Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2020'
Institute Name: Indian Institute of Engineering Science and Technology [IR-E-U-0584]

Sanctioned (Approved) Intake


Academic Year 2018-19 2017-18 2016-17 2015-16 2014-15 2013-14

UG [4 Years Program(s)] 589 566 566 637 - -

PG [2 Year Program(s)] 315 318 - - - -

PG-Integrated 0 0 48 61 46 -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 1937 310 2247 1068 1161 18 475 748 748 4 0 471
Program(s)]

PG [2 Year 380 49 429 267 160 2 19 112 86 0 0 45


Program(s)]

PG-Integrated 114 41 155 79 76 0 17 22 22 0 0 17

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2013-14 517 468 2014-15 0 2016-17 418 299 600000(Six Lakh ) 34

2014-15 494 486 2015-16 0 2017-18 418 245 620000(Six Lakh 37


Twenty Thousand )

2015-16 637 610 2016-17 0 2018-19 439 316 650000(Six Lakh Fifty 52
Thousand )

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2015-16 357 269 2016-17 164 74 610000(Six Lakh Ten 27


Thousand )
2016-17 318 242 2017-18 184 43 625000(Six Lakh 63
Twenty Five Thousand
)

2017-18 318 210 2018-19 182 38 680000(Six Lakh 68


Eighty Thousand )

PG-Integrated [5 Years Program(s)]: Placement & higher studies for previous 3 years
Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2012-13 0 0 2016-17 0 0 0(Zero) 0

2013-14 0 0 2017-18 0 0 0(Zero) 0

2014-15 46 46 2018-19 46 11 680000(Six Lakh 2


Eighty Thousand )

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2018-19)

Total Students

Full Time 803

Part Time 0

No. of Ph.D students graduated (including Integrated Ph.D)

2018-19 2017-18 2016-17

Full Time 88 81 88

Part Time 0 0 0

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 22265723 (Two Crore Twenty Two Lakh Sixty Five Thousand 20166772 (Two Crore One Lakh Sixty Six Thousand Seven 16830249 (One Crore Sixty Eight Lakh Thirty Thousand Two
Seven Hundred Twenty Three ) Hundred Seventy Two ) Hundred Forty Nine )

New Equipment for Laboratories 151822616 (Fifteen Crore Eighteen Lakh Twenty Two 131524548 (Thirteen Crore Fifteen Lakh Twenty Four 85265626 (Eight Crore Fifty Two Lakh Sixty Five Thousand Six
Thousand Six Hundred Sixteen ) Thousand Five Hundred Forty Eight ) Hundred Twenty Six )

Engineering Workshops 0 (Zero) 0 (Zero) 0 (zero)

Other expenditure on creation of Capital Assets (excluding 6392434 (Sixty Three Lakh Ninety Two Thousand Four 22489763 (Two Crore Twenty Four Lakh Eighty Nine 165755627 (Sixteen Crore Fifty Seven Lakh Fifty Five
expenditure on Land and Building) Hundred Thirty Four ) Thousand Seven Hundred Sixty Three ) Thousand Six Hundred Twenty Seven )

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount


Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 840866429 (Eighty Four Crore Eight Lakh Sixty Six Thousand 686775212 (Sixty Eight Crore Sixty Seven Lakh Seventy Five 506334528 (Fifty Crore Sixty Three Lakh Thirty Four Thousand
Four Hundred Twenty Nine ) Thousand Two Hundred Twelve ) Five Hundred Twenty Eight )

Maintenance of Academic Infrastructure or consumables, 295693240 (Thirty Two Crore Eighty Five Lakh Forty Eight 331780986 (Thirty Three Crore Seventeen Lakh Eighty 240592373 (Twenty Seven Crore Five Lakh Ninety Two
other running expenditures etc.(excluding maintenance of Thousand Forty Four ) Thousand Nine Hundred Eighty Six ) Thousand Three Hundred Seventy Three )
hostels and allied services)

Seminars/Conferences/Workshops 1789092 (Seventeen Lakh Eighty Nine Thousand Ninety Two ) 3504256 (Thirty Five Lakh Four Thousand Two Hundred Fifty 3261396 (Thirty Two Lakh Sixty One Thousand Three Hundred
Six ) Ninety Six )

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like