PDM DIAGRAM, BAR CHART AND S - CURVE

Contract no. 23KK0200


Name of Project Repair/Rehabilitation of Four (4) Classrooms, Dreamland ES
Location of the Contract Gingoog City, Misamis Oriental
Duration 150 Calendar Days

Chart Title

Bar Chart and S-curve

FEBRUARY
FEB. 27-
MARCH 1-31, 2024

MARCH
SCOPE OF WORKS APRIL 1-30, 2024 MAY 1-31, 2024 JUNE 1-30, 2024 JULY 1-25, 2024

APRIL

JUNE

JULY
MAY
QUANTITY UNIT UNIT COST AMOUNT WT (%) DURATION
DATE DATE 29, 2024
START COMPLETED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
ITEM NO. ITEM DESCRIPTION
27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 5.00 mos 16,128.00 80,640.00 0.78% 150 0.0002 0.0016 0.0016 0.0016 0.0016 0.0013 27-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

B.3(1) Permits and Clearances 1.00 l.s. 66,000.00 66,000.00 0.64% 30 0.0006 0.0058 0.0000 0.0000 0.0000 0.0000 27-Apr-24 27-Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

B.5 (1) Project Billboard / Signboard 2.00 ea. 6,600.00 13,200.00 0.13% 2 0.0013 0.0000 0.0000 0.0000 0.0000 0.0000 28-Apr-24 28-Feb-24 0 0

B.7(1) Occupational Safety and Health 1.00 l.s. 66,000.00 66,000.00 0.64% 150 0.0001 0.0013 0.0013 0.0013 0.0013 0.0011 29-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

B.9 (1) Mobilization/Demobilization 1.00 l.s. 100,800.00 100,800.00 0.98% 10 0.0029 0.0020 0.0000 0.0000 0.0000 0.0049 30-Apr-24 25-Jul-24 0 0 0 0 0 0 0 0 0 0

B.24 (2) General Scaffolding and shoring and Netting 1.00 rental 396,000.00 396,000.00 3.83% 115 0.0000 0.0013 0.0100 0.0103 0.0100 0.0067 28-Mar-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

801 (1) Removal of Structures and Obstruction 1.00 l.s. 66,000.00 66,000.00 0.64% 15 0.0000 0.0064 0.0000 0.0000 0.0000 0.0000 03-Mar-24 17-Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

803(1)a Structure Excavation, Common Soil 161.31 cu.m 845.00 136,306.95 1.32% 7 0.0000 0.0132 0.0000 0.0000 0.0000 0.0000 18-Mar-24 24-Mar-24 0 0 0 0 0 0 0
Embankment from Roadway/Structure Excavation, Common 73.55 cu.m 47,807.50 7 0.0000 0.0000 0.0046 0.0000 0.0000 0.0000
804(1)a 650.00 0.46% 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0
Soil
804(2)a Embankment from Borrow, Common Soil 87.45 cu.m 975.00 85,263.75 0.83% 7 0.0000 0.0000 0.0083 0.0000 0.0000 0.0000 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0

804(7) Gravel Fill 41.87 cu.m 2,004.41 83,924.65 0.81% 7 0.0000 0.0000 0.0081 0.0000 0.0000 0.0000 17-Apr-24 23-Apr-24 0 0 0 0 0 0 0

900(1)c Structural Concrete, 3000 psi, Class A, 28 days 29.83 cu.m 9,408.00 280,640.64 2.72% 30 0.0000 0.0063 0.0208 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

900(1)d Structural Concrete, 4000 psi, Class A, 28 days 67.48 cu.m 10,080.00 680,198.40 6.58% 30 0.0000 0.0154 0.0505 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

902(1)a1 Reinforcing Steel (Deformed), Grade 40 4,406.68 kgs. 107.52 473,806.23 4.59% 30 0.0000 0.0107 0.0352 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

902(1)a2 Reinforcing Steel (Deformed), Grade 60 9,630.32 kgs. 127.68 1,229,599.26 11.90% 30 0.0000 0.0278 0.0913 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

903(2) Formworks and Falseworks 532.46 sq.m 537.60 286,250.50 2.77% 30 0.0000 0.0065 0.0212 0.0000 0.0000 0.0000 25-Mar-24 23-Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100 mm 111.03 sq.m 1,022.60 113,539.28 1.10% 30 0.0000 0.0000 0.0026 0.0084 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150 mm 165.94 sq.m 1,042.31 172,960.92 1.67% 30 0.0000 0.0000 0.0039 0.0128 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1003(17) Carpentry and Joinery Works 1.00 l.s. 24,192.00 24,192.00 0.23% 7 0.0000 0.0000 0.0000 0.0000 0.0003 0.0020 30-Jun-24 06-Jul-24 0 0 0 0 0 0 0

1004(2) Finishing Hardware 1.00 l.s. 13,440.00 13,440.00 0.13% 7 0.0000 0.0000 0.0000 0.0000 0.0002 0.0011 30-Jun-24 06-Jul-24 0 0 0 0 0 0 0

1005(5) Steel Window 1.00 l.s. 33,600.00 33,600.00 0.33% 20 0.0000 0.0000 0.0000 0.0000 0.0023 0.0010 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1008(1)c Aluminum Glass Windows, Awning Type 1.08 sq.m 5,376.00 5,806.08 0.06% 20 0.0000 0.0000 0.0000 0.0000 0.0004 0.0002 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1009(1)a Jalousie Windows, Glass 47.95 sq.m 3,360.00 161,112.00 1.56% 20 0.0000 0.0000 0.0000 0.0000 0.0109 0.0047 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1010(1) Frames, Jambs, Sills, Head, Transoms and Mullions 35.00 set 6,048.00 211,680.00 2.05% 20 0.0000 0.0000 0.0000 0.0000 0.0143 0.0061 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1010(2)a Doors, Flush 6.30 sq.m 3,360.00 21,168.00 0.20% 20 0.0000 0.0000 0.0000 0.0000 0.0014 0.0006 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1010(2)b Doors, Wood Panel 19.32 sq.m 6,048.00 116,847.36 1.13% 20 0.0000 0.0000 0.0000 0.0000 0.0079 0.0034 17-Jun-24 06-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1003(1)a1 Ceiling, 4.5mm, Metal Frame, Fiber Cement Board 370.72 sq.m 873.60 323,860.99 3.14% 7 0.0000 0.0000 0.0000 0.0224 0.0090 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0

1003(2)a1 Wall, 4.5mm, Metal Frame, Fiber Cement Board 19.41 sq.m 1,008.00 19,565.28 0.19% 7 0.0000 0.0000 0.0000 0.0014 0.0005 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0

1016(1)b Waterproofing, Liquid 137.78 sq.m 604.80 83,329.34 0.81% 14 0.0000 0.0000 0.0000 0.0081 0.0000 0.0000 10-May-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1018(1) Glazed Tiles and Trims 30.34 sq.m 1,963.46 59,571.38 0.58% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0058 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1018(2) Unglazed Tiles 11.41 sq.m 1,861.22 21,236.52 0.21% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0021 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1021(1)c Cement Floor Finish, with Floor Hardener 280.14 sq.m 403.20 112,952.45 1.09% 14 0.0000 0.0000 0.0000 0.0000 0.0109 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1027(1) Cement Plaster Finish 937.80 sq.m 873.60 819,262.08 7.93% 14 0.0000 0.0000 0.0000 0.0000 0.0793 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1038(1) Reflective Insulation 370.72 sq.m 604.80 224,211.46 2.17% 7 0.0000 0.0000 0.0000 0.0155 0.0062 0.0000 27-May-24 02-Jun-24 0 0 0 0 0 0 0

1051(1)a Railing 1.00 l.s. 47,040.00 47,040.00 0.46% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0046 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1032(1)a Painting Works, Masonry/Concrete 1,150.75 sq.m 268.80 309,321.60 2.99% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0299 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1032(1)b Painting Works, Wood 445.72 sq.m 201.60 89,857.15 0.87% 14 0.0000 0.0000 0.0000 0.0000 0.0000 0.0087 07-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1032(1)c Painting Works, Steel 396.47 sq.m 188.16 74,599.80 0.72% 30 0.0000 0.0000 0.0017 0.0055 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1003(12) Fascia Board, Metal 12.27 kgs. 161.28 1,978.91 0.02% 10 0.0000 0.0000 0.0000 0.0002 0.0000 0.0000 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0

Fabricated Metal Roofing Accessory, Gauge 26 (0.551 mm), 41.82 l.m. 39,344.26 10 0.0000 0.0000 0.0000 0.0030 0.0008 0.0000
1013(2)a 940.80 0.38% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Ridge/Hip Rolls
Fabricated Metal Roofing Accessory, Gauge 26 (0.551 mm), 21.00 l.m. 34,386.24 10 0.0000 0.0000 0.0000 0.0027 0.0007 0.0000
1013(2)b 1,637.44 0.33% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Flashing
Pre-painted Metal Sheets, above 0.427 mm, Corrugated, Long 439.17 sq.m 413,171.14 10 0.0000 0.0000 0.0000 0.0320 0.0080 0.0000
1014(1)a2 940.80 4.00% 24-May-24 02-Jun-24 0 0 0 0 0 0 0 0 0 0
Span
1047(2) Metal Structures 1.00 l.s. 20,160.00 20,160.00 0.20% 30 0.0000 0.0000 0.0005 0.0015 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(4)a Metal Structure Accessories, Bolts and Rods 104.00 ea. 336.00 34,944.00 0.34% 30 0.0000 0.0000 0.0008 0.0026 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(4)b Metal Structure Accessories, Turnbuckle 34.00 ea. 336.00 11,424.00 0.11% 30 0.0000 0.0000 0.0003 0.0008 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(5)b Metal Structure Accessories, Sagrods 170.89 kgs. 127.68 21,819.24 0.21% 30 0.0000 0.0000 0.0005 0.0016 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(5)c Metal Structure Accessories, Cross Bracing 260.79 kgs. 127.68 33,297.67 0.32% 30 0.0000 0.0000 0.0008 0.0025 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(5)d Metal Structure Accessories, Steel Plates 687.90 kgs. 302.40 208,020.96 2.01% 30 0.0000 0.0000 0.0047 0.0154 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(8)a Structural Steel, Trusses 3,738.68 kgs. 127.68 477,354.66 4.62% 30 0.0000 0.0000 0.0108 0.0354 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1047(8)b Structural Steel, Purlins 4,309.95 kgs. 127.68 550,294.42 5.33% 30 0.0000 0.0000 0.0124 0.0408 0.0000 0.0000 24-Apr-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1001(2) Concrete Gutter 54.00 m. 10,080.00 544,320.00 5.27% 14 0.0000 0.0000 0.0000 0.0527 0.0000 0.0000 10-May-24 23-May-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1001(5)b Catch Basin, CHB 18.00 ea. 13,440.00 241,920.00 2.34% 14 0.0000 0.0000 0.0000 0.0000 0.0234 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1001(8) Sewer Line Works 1.00 l.s. 47,040.00 47,040.00 0.46% 14 0.0000 0.0000 0.0000 0.0000 0.0046 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1001(9) Storm Drainage and Downspout 1.00 l.s. 67,200.00 67,200.00 0.65% 14 0.0000 0.0000 0.0000 0.0000 0.0065 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1001(11) Septic Vault/Tank, Concrete/CHB 1.00 l.s. 114,240.00 114,240.00 1.11% 14 0.0000 0.0000 0.0000 0.0000 0.0111 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1002(4) Plumbing Fixtures 1.00 l.s. 33,600.00 33,600.00 0.33% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0033 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0

1002(24) Cold Water Lines 1.00 l.s. 40,320.00 40,320.00 0.39% 14 0.0000 0.0000 0.0000 0.0000 0.0039 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) 1.00 l.s. 26,880.00 26,880.00 0.26% 14 0.0000 0.0000 0.0000 0.0000 0.0026 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1101(33) Wires and Wiring Devices 1.00 l.s. 26,880.00 26,880.00 0.26% 14 0.0000 0.0000 0.0000 0.0000 0.0026 0.0000 03-Jun-24 16-Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1102(1) Panelboard with Main & Branch Breakers 1.00 l.s. 26,610.50 26,610.50 0.26% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0026 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0

1103(1) Lighting Fixtures 1.00 l.s. 162,894.51 162,894.51 1.58% 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0158 11-Jul-24 20-Jul-24 0 0 0 0 0 0 0 0 0 0

10,329,692.08 0.51% 9.82% 29.16% 27.87% 22.07% 10.56%


100.00%

TOTAL AMOUNT Php. 10,329,692.08 100.00%

SCHEDULED ACCOMPLISHMENT PERIODIC (%) 0.51% 9.82% 29.16% 27.87% 22.07% 10.56%
SCHEDULED ACCOMPLISHMENT CUMULATIVE (%) 0.51% 10.33% 39.50% 67.37% 89.44% 100.00%
SCHEDULED ACCOMPLISHMENT PERIODIC (PESOS) ₱52,972.80 ₱1,014,395.30 ₱3,012,637.93 ₱2,878,714.19 ₱2,279,810.60 ₱1,091,161.26
SCHEDULED ACCOMPLISHMENT CUMULATIVE (PESOS) ₱52,972.80 ₱1,067,368.10 ₱4,080,006.03 ₱6,958,720.22 ₱9,238,530.82 ₱10,329,692.08

PROJECT TITLE/LOCATION: PREPARED BY: CHECKED BY: REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:
X0AO

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 1
Region X 23KK0200 - Repair/Rehabilitation of Four
ENGR. ARLENE D. EMEMENCI ANN CLYDE A. GANANCIAL DONELL MARK F. BARANDA MARCELINO O. CABEGUIN JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R SET
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING (4) Classrooms, Dreamland ES, Gingoog 1