses Head Losses Head Head(5+6+8 (125* Velocity) Head(12+1 @60% eff.
@10% +9+10+11) 3) Q*H/(75*0.60)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 150 60 28.23 1.69 0.17 1.56 126.50 0.00 0.06 3.00 131.43 195.09 326.51 80.70

2 200 60 6.95 0.42 0.04 0.88 126.50 0.00 0.02 3.00 129.98 109.74 239.71 79.81

3 250 60 2.35 0.14 0.01 0.56 126.50 0.00 0.01 3.00 129.66 70.23 199.89 79.61

4 300 60 0.97 0.06 0.01 0.39 126.50 0.00 0.00 3.00 129.57 48.77 178.34 79.55

5 350 60 0.46 0.03 0.00 0.29 126.50 0.00 0.00 3.00 129.53 35.83 165.36 79.53

S. Dia of Rising main in mm Annual Capitalised P/cost for Capitalise I/Inv. For Pipe & G/Total of Designed BHP Designed Dia. Remarks.
No. Electric E/charges for Ist 15 d Pumps for joint cost cap.cost(Col
Charges( Ist 15 Yrs.Rate E/charges next 15 .17+18+19+
HP*0.735 Yrs.@8.3 of of for next Yrs. 20+21)
5*3.10*T/ col.16 Pumping 15 Yrs. @0.2941
pumping machiner @2.443 of of col.18
Hours of y * Col. col.16
Year) 15

1 2 16 17 18 19 20 21 22 23 24 25
1 150 387514 3218011 363129 946545 106811 18641 4653136 0.00 0

2 200 383248 3182584 359131 936125 105635 21677 4605152 0.00 0 Provide MSERW. Pipe of di 250 mm(6.4 mm Thick)

3 250 382317 3174852 358258 933851 105378 28349 4600689 79.61 250 Capacity of Pumping Set. 79.61 H.P.
Hence provide 2 No. of P/set
4 300 382036 3172520 357995 933165 105301 35437 4604417 0.00 0 125 H.P.(each)
ECONOMICAL DIA STATEMENT
Name of work:- LIS Bharoli.
`
1 Peak daily water requirement = 6.89 Lps Rates of D.I.Pipes:-
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 620 Mtrs. S.No. Dia. Rate/Rmt
4 Highest point of discharge = 464.62 Mtrs.
5 R.L. of Pump . = 363.78 Mtrs. 1 150 900.58
6 Lowest water level 363.78 Mtrs.
7 Value of "C". = 140 2 200 1220.08
8 Per Kwh energy charges = 3.1 Rs.
9 Rate of p/ machinery per HP = 4500 Rs. 3 250 1612.63
### Total pumping hours per year = 2499.31 Hrs.
### Peak daily design requirement 4 300 2005.16
with 16 Hours Pumping. = 10.33 Lps
### Delivery Head = 100.84 Mtrs. 5 350 2530.43
### Static suction lift = 0.00 Mtrs.
### P/ Efficiency = 60 % 6 400 2930.07
### Intrest rate. = 8.5 %

S. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction


N metres Losses/ losses Losses Head lift
o. 1000 @10%
1 2 3 4 5 6 7 8 9
1 150 620 2.45 1.52 0.15 0.42 100.84 0.00

2 200 620 0.60 0.37 0.04 0.23 100.84 0.00

3 250 620 0.20 0.13 0.01 0.15 100.84 0.00

4 300 620 0.08 0.05 0.01 0.10 100.84 0.00

5 350 620 0.04 0.02 0.00 0.08 100.84 0.00

6 400 620 0.02 0.01 0.00 0.06 100.84 0.00

S. Dia of Rising main in mm Annual Capitalise P/cost Capitalis I/Inv. For Pipe & G/Total of
N Electric d for Ist 15 ed Pumps joint cost cap.cost(
o. Charges( E/charge Yrs.Rate E/charge for next Col.17+1
HP*0.73 s for Ist of s for next 15 Yrs. 8+19+20
55*3.10* 15 Pumping 15 Yrs. @0.2941 +21)
T/pumpi Yrs.@8.3 machiner @2.443 of col.18
ng Hours of col.16 y * Col. of col.16
of Year) 15

1 2 16 17 18 19 20 21 22
1 150 138096 1146779 109051 337313 32076 558362 2183581
2 200 136443 1133055 107746 333277 31692 756450 2362220

3 250 136085 1130081 107463 332402 31609 999828 2601383

4 300 135978 1129190 107378 332140 31584 1243199 2843490

5 350 135938 1128860 107347 332043 31575 1568864 3168689

6 400 135921 1128720 107333 332001 31571 1816641 3416266

8.30 2.443 0.2941

ECONOMICAL DIA STATEMENT


Name of work:- C/o LIS Bantungli in Distt.KANGRA (H.P.) Stage IInd.
`
1 Peak daily water requirement = 86.60 Lps
2 Maximum daily pump. Hours. 16 Hrs.
3 Length of rising main = 900 Mtrs. S.No. Dia. O/Dia. Pressure
4 Highest point of discharge = 1151.23 Mtrs.
5 R.L. of Pump . = 1019 Mtrs. 1 250 273.1 5.06
6 Lowest water level 1019.00 Mtrs.
7 Value of "C". = 100 2 300 323.9 3.81
8 Per Kwh energy charges = 2.45 Rs.
9 Rate of p/ machinery per HP = 3500 Rs. 3 350 355.6 3.12
### Total pumping hours per year = 2113.3 Hrs.
### Peak daily design requirement 4 400 406.4 2.68
with 16 Hours Pumping. = 129.90 Lps
### Delivery Head = 132.23 Mtrs. 5 450 457 2.39
### Static suction lift = 0.00 Mtrs.
### P/ Efficiency = 60 %
### Intrest rate. = 8.5 %

S. Dia of Rising main in mm Length in F/ Actual Others Velocity Delivery Suction


N metres Losses/ losses Losses Head lift
o. 1000 @10%
1 2 3 4 5 6 7 8 9
1 250 900 41.22 37.10 3.71 2.64 132.23 0.00

2 300 900 16.96 15.27 1.53 1.83 132.23 0.00


3 350 900 8.01 7.21 0.72 1.35 132.23 0.00

4 400 900 4.18 3.76 0.38 1.03 132.23 0.00

5 450 900 2.35 2.12 0.21 0.82 132.23 0.00

S. Dia of Rising main in mm Annual Capitalise P/cost Capitalis I/Inv. For Pipe & G/Total of
N Electric d for Ist 15 ed Pumps joint cost cap.cost(
o. Charges( E/charge Yrs.Rate E/charge for next Col.17+1
HP*0.73 s for Ist of s for next 15 Yrs. 8+19+20
55*3.10* 15 Pumping 15 Yrs. @0.2941 +21)
T/pumpi Yrs.@8.3 machiner @2.443 of col.18
ng Hours of col.16 y * Col. of col.16
of Year) 15

1 2 16 17 18 19 20 21 22
1 250 1937135 ### 1780401 4731659 523687 2017140 ###

2 300 1672099 ### 1536810 4084281 452037 2052544 ###

3 350 1574194 ### 1446826 3845137 425569 2034414 ###

4 400 1532321 ### 1408341 3742858 414249 2330966 ###

5 450 1512359 ### 1389994 3694098 408853 2626350 ###


TATEMENT
DESIGN OF PUMPING MACHINERY:- Rates:-
1 Design Discharge 10.33 Lps Dia
2 Length of Rising Main 620 Mtrs 150
3 Economical dia of Rising Main 150 Mm 200
4 Delivery head 100.84 Mtrs 250
5 Static suction head 0.00 Mtrs 300
6 Residual head 3.00 Mtrs 350
7 Frictional losses / 1000 2.45 Mtrs 400
8 Total losses 1.52 Mtrs 450
9 Other losses 0.15 Mtrs 500
10 Velocity 0.42 Mtrs
11 Enterance losses 0.00 Mtrs
12 Surge pressure 52.12 Mtrs
13 Total head 105.52 Mtrs
14 Total head I/c surge pressure 157.64 Mtrs
15 B.H.P. required 24.23 B.H.P.
or say 260 H.P.

Entrance Residual Total Surge pressure (125* Total BHP required


Losses Head Head(5+6+8+ Velocity) Head(12+1 @60% eff.
9+10+11) 3) Q*H/(75*0.60)
10 11 12 13 14 15
0.00 3.00 105.52 52.12 157.64 24.23

0.00 3.00 104.25 29.32 133.57 23.94

0.00 3.00 103.98 18.76 122.74 23.88

0.00 3.00 103.90 13.03 116.93 23.86

0.00 3.00 103.87 9.57 113.44 23.85

0.00 3.00 103.85 7.33 111.18 23.85

Designe Designed Dia. Remarks.


d BHP

23 24 25
24.23 150
0.00 0 Provide D.I. Pipe of dia. 150 mm

0.00 0 Capacity of Pumping Set. 24.23 H.P.


Hence provide 2 No. of P/set
0.00 0 130 H.P.(each)

0.00 0

0.00 0

IA STATEMENT

Rates of Pipes.

F.Stress Thickness Total Thickness Thickness taken Wt./Rmt (Kg.) Rate/Rmt

128 6.36 8.49 9.30 60.47 2241.27

128 5.68 7.74 7.90 61.53 2280.60

128 5.09 7.10 7.10 60.99 2260.46

128 5.01 7.01 7.10 69.88 2589.96

128 5.03 7.03 7.10 78.74 2918.17

Entrance Residual Total Surge pressure (125* Total BHP required


Losses Head Head(5+6+8+ Velocity) Head(12+1 @60% eff.
9+10+11) 3) Q*H/(75*0.60)
10 11 12 13 14 15
0.18 3.00 176.22 330.18 506.40 508.69 say

0.09 3.00 152.11 229.29 381.40 439.09 say


0.05 3.00 143.20 168.46 311.66 413.38 say

0.03 3.00 139.39 128.98 268.37 402.38 say

0.02 3.00 137.58 101.91 239.49 397.14 say

Designed BHP
Designed Dia. Remarks.

23 24 25
0.00 0

0.00 0 Provide MSERW. Pipe of dia. 400 mm

0.00 0 Capacity of Pumping Set. 402.38 H.P.


Hence provide 3 No. of P/set
402.38 400 150 H.P.(each)

0.00 0
Rates
900.58
1220.08
1612.63
2005.16
2530.43
2930.07
3491.74
3910.50
DESIGN OF PUMPING MACHINERY:- Steel Grade:- 320
1 Design Discharge 129.90 Lps
2 Length of Rising Main 900 Mtrs
3 Economical dia of Rising Main 400 Mm
4 Delivery head 132.23 Mtrs
5 Static suction head 0.00 Mtrs
6 Residual head 3.00 Mtrs
7 Frictional losses / 1000 0.04 Mtrs
8 Total losses 0.03 Mtrs
9 Other losses 0.00 Mtrs
10 Velocity 0.08 Mtrs
11 Enterance losses 0.00 Mtrs
12 Surge pressure 229.29 Mtrs
13 Total head 135.27 Mtrs
14 Surge pressure 10.26 Mtrs
14 Total head I/c surge pressure 145.53 Mtrs
15 Wall thickness of MSERW. P 7.9mm
16 B.H.P. required 390.47 B.H.P.
or say 450 H.P.

You might also like