*1 Peak Daily Water Requirement for 24 hrs. 8.92 LPS 1 Peak Daily Water Requirement 8.92 LPS 13 Losses in Column pipe:-
*2 Maximum Daily Pumping Hours 16.00 HRS. 2 Maximum Daily Pumping Hours 16.00 HRS. a)Losses in Column Pipe 1.75 MTS.
*3 Length of Rising Main 265 MTS. 3 Peak Daily Design Water Requirement 13.38 LPS b)Losses in Reflux Valve,Sluice Valve,
*4 Highest Point of Discharge 152.60 MTS. 4 Length of Rising Main 265 MTS. Bend & Exit (2.3+0.2+2.2+1.0)v^2/2G 0.17 MTS.
*5 Reduced Level of Desilting Tank outlet 148.00 MTS. 5 Economical Dia. Of Rising Main 150.00 MM 14 Frictional Losses in Rising Main Including
6 Centre Line Level of Pump/P.W.L. 50.06 MTS. 6 Frictional Losses Per 1000 mts. 7.37 MTS. 10% for Bends & Specials 2.15 MTS.
*7 Value of "C" 100.00 7 Delivery Head 102.54 MTS. 15 Total Head 109.61 MTS.
*8 Rate of Electric Charges Per Unit in Rs. 3.10 Rs. *8 Residual Head 3.00 MTS. 16 B.H.P. OF PUMP I/C 15% OVERLOADING 37.48 H.P.
*9 Rate of Pumping Machinery in Per H.P. in Rs. 4500.00 Rs. *9 Dia of Column Pipe 125.00 MM 17 Say B.H.P. 40.00 H.P.
*10 Exact Hours Of Pumping In a Year 3387.10 HRS. *10 Length of Column Pipe 97.94 MTS. *18 Hence Provide 1 Set of 40 H.P. Each
11 Peak Daily Design Water Requirement 13.38 LPS 11 Frictional Losses Per 1000 mts. In Column pipe 17.91 MTS.
DIA OF LENGTH STATIC DISCHARGE LOSSES TOTAL NORMAL MAXIMUM VELOCITY WATER FIELD TEST PRESSURE
PIPE OF PIPE HEAD PER 1000 LOSSES VELOCITY OPERATING OF HAMMER SHALL BE GREATEST
I/C 10% PRESSURE PRESSURE EFFECT 1.5xCOL.3 1.5xCOL.8
FOR BENDS WAVE
(MM) (MTS.) (MTS.) (LPS) (MTS.) (MTS.) (M/SEC.) (MTS.) (M/SEC.) (MTS.) (MTS.) (MTS.)
1 2 3 4 5 6 7 8 9 10 11 12
AT RD = 0 RL = 499
150 265 102.54 13.38 17.91 2.15 0.76 104.69 1245.96 96.14 153.81 157.03
AT RD = 210 RL = 527.88
150 55 73.66 13.38 17.91 1.08 0.76 74.74 1245.96 96.14 110.49 112.12
AT RD = 240 RL = 1221.8
150 25 -620.26 13.38 17.91 0.49 0.76 -619.77 1245.96 96.14 -930.39 -929.65
TENSILE DIA OF OUTSIDE STRESS TEST WALL CORROSION WALL SUMMERY :- PROVIDE
STRENGTH PIPE DIA OF PIPE PRESSURE THICKNESS OR EROSION THICKNESS
* ALLOWANCES I/C 10% MILL RD
"D" "Do" "S" "P" "t" "C" TOLERANCE FROM TO
(Mpa) (MM) (MM) (Mpa) (Mpa) (MM) (MM) tm = t+c(MM)
17 18 19 20 21 22 23 24
210 150 355.60 124.00 1.71 2.88 1.65 4.82 210 240
210 150 355.60 124.00 -5.24 -8.83 1.65 -8.07 240 265
Hmax.=C Vo/g
Where
Hmax.=maximum pressure rise in the closed conduit above the normal pressure in mts.
C =velocity of pressure wave travel in m.sec.
Vo =normal velocity in the pipeline before sudden closure in m/sec.
g =acceleration due to gravity in sq.m/sec.
C =1425/sqrt.(1+(kd/Ect))
Where
k =bulk modulous of water (2.07*10^8 kg/sq.m)
d =diameter of pipe in mts.
Ct =wall thickness in mts.
E =modulous of elasticity of material in kg/sq.m (for steel pipes E=2.1*10^10)
P =2st/Do
Where
P =test pressure in Mpa
S =stress in Mpa which shall be taken as 40% of the
specified minimum tesile strength
t =specified thickness in mm
Do =outside diameter in mm
or t =PDo/2s
NGRA ( T/WEL AT MALAHRI)
UMMERY :- PROVIDE
AT RD = 0 RL = 1100
150 265 102.54 13.38 17.91 2.15 0.76 104.69 1267.47
AT RD = 90 RL = 1152
150 175 50.54 13.38 17.91 3.45 0.76 53.99 1245.96
AT RD = 240 RL = 1221.8
150 25 -19.26 13.38 17.91 0.49 0.76 -18.77 1217.62
SUMMERY :- PROVIDE
0 90 6.40 Fe 330 28
DATA:
Max. (design )discharge = 1156.032 Kld As per IS:1239:- As per IS:3589-2001
Dia of Pipe line (internal) = 150 mm Outer Dia of pipeline = 166.10 mm Outer dia of Pipe = $$$$ mm Grade Yld.Str.(Mpa)
RD of End (delivery)Pt. = 265.00 m Wall thk: (H) = GI (H) GI (M) Yield stress (Min) = 195 Mpa 330 195
RL of End (delivery Pt. = 152.60 m 5.40 mm 4.85 mm S = 60% Yield Stress = 117 Mpa 410 235
Mill Tolerance = 10.0 % Min. thk. Of Pipe wall = 4.0 mm
Co-eff.of pipe friction , 'C' = 100 Fibre Stress,S= 1/3x320 = 106.67 Mpa Mill Tolerance = 10.0 %
Corrosion allowance (thk)= 1.5 mm As per IS:1978-1982 Grade Fibre Stress
Avr. Pipe thk. (Assumed) = 4.80 mm (for water Hammer effect) Outer Dia of pipeline = 164.10 mm 170 102
Mod.of elasticity of pipe = 2.10E+10 Kg/m2 Joint Efficiency, JE = 0.85 Fibre Stress (Yst210) Std. S = = 124 Mpa 210 124
Wave velocity, C = 1245.96 m/sec Mill tolerance = 12.5 % 240 145
----- DATA ------------------>
Water Hammer
R.L. of Tl. Length Field Test Wall thk. Wall Thk Recommended Pipe Flange Pipe to
Working Pressure
Residual head)
(1st Pt) losses) =P.D e& 2) d
losses
allowan. Workin
g Pr.in
(15)
R.D.
From To (2nd Wall thk. Type and Class of
1.5 x (6 +8) Design
(6 +7 +8)
(1st) Pt) Pipe Line
1.5 x (8)
Pr., P=
Max.
(11,12,13)
RISING MAIN
Water requirement =
Carring capacity of R/ main in the year =
Economical dia of rising main. =
Total length of the rising main. =
Working Head Heavy class =
Medium class =
Rate of frictinal losses/1000 8.41
Top Rd. of rising main = 300 And RL= 1332.50
i) At RD = 0 And RL = 1200.00
Frictional lossesin the Rising main = 2.52
Add 10 % for other losses. = 0.25
Static Head. = 132.50
Residual Head. = 3.00
> 148
148
TO 0
120
Rd.
metres
es from
270 metres