Sample Bar Chart and S-Curve
Sample Bar Chart and S-Curve
Chart Title
FEBRUARY
FEB. 27-
MARCH 1-31, 2024
MARCH
SCOPE OF WORKS APRIL 1-30, 2024 MAY 1-31, 2024 JUNE 1-30, 2024 JULY 1-25, 2024
APRIL
JUNE
JULY
MAY
QUANTITY UNIT UNIT COST AMOUNT WT (%) DURATION
DATE DATE 29, 2024
START COMPLETED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
ITEM NO. ITEM DESCRIPTION
27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 5.00 mos 16,128.00 80,640.00 0.78% 150 0.0002 0.0016 0.0016 0.0016 0.0016 0.0013 27-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B.3(1) Permits and Clearances 1.00 l.s. 66,000.00 66,000.00 0.64% 30 0.0006 0.0058 0.0000 0.0000 0.0000 0.0000 27-Apr-24 27-Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B.5 (1) Project Billboard / Signboard 2.00 ea. 6,600.00 13,200.00 0.13% 2 0.0013 0.0000 0.0000 0.0000 0.0000 0.0000 28-Apr-24 28-Feb-24 0 0
B.7(1) Occupational Safety and Health 1.00 l.s. 66,000.00 66,000.00 0.64% 150 0.0001 0.0013 0.0013 0.0013 0.0013 0.0011 29-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B.9 (1) Mobilization/Demobilization 1.00 l.s. 100,800.00 100,800.00 0.98% 10 0.0029 0.0020 0.0000 0.0000 0.0000 0.0049 30-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0
B.24 (2) General Scaffolding and shoring and Netting 1.00 rental 396,000.00 396,000.00 3.83% 115 0.0000 0.0013 0.0100 0.0103 0.0100 0.0067 28-Mar-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
801 (1) Removal of Structures and Obstruction 1.00 l.s. 66,000.00 66,000.00 0.64% 15 0.0000 0.0064 0.0000 0.0000 0.0000 0.0000 03-Mar-24 17-Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
803(1)a Structure Excavation, Common Soil 161.31 cu.m 845.00 136,306.95 1.32% 7 0.0000 0.0132 0.0000 0.0000 0.0000 0.0000 18-Mar-24 24-Mar-24 0 0 0 0 0 0 0
Embankment from Roadway/Structure Excavation, Common 73.55 cu.m 47,807.50 7 0.0000 0.0000 0.0046 0.0000 0.0000 0.0000
804(1)a 650.00 0.46% 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0
Soil
804(2)a Embankment from Borrow, Common Soil 87.45 cu.m 975.00 85,263.75 0.83% 7 0.0000 0.0000 0.0083 0.0000 0.0000 0.0000 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0
804(7) Gravel Fill 41.87 cu.m 2,004.41 83,924.65 0.81% 7 0.0000 0.0000 0.0081 0.0000 0.0000 0.0000 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0
900(1)c Structural Concrete, 3000 psi, Class A, 28 days 29.83 cu.m 9,408.00 280,640.64 2.72% 30 0.0000 0.0063 0.0208 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
900(1)d Structural Concrete, 4000 psi, Class A, 28 days 67.48 cu.m 10,080.00 680,198.40 6.58% 30 0.0000 0.0154 0.0505 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
902(1)a1 Reinforcing Steel (Deformed), Grade 40 4,406.68 kgs. 107.52 473,806.23 4.59% 30 0.0000 0.0107 0.0352 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
902(1)a2 Reinforcing Steel (Deformed), Grade 60 9,630.32 kgs. 127.68 1,229,599.26 11.90% 30 0.0000 0.0278 0.0913 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
903(2) Formworks and Falseworks 532.46 sq.m 537.60 286,250.50 2.77% 30 0.0000 0.0065 0.0212 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100 mm 111.03 sq.m 1,022.60 113,539.28 1.10% 30 0.0000 0.0000 0.0026 0.0084 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150 mm 165.94 sq.m 1,042.31 172,960.92 1.67% 30 0.0000 0.0000 0.0039 0.0128 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1003(17) Carpentry and Joinery Works 1.00 l.s. 24,192.00 24,192.00 0.23% 7 0.0000 0.0000 0.0000 0.0000 0.0003 0.0020 30-Jun-24 06-Jul-24 0 0 0 0 0 0 0
1004(2) Finishing Hardware 1.00 l.s. 13,440.00 13,440.00 0.13% 7 0.0000 0.0000 0.0000 0.0000 0.0002 0.0011 30-Jun-24 06-Jul-24 0 0 0 0 0 0 0
1005(5) Steel Window 1.00 l.s. 33,600.00 33,600.00 0.33% 20 0.0000 0.0000 0.0000 0.0000 0.0023 0.0010 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1008(1)c Aluminum Glass Windows, Awning Type 1.08 sq.m 5,376.00 5,806.08 0.06% 20 0.0000 0.0000 0.0000 0.0000 0.0004 0.0002 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1009(1)a Jalousie Windows, Glass 47.95 sq.m 3,360.00 161,112.00 1.56% 20 0.0000 0.0000 0.0000 0.0000 0.0109 0.0047 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1010(1) Frames, Jambs, Sills, Head, Transoms and Mullions 35.00 set 6,048.00 211,680.00 2.05% 20 0.0000 0.0000 0.0000 0.0000 0.0143 0.0061 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1010(2)a Doors, Flush 6.30 sq.m 3,360.00 21,168.00 0.20% 20 0.0000 0.0000 0.0000 0.0000 0.0014 0.0006 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1010(2)b Doors, Wood Panel 19.32 sq.m 6,048.00 116,847.36 1.13% 20 0.0000 0.0000 0.0000 0.0000 0.0079 0.0034 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1003(1)a1 Ceiling, 4.5mm, Metal Frame, Fiber Cement Board 370.72 sq.m 873.60 323,860.99 3.14% 7 0.0000 0.0000 0.0000 0.0224 0.0090 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0
1003(2)a1 Wall, 4.5mm, Metal Frame, Fiber Cement Board 19.41 sq.m 1,008.00 19,565.28 0.19% 7 0.0000 0.0000 0.0000 0.0014 0.0005 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0
1016(1)b Waterproofing, Liquid 137.78 sq.m 604.80 83,329.34 0.81% 14 0.0000 0.0000 0.0000 0.0081 0.0000 0.0000 10-May-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1018(1) Glazed Tiles and Trims 30.34 sq.m 1,963.46 59,571.38 0.58% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0058 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1018(2) Unglazed Tiles 11.41 sq.m 1,861.22 21,236.52 0.21% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0021 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1021(1)c Cement Floor Finish, with Floor Hardener 280.14 sq.m 403.20 112,952.45 1.09% 14 0.0000 0.0000 0.0000 0.0000 0.0109 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1027(1) Cement Plaster Finish 937.80 sq.m 873.60 819,262.08 7.93% 14 0.0000 0.0000 0.0000 0.0000 0.0793 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1038(1) Reflective Insulation 370.72 sq.m 604.80 224,211.46 2.17% 7 0.0000 0.0000 0.0000 0.0155 0.0062 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0
1051(1)a Railing 1.00 l.s. 47,040.00 47,040.00 0.46% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0046 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1032(1)a Painting Works, Masonry/Concrete 1,150.75 sq.m 268.80 309,321.60 2.99% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0299 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1032(1)b Painting Works, Wood 445.72 sq.m 201.60 89,857.15 0.87% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0087 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1032(1)c Painting Works, Steel 396.47 sq.m 188.16 74,599.80 0.72% 30 0.0000 0.0000 0.0017 0.0055 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1003(12) Fascia Board, Metal 12.27 kgs. 161.28 1,978.91 0.02% 10 0.0000 0.0000 0.0000 0.0002 0.0000 0.0000 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Fabricated Metal Roofing Accessory, Gauge 26 (0.551 mm), 41.82 l.m. 39,344.26 10 0.0000 0.0000 0.0000 0.0030 0.0008 0.0000
1013(2)a 940.80 0.38% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Ridge/Hip Rolls
Fabricated Metal Roofing Accessory, Gauge 26 (0.551 mm), 21.00 l.m. 34,386.24 10 0.0000 0.0000 0.0000 0.0027 0.0007 0.0000
1013(2)b 1,637.44 0.33% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Flashing
Pre-painted Metal Sheets, above 0.427 mm, Corrugated, Long 439.17 sq.m 413,171.14 10 0.0000 0.0000 0.0000 0.0320 0.0080 0.0000
1014(1)a2 940.80 4.00% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Span
1047(2) Metal Structures 1.00 l.s. 20,160.00 20,160.00 0.20% 30 0.0000 0.0000 0.0005 0.0015 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(4)a Metal Structure Accessories, Bolts and Rods 104.00 ea. 336.00 34,944.00 0.34% 30 0.0000 0.0000 0.0008 0.0026 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(4)b Metal Structure Accessories, Turnbuckle 34.00 ea. 336.00 11,424.00 0.11% 30 0.0000 0.0000 0.0003 0.0008 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(5)b Metal Structure Accessories, Sagrods 170.89 kgs. 127.68 21,819.24 0.21% 30 0.0000 0.0000 0.0005 0.0016 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(5)c Metal Structure Accessories, Cross Bracing 260.79 kgs. 127.68 33,297.67 0.32% 30 0.0000 0.0000 0.0008 0.0025 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(5)d Metal Structure Accessories, Steel Plates 687.90 kgs. 302.40 208,020.96 2.01% 30 0.0000 0.0000 0.0047 0.0154 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(8)a Structural Steel, Trusses 3,738.68 kgs. 127.68 477,354.66 4.62% 30 0.0000 0.0000 0.0108 0.0354 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1047(8)b Structural Steel, Purlins 4,309.95 kgs. 127.68 550,294.42 5.33% 30 0.0000 0.0000 0.0124 0.0408 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1001(2) Concrete Gutter 54.00 m. 10,080.00 544,320.00 5.27% 14 0.0000 0.0000 0.0000 0.0527 0.0000 0.0000 10-May-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1001(5)b Catch Basin, CHB 18.00 ea. 13,440.00 241,920.00 2.34% 14 0.0000 0.0000 0.0000 0.0000 0.0234 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1001(8) Sewer Line Works 1.00 l.s. 47,040.00 47,040.00 0.46% 14 0.0000 0.0000 0.0000 0.0000 0.0046 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1001(9) Storm Drainage and Downspout 1.00 l.s. 67,200.00 67,200.00 0.65% 14 0.0000 0.0000 0.0000 0.0000 0.0065 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1001(11) Septic Vault/Tank, Concrete/CHB 1.00 l.s. 114,240.00 114,240.00 1.11% 14 0.0000 0.0000 0.0000 0.0000 0.0111 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1002(4) Plumbing Fixtures 1.00 l.s. 33,600.00 33,600.00 0.33% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0033 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0
1002(24) Cold Water Lines 1.00 l.s. 40,320.00 40,320.00 0.39% 14 0.0000 0.0000 0.0000 0.0000 0.0039 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) 1.00 l.s. 26,880.00 26,880.00 0.26% 14 0.0000 0.0000 0.0000 0.0000 0.0026 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1101(33) Wires and Wiring Devices 1.00 l.s. 26,880.00 26,880.00 0.26% 14 0.0000 0.0000 0.0000 0.0000 0.0026 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1102(1) Panelboard with Main & Branch Breakers 1.00 l.s. 26,610.50 26,610.50 0.26% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0026 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0
1103(1) Lighting Fixtures 1.00 l.s. 162,894.51 162,894.51 1.58% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0158 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0
SCHEDULED ACCOMPLISHMENT PERIODIC (%) 0.51% 9.82% 29.16% 27.87% 22.07% 10.56%
SCHEDULED ACCOMPLISHMENT CUMULATIVE (%) 0.51% 10.33% 39.50% 67.37% 89.44% 100.00%
SCHEDULED ACCOMPLISHMENT PERIODIC (PESOS) ₱52,972.80 ₱1,014,395.30 ₱3,012,637.93 ₱2,878,714.19 ₱2,279,810.60 ₱1,091,161.26
SCHEDULED ACCOMPLISHMENT CUMULATIVE (PESOS) ₱52,972.80 ₱1,067,368.10 ₱4,080,006.03 ₱6,958,720.22 ₱9,238,530.82 ₱10,329,692.08
PROJECT TITLE/LOCATION: PREPARED BY: CHECKED BY: REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: