ITEM ACTIVITY MANPOWER DURATION REMARKS DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY 8 DAY 9 DAY 10 DAY 11 DAY 12 DAY 13 DAY 14 DAY 15 DAY 16 DAY 17 DAY 18 Turbine Overhauling Activities P 0 hr. 1 Removal of all Turbine Instruments A 0 hr. P 0 hr. 2 Reinstallation of all removed instruments A 0 hr. P 0 hr. 3 Vibration voltage gap setting A 0 hr. Projects and Rectifications P 0 hr. 1 Stroke setting for Start-up Vent A 0 hr. P 0 hr. 2 Replacement of Ejector/Gland Sealing Steam PRDS TCV A 0 hr. P 0 hr. 3 Installation and cable laying for WTP signal isolators A 0 hr. P 0 hr. 4 Creation of export power display in DCS (coordination w/ MS-Electrical) A 0 hr. P 0 hr. 5 Channel transfer of all signal spikes in DCS A 0 hr. P 0 hr. 6 Calibration of gland sealing pressure gauges A 0 hr. P 0 hr. 7 Checking of probe length of all temperature elements A 0 hr. P 0 hr. 8 Arresting of leaks on hydrastep (Levelstate) A 0 hr. Routine Activities P 0 hr. 1 Cleaning and tightening of terminals of DCS I/O Panels A 0 hr. P 0 hr. 2 Cleaning and tightening of terminals of Turbine Control Panel (TCP) A 0 hr. P 0 hr. 3 Cleaning and tightening of terminals of Turbine Gauge Panel (TGP) A 0 hr. P 0 hr. 4 Cleaning and tightening of terminals of all Instrument Junction Boxes A 0 hr. P 0 hr. 5 Trial of MSSV and TSSV Main and Bypass MOVs A 0 hr. P 0 hr. 6 Gap Voltage checking on STG Vibration Monitors A 0 hr. P 0 hr. 7 Cleaning of DCS Operating and Eng'g Consoles and System Units A 0 hr. P 0 hr. 8 Air Dryer Maintenance A 0 hr. Stroke Checking and Correction of Control Valves & Dampers P 0 hr. 1 ID Fan Damper 11-PY-100A A 0 hr. P 0 hr. 2 SA Fan Damper 11-FY-106A A 0 hr. P 0 hr. 3 FD Fan Damper 11-FY-107A A 0 hr. P 0 hr. 4 CBD Tank Level CV 11-LCV-205 A 0 hr. P 0 hr. 5 Feed Water 100% FCV 11-FCV-1120A A 0 hr. P 0 hr. 6 Feed Water 30% FCV 11-LCV-1120B A 0 hr. P 0 hr. 7 Attemperator Water CV 11-TCV-606 A 0 hr. P 0 hr. 8 Soot Blowing Pressure CV 11-PCV-609 A 0 hr. P 0 hr. 9 Start Up Vent CV 11-HCV-1132 A 0 hr. P 0 hr. 10 Deaerator Pressure CV 11-PCV-102 A 0 hr. P 0 hr. 11 Deaerator Level CV 11-LCV-101 A 0 hr. P 0 hr. 12 Ejector/Gland Sealing Steam PRDS PCV 40-PCV-161 A 0 hr. P 0 hr. 13 Deaerator Pegging Steam PRDS PCV 40-PCV-162 A 0 hr. P 0 hr. 14 Process Bypass Steam PRDS PCV 40-PCV-163 A 0 hr. P 0 hr. 15 Ejector/Gland Sealing Steam PRDS TCV 40-TCV-161 A 0 hr. P 0 hr. 16 Deaerator Pegging Steam PRDS TCV 40-TCV-163 A 0 hr. P 0 hr. 17 Process Steam PRDS TCV 40-TCV-164 A 0 hr. P 0 hr. 18 Deaerator Overflow Shutoff 11-UV-103 A 0 hr. P 0 hr. 19 Hot Well Recirculation CV 21-LCV-300 A 0 hr. P 0 hr. 20 Hot Well Level CV 21-LCV-301 A 0 hr. P 0 hr. 21 Service Air SOV 40-UV-201 A 0 hr. MME CALIBRATION January 2024 Cancelled Calibration Activities P 0 hr. 1 Calibration: DMF Inlet Flow Tx. 60-FT-251 1 APRIL 2024 SHUT DOWN ACTIVITIES (MS - C & I) SCHEDULE TOTAL WORK ITEM ACTIVITY MANPOWER DURATION REMARKS DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY 8 DAY 9 DAY 10 DAY 11 DAY 12 DAY 13 DAY 14 DAY 15 DAY 16 DAY 17 DAY 18 1 Calibration: DMF Inlet Flow Tx. 60-FT-251 A 0 hr. P 0 hr. 2 Calibration: FG @ PSH Outlet PT 11-PT-102A A 0 hr. P 0 hr. 3 Calibration: FG @ ESP Inlet PT 11-PT-105 A 0 hr. P 0 hr. 4 Calibration: RO Outlet Flow Tx. 60-FT-281 A 0 hr. P 0 hr. 5 Calibration: FG @ APH Inlet PT 11-PT-104A A 0 hr. P 0 hr. 6 Calibration: SA Fan to Pn. Spreader PG 11-PG-217 A 0 hr. P 0 hr. 7 Calibration: FD Fan Disch. Air PT 11-PT-200 A 0 hr. P 0 hr. 8 Calibration: SA Fan to TG Cooling Air PG 11-PG-216 A 0 hr. P 0 hr. 9 Calibration: FD Fan Air @ APH O/L PT 11-PT-203 A 0 hr. P 0 hr. 10 Calibration: SA Fan Air Flow Tx. 11-FT-201 A 0 hr. P 0 hr. 11 Calibration: DMW Storage Tank #1 LT 40-LT-103A A 0 hr. P 0 hr. 12 Calibration: DMW Storage Tank #2 LT 40-LT-103B A 0 hr. P 0 hr. 13 Calibration: Belt Weigher # 1 70-BWS-1 A 0 hr. P 0 hr. 14 Calibration: Belt Weigher # 2 70-BWS-2 A 0 hr. P 0 hr. 15 Calibration: ESP #1 Dome Seal PS 30-PSI-131 A 0 hr. P 0 hr. 16 Calibration: Boiler Instrument Air PT 11-PT-110 A 0 hr. P 0 hr. 17 Calibration: Soot Blower Steam O/L PT 11-PT-609 A 0 hr. P 0 hr. 18 Calibration: FW @ ECO Inlet PT 11-PT-501 A 0 hr. P 0 hr. 19 Calibration: CT Make-up Pump Disch. PT 40-PT-104 A 0 hr. P 0 hr. 20 Calibration: Inst. Air Receiver Tank PT 40-PT-107 A 0 hr. P 0 hr. 21 Calibration: CBD Tank Level Tx. 11-LT-205 A 0 hr. P 0 hr. 22 Calibration: ESP #2 Dome Seal PS 30-PSI-141 A 0 hr. P 0 hr. 23 Calibration: ESP #2 Vessel PS (High) 30-PSH-141 A 0 hr. P 0 hr. 24 Calibration: ESP #2 Vessel PS (Low) 30-PSL-141 A 0 hr. P 0 hr. 25 Calibration: Deaerator Pressure Tx. 11-PT-102 A 0 hr. P 0 hr. 26 Calibration: FG @ Boiler Bank Outlet PT 11-PT-103 A 0 hr.
Full Chapter Nitride Semiconductor Light Emitting Diodes Leds Materials Technologies and Applications Woodhead Publishing Series in Electronic and Optical Materials 1St Edition Huang PDF