Date- 13/05/2024
PROVITA GROUP
Provita Tower, House # 21 Rd 35, Dhaka 1212
Sub:- Offer for Supply of 11/0.415 KV, 150 KVA Sub-Station Equipment.
Dear Sir,
We thank you a lot for your interest in Powerforce. The complete offer is enclosed along with price And
technical details as desired dry you. With reference to your request for supply of Sub-Station equipment,
we are hereby submitting our best offer for the mentioned equipment with the following terms &
conditions.
Thanking you
Thanking You
OUTGOING :
1 No. T1C 160 FF R125A ( FOR PFI )
125 A, 25 KA, TP MCCB with adjustable thermal overload and adjustable magnetic
short-circuit releases.
1 No. T3N 250 FF R200A ( FOR METERING PANEL With ATS )
200 A, 36 KA, TP MCCB with adjustable thermal overload and adjustable magnetic
short-circuit releases.
1 No. S203 –C 63A ( FOR SOLAR PANEL )
63 A, 6 KA, TP MCB
ORIGIN : ALL MCCB ABB, ITALY.
METERING SYSTEM :
DIGITAL MULTI METER : SECURE, INDIA.
HEAT REDUCED FAN SYSTEM.
TEMPARATURE METER SYSTEM.
DOUBLE DOOR LAMP SYSTEM.
ASSEMBLED BY POWERFORCE ENGINEERING LTD. BANGLADESH.
03 1 SET 90 KVAR AUTOMATIC PFI PLANT :
Sheet steel clad powder coated (14 SWG), dust and vermin proof, free standing, floor
mounting, 415V, 50 Hz, 90 KVAR Indoor type Automatic Power Factor Improvement
Plant, with hard drawn copper busbars, TP+E comprising :-
2 Nos. 20 KVAR Bank of TP dry type Power Capacitors with built-in discharge
resister.
3 Nos. 15 KVAR Bank of TP dry type Power Capacitors with built-in discharge
resister.
1 No. 5 KVAR Bank of TP dry type Power Capacitors with built-in discharge resister
(Direct).
ORIGIN : ANER, SPAIN.
14 Nos. DMC-22b. Magnetic Contactor AC Coil 20A (AC3), 3P, ITH 40A , (AC1)
(Floor)
2 Nos. DMC-40b. Magnetic Contactor AC Coil 32A (AC3), 3P, ITH 60A , (AC1)
(Motor)
2 Nos. DMC-85b. Magnetic Contactor AC Coil 78A (AC3), 3P, ITH 135A , (AC1)
(Lift)
ORIGEN : DONGA OR HYUNDAI, KOREA.
OUTGOING :
1 No. T1C 160 FF R100A ( LIFT.)
100 A, 25KA, TP MCCB with adjustable thermal overload and adjustable magnetic
short-circuit releases.
20 Nos. SH203-C32 A (UNIT FLOOR)
32 A, 6 KA, DP MCB with adjustable magnetic short-circuit releases.
1 No. SH203-C40 A (MOTOR-1)
40 A, 6 KA, TP MCB with adjustable magnetic short-circuit releases.
1 No. SH203-C40 A (MOTOR-2)
40 A, 6 KA, DP MCB with adjustable magnetic short-circuit releases.
20 Nos. SH201-C16 A (UNIT FLOOR / COMM.)
16 A, 6 KA, SP MCB with adjustable magnetic short-circuit releases.
ORIGIN : ALL MCB ABB, GERMANY.
METERING SYSTEM :
HEAT REDUCED FAN SYSTEM.
DOUBLE DOOR LAMP SYSTEM.
ASSEMBLED BY POWERFORCE ENGINEERING LTD. BANGLADESH.
07 EARTHING FOR SUBSTATION:-
6 SET EARTH ELECTRODE
Installation of 1x20', 1½" dia GI Pipe having ¼" hole at required' interval l buried upto
the depth of 100'- 0"(with connecting copper link) in the damp soil including 2 SWG
copper wire from bottom of GI Pipe upto connecting link.
2 SET EARTHING BLOCK
Installation, testing and commissioning of copper earthing block with required Nos. of
¼" hole one for ECC connection Size - 254mm x 30mm x 10mm and another for
transformer neutral earthing.
120 rft EARTHING LEAD
Installation of earthing lead, 2 SWG copper wire through 1" dia GI pipe (if required
than supplied by customer) from earthing block to earth electrode including inter-
connection between two electrodes.
100 rft EARTH CONTINUITY CONDUCTOR
Installation of 2 SWG copper earth continuity conductor running from the bodies of
substation equipment to the earthing block.
08 1M HT CABLE
Supply, laying and terminating of 11KV HT cable type NYSEYFGbY 3cx70mm² of
M/s. BRB/RR/BBS Cables Ltd.
- PIB tape
- Carbon Tetrachloride (CTC)
- Cable lugs
- Nut, Bolt, Brick, Sand, etc.
1M LT CABLE
Supply, laying and terminating of LT cable type NYY 1cx 120 mm² from transformer
LT bushing to LT panel as double cable per phase including supply of
M/s. BRB/RR/BBS Cables Ltd.
- PIB tape
- Cable lugs
- Nut, Bolt, etc.
09 2 SET Supply & installation of Heat Shrinkable cable end kit for HT cable terminal
protection.
SN QTY. PRICE PROPOSAL UNIT TOTAL
PRICE PRICE
150 KVA SUB-STATION EQUIPMENT
PART –A
01 1 SET 150 KVA 11/0.415 KV TRANSFORMER 390000 390000
02 1 SET LT SWITCHGEAR PANEL 250 A 140000 140000
03 1 SET 90 KVAR PFI PLANT WITH CIRCUIT BREAKER 110000 110000
04 1 SET DROPOUT FUSE 10000 10000
05 1 SET LIGHTNING ARRESTOR 10000 10000
06 1 JOB ELECTRICAL LICENSING BOARD PURPOSE 60000 60000
07 6 SET EARTHING FOR SUB-STATION EQUIPMENT 25000 150000
08 1 JOB TRANSPORTATION & LOADING AND 45000 45000
UNLOADING WITH INSTALLATION
09 2 SET HEAT SHRINK KIT 3500 7000
10 1 JOB INSTALLATION ACCESSORIES 15000 15000
SUB - TOTAL TAKA 937000
PART- B (DESCO METERING)
01 1 SET 11KV INDOOR LT-CT METERING 90000 90000
02 1 JOB DEMAND LOAD PERMISSION COST 80000 80000
03 1 JOB DEMAND LOAD COST(120 KW) 120000 120000
04 1 JOB MATERALS COST 45000 45000
05 18 Set SINGLE PHASE METER COST 6500 117000
06 18 Set SINGLE PHASE METER CONNECTION COST 15000 15000
07 1 JOB APPLICATION FREE MATHER METER 7000 7000
SUB - TOTAL TAKA 474000
PART- C (METERING PANEL WITH ATS)
01 1 SET METERING BOX WITH ATS PANEL-200A 290000 290000
SUB - TOTAL TAKA 290000
PART- D (SOLAR SYSTEM)
01 1 KW SOLAR SYSTEM (ON GRID) 70000
SUB - TOTAL TAKA
PART- F (CABLE)
01 1M 3C x 70 mm² (NYSEYFGbY) BRB/RR/BBS 8313
02 1M 1C x 120 mm² (NYY) BRB/RR/BBS(FOR Tr. to LT) 2426
03 1M 1Cx96 mm² (NYY) BRB/RR/BBS (FOR LT to 1942
METERING BOX)
04 1M 1Cx70 mm² (NYY) BRB/RR/BBS (FOR LT to PFI) 1453
05 1M 1Cx16 mm² (BYA) BRB/RR/BBS (FOR EARTHING) 324
06 1M 1Cx10 mm² (BYA) BRB/RR/BBS (FOR HT CABLE
EARTHING) 205
SUB - TOTAL TAKA
TOTAL (PART-A+B+C+D) TAKA 1701000