Name of Work:- Ext./Aug. of LWSS DHANNI LADHORI IN TEHSIL NURPUR DISTT.KANGRA (HP) (stage -2nd)
DATA:
Max. (design )discharge = 675.630 Kld As per IS:1239:- As per IS:3589:-
Dia of Pipe line (internal) = 125.00 mm Outer Dia of pipeline = 140.60 mm Outer dia of = XXX mm Grade Yld Str.(Mpa)
RD of End (delivery)Pt. = 1765.00 m Wall thk: (H) = GI (H) GI (M) Yeild strength = 195.00 Mpa 330 195
RL of End (delivery Pt. = 213.50 m 5.40 mm 5.00 mm S = 60% yield St= 117.00 Mpa 410 235
Mill Tolerance = 10.0 % Min. thk. Of = 4.0 mm Values of 'E' (W.S. Manual Table6.7)
Co-eff.of pipe friction , 'C' = 100.00 Fibre Stress,S= 1/3x320 = 106.67 Mpa Mill Tolerance = 10.0 % Steel pipe 2.10E+10
Corrosion allowance (thk)= 1.5 mm Grade Fibre Stress Ductile Iron 1.70E+10
Avr. Pipe thk. (Assumed) = 4.0 mm (for water Hammer effect) Outer Dia of = XXX mm 170 102 C.I. Pipe 7.50E+10
Mod.of elasticity of pipe = 2.10E+10 Kg/m2 Joint Efficiency, JE = 0.85 = 124.00
Fibre Stress (Yst210) Std. Mpa 210 124 P.V.C. 3.00E+10
Wave velocity, C = 1245.96 m/sec Mill tolerance = 12.50 % 240 145
<-------------- DATA ------------------>
R.D. Field Test Pr. (Design Pr.) Recommended Pipe
Water
Hammer
Wall Thk i/c
Pressure
Working
Tol. Frictional
Pipe Line (name)
Residual
From To Wall thk. Type and Class of Pipe
1.5 x (6 +8)
Losses
head)
(6 +7 +8)
1.5 x (8)
(1st) (2nd Pt) Point (1st line (for Pr., P= corroson Line Refer
Pt) losses) Max. allowan. Working Pr.in
(11,12,13 2/3 x (14) (15) From RD To RD
) IS: 1239
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (mm) (mm) (mm) Use Losses
0 330 500.50 1765 11.6948 80.9322 -284.00 -408.46 -426 -191.37 -191.37 -272.3 ### -0.13 ... 5.00 GI pipe (Medium) 5 28 0 to 330 mm MSERW Pipe (IS:1978)
330 1170 571.11 1435 9.50823 80.9322 -354.61 -517.65 -531.915 -264.17 -264.17 -345.1 ### -0.75 ... 5.00 GI pipe (Medium) 5 17 330 to 1170 9.50823013
mm MSERW Pipe (IS:3589)
1170 1710 617.24 595 3.94244 80.9322 -400.74 -595.20 -601.11 -315.87 -315.87 -396.8 ### -1.19 ... 5.00 GI pipe (Medium) 5 17 1170 to 1710 MS Tube- Lig3.94243688
1710 1980 650.59 55 0.36443 80.9322 -434.09 -650.59 -651.135 -352.79 -352.79 -433.7 ### -1.51 ... 5.00 GI pipe (Medium) 5 5 1710 to 1980 MS Tube- Me0.36442694
1980 1765 650.59 -215 -1.42458 80.9322 -434.09 -653.27 -651.135 -354.58 -354.58 -435.5 ### -1.52 ... 5.00 GI pipe (Medium)
Economical Dia Statement and Design of Pumping Machinary
Name of Work :- Ext./Aug. of LWSS DHANNI LADHORI IN TEHSIL NURPUR DISTT.KANGRA (HP) (stage -2nd)
DATA:
1) Length of pumping(Rising) main = 1765.00 m Length of Delivery/Col. pipe= 0 m T. Length 1765.00 12) Value of `C' = 100 RATES FOR G.I. PIPES DIA DIA
2) R.L. of discharge (last) point = 213.50 m; Pipe class = m [S =>Spl.,H =>Heavy & M =>Med] 13) Cost of pumping unit per KW = Rs 6000 /= Per KW Dia Medium Heavy Special 32.00 40.00 32.00 25.00
3) R.L.of Pump Shaft /central axis= 100.50 m Start dia = 65 14) Rate of Interest 8.50 32 145.10 165.05 206.31 40.00 50.00 40.00 32.00
4) Low Water level in sump well = 96.50 m .'. T Static head +3m res.head= 120.00 m 15) Life of elec.motor & pump set = 15 years 40 160.20 184.05 230.06 50.00 65.00 50.00 40.00
5) Pumping hrs.@ the end of 15Yrs.= 8.00 hrs 16) Energy charges per unit = Rs 3.10 /= Per KW 50 208.20 240.55 300.69 65.00 80.00 65.00 50.00
6) No.of working Pumpsets provided= 1.00 & Standby= 1 [1=100%,0.5=50% &0=nil stdby] 17) Water available from Other Source 0 Lt/Day 65 256.30 297.15 371.44 80.00 100.00 80.00 65.00
7) Construction Period = 3 yrs. 80 308.70 358.15 447.69 100.00 125.00 100.00 80.00
8) Percentage rate of increase = 1.75% 100 435.75 503.20 629.00 125.00 150.00 125.00 100.00
CALCULATION OF ULTIMATE POPULATION Population Input CALCULATION OF WATER REQUIREMENT:
Person Students +HOSPTL Hostel Hotel Employee Pilgrim 7) Initial Total Water Requirement. = 150310 Lt/Day 125 544.80 617.35 771.69 150.00 200.00 150.00 125.00
9) Water requirement per capita per da 70 10 450 135 180 45 10 8) Initial Net Water Requirement. Q1= 150310 Lt/Day 150 665.20 728.60 910.75 200.00 250.00 200.00 150.00
10) Population as per Census 2001 1731 9) Intermed. Total Water Requirement = 187720 Lt/Day Spl.Class 250.00 300.00 250.00 200.00
11) Present population in 2009 1973 467 0 0 0 0 10) Intermed. Net Water Requirement, Q2=* 187720 Lt/Day (for (for P/M) 200 1092.90 1092.90 300.00 350.00 300.00 250.00
CALCULATIONS: 11) Ultimate Total Water Requirement = 225210 Lt/Day 250 1311.48 1311.48 350.00 400.00 350.00 300.00
1 Popu.i/c Const. Period = 2012 2077 492 0 0 0 0 0 12) Ultimate Net Water Requirement, Q3= 225210 Lt/Day= 225.21 300 1573.78
2 Int . Popu.after15 yrs = 2027 2594 614 0 0 0 0 0 13) Combined efficency of pumpset = 0.60 Kld 350 1888.54 400.00 450.00 400.00 350.00
3 Ult. Popu.after 30 years = 2042 3112 737 0 0 0 0 0 400 2266.25 450.00 500.00 450.00 400.00
1ST 15 YRS. 2ND 15 YRS 1ST 15 YRS. 2ND 15 YRS 450 2719.50 500.00 550.00 500.00 450.00
4 Discharge at installation = 0.150 mld 0.19 17) Avg.hrs of pumping avg. disc 7.20 7.33 500 3263.40 550.00 600.00 550.00 500.00
5 Discharge at the end of 15 Yrs.= 0.188 mld 0.23 18) KW. required per m Head 0.107 0.128 600.00 650.00 600.00 550.00
6 Average dicharge = 0.169 mld 0.21 19) Annual Energy charges per K 8155.39 8304.03
__ ____ _______ __________ _______ ________ ________ _______ _______ ________ ________ _______ ______ ________ _______ ________ ________ _______ _______ ________ __________ ________ _________ ___________ ________ __ ______
__ ____ _______ __________ _______ ________ ________ _______ _______ ________ ________ _______ ______ ________ _______ ________ ________ _______ _______ ________ __________
Total head