Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Activity Completion Report

(ACR)

RE: TECHNICAL
ASSISTANCE FOR LITERACY
STATUS.

Prepared By:
THUMBSEEN DELILAH C. GALBAN
Teacher I
Republic of the Philippines
Department of Education
Region VIII-Eastern Visayas
Schools Division of Calbayog City
Calbayog 1 District
PINAMUROTAN INTEGRATED SCHOOL
Brgy. Pinamorotan, Calbayog City

RE: TECHNICAL ASSISTANCE FOR LITERACY STATUS


ACTIVITY ACCOMPLISHMENT REPORT
ACTIVITY: RE: TECHNICAL ASSISTANCE FOR LITERACY
STATUS
DATE: March 11, 2024 @ 10:45am
VENUE: Pinamurotan Integrated School Ground
PARTICIPANTS: School Head, Teachers, Students.
DESCRIPTION: During this day the Literacy Coordinator conducted a
Literacy Test gathering data for the 3 rd Quarter and
formulated the consolidated results.
OBJECTIVES: 1. To know the level of literacy of the students.
2. To give assistance and knowledge to the students in
what level of literacy they are now.
3. To monitor the progress of the students who is part
of the conducting of literacy.

RESULTS: The identified objective and target of the activity was met.
The activity was done fruitfully and successfully.

PARTICIPANTS FEEDBACK: This kind of monitoring process both the teachers and
students benefits from it knowing their literacy status.

METHODOLOGY: Showcasing the interest of the student in the activity and


cooperation also of the parents in the community.

MANAGEMENT OF THE It was successfully achieved by the careful planning of the


ACTIVITY: Teaching Staff with the assistance of the acting school head
of Pinamurotan I/S.
LOGISTICS ARRANGEMENT: Proper coordination was observed with all the concerned
personnel for the successful conduct of the activity.

Prepared by:

THUMBSEEN DELILAH C. GALBAN


Teacher I/ LITERACY COORDINATOR
Noted:
HERMAN T. VERANO
School Head

DOCUMENTATIONS

You might also like