General Project Data Report

General Data
Project Title: UBI ETHANOL PLANT FACTORY-
UBI ETHANOL PLANT PROJECT Project File Name:
STAND..fiw
Designed By: MDCEO Date: March 09, 2023
Code Reference: SBC&NFPA Approving Agency:
Client Name: UNITED BITA INDUSTRIES Phone:
Address: DAMMAM 3rd INDUSTRIAL CITY City, State Zip Code:
Company Name: MDCEO Representative:
Company Address: City And State:
Phone:
Building Name: UBI ETHANOL PLANT PROJECT Building Owner: UNITED BITA INDUSTRIES
Contact at Building: Phone at Building:
Address Of Building: City, State Zip Code:

Project Data
Description Of Hazard: Light Hazard Hose System Type: Wet
Design Area Of Water Application: 1500 ft² Maximum Area Per Hose: 130 ft²
Default Hose K-Factor: 12.50 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 100.00 gpm Outside Hose Stream Allowance: 150.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm

Hose Specifications
Make: Model:
Size: 1.5'' Temperature Rating: 155 F

Water Supply Test Data


Source Of Information:
Test Hydrant ID: Date Of Test:

Hydrant Elevation: 0 ft Static Pressure: 0.00 psi


Test Flow Rate: 0.00 gpm Test Residual Pressure: 0.00 psi
Calculated System Flow Rate: 249.68 gpm Calculated Inflow Residual Pressure: 96.50 psi

Calculation Project Data


Calculation Mode: Demand
HMD Minimum Residual Pressure: 65.27 psi Minimum Desired Flow Density: 0.10 gpm/ft²
Number Of Active Nodes: 20
Number Of Active Pipes: 20 Number Of Inactive Pipes: 0
Number Of Active Hoses: 1 Number Of Inactive Hoses: 0

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 3

Fire Hose Input Data

Node Input Data


Hose KFactor Pressure Node Elev (ft) Fixed Flow
Area Group
Node Node Description (K) Estimate (psi) Branch Non- (gpm)
Branch Dia.
No. Branch Description Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(in)
(ft) Fittings (ft) KFactor (K)

Hose ---- 12.50 65.27 18.04 0.00


1
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 64.39 26.25 0.00


2
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 65.96 26.25 0.00


3
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 75.83 13.12 0.00


4
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 77.92 13.12 0.00


5
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 80.57 13.12 0.00


6
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 87.80 0.00 0.00


7
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.44 0.00 0.00


8
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.45 0.00 0.00


9
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.45 0.00 0.00


10
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.46 0.00 0.00


11
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.47 0.00 0.00


12
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.48 0.00 0.00


13
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.48 0.00 0.00


14
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.49 0.00 0.00


15
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.48 0.00 0.00


16
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.44 0.00 0.00


17
---- 0.000 0.0 ---- 0.0 0.00

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 4

Fire Hose Input Data

Node Input Data (cont'd)


Hose KFactor Pressure Node Elev (ft) Fixed Flow
Area Group
Node Node Description (K) Estimate (psi) Branch Non- (gpm)
Branch Dia.
No. Branch Description Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(in)
(ft) Fittings (ft) KFactor (K)

No Discharge ---- N/A 96.44 0.00 0.00


18
---- 0.000 0.0 ---- 0.0 0.00

Fixed ---- N/A 96.41 0.00 150.00


19
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 96.50 0.00 0.00


20
---- 0.000 0.0 ---- 0.0 0.00

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 5

Fire Hose Input Data

Pipe Input Data


Nominal Nominal Fitting Total CFactor
Beg. End. Type Fitting
Pipe Description Diameter Length Length Length (gpm/inch-
Node Node Group Data
(inch) (feet) (feet) (feet) psi)

1 2 SCHED 40 WET STEEL 1.500 0 8.20 0.00 8.20 120

2 3 SCHED 40 WET STEEL 1.500 0 4.92 0.00 4.92 120

3 4 SCHED 40 WET STEEL 1.500 0 13.12 0.00 13.12 120

4 5 SCHED 40 WET STEEL 1.500 0 6.56 0.00 6.56 120

5 6 SCHED 40 WET STEEL 2.000 0 27.89 0.00 27.89 120

6 7 SCHED 40 WET STEEL 2.000 0 16.40 0.00 16.40 120

7 8 SCHED 40 WET STEEL 2.000 0 91.86 0.00 91.86 120

8 9 SCHED 40 WET STEEL 10.000 0 3E 49.21 66.00 115.21 120

9 10 SCHED 40 WET STEEL 10.000 0 32.81 0.00 32.81 120

10 11 SCHED 40 WET STEEL 10.000 0 167.32 0.00 167.32 120

11 12 SCHED 40 WET STEEL 10.000 0 328.08 0.00 328.08 120

12 13 SCHED 40 WET STEEL 10.000 0 121.39 0.00 121.39 120

13 14 SCHED 40 WET STEEL 10.000 0 3E 65.62 66.00 131.62 120

14 15 SCHED 40 WET STEEL 10.000 0 98.43 0.00 98.43 120

15 16 SCHED 40 WET STEEL 10.000 0 104.99 0.00 104.99 120

16 17 SCHED 40 WET STEEL 10.000 0 426.51 0.00 426.51 120

17 18 SCHED 40 WET STEEL 10.000 0 26.25 0.00 26.25 120

18 19 SCHED 40 WET STEEL 6.000 0 26.25 0.00 26.25 120

18 8 SCHED 40 WET STEEL 10.000 0 108.27 0.00 108.27 120

15 20 SCHED 40 WET STEEL 10.000 0 32.81 0.00 32.81 120

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 6

Fire Hose Output Data

Overall Node Groupings Output Data


Pipe Segment Pipe Pipe Hose Flow Fixed Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out (+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure (psi) Node (gpm)

1 2 0 -101.41 100.98 0.00 0.00 65.27

2 1 0 101.41 0.00 0.00 0.00 64.39 1.00231


2 3 0 -100.41

3 2 0 100.41 0.00 0.00 0.00 65.96 0.15303


3 4 0 -100.25

4 3 0 100.25 0.00 0.00 0.00 75.83 0.18530


4 5 0 -100.07

5 4 0 100.07 0.00 0.00 0.00 77.92 -0.63695


5 6 0 -100.71

6 5 0 100.71 0.00 0.00 0.00 80.57 0.59381


6 7 0 -100.11

7 6 0 100.11 0.00 0.00 0.00 87.80 0.09226


7 8 0 -100.02

8 7 0 100.02 0.00 0.00 0.00 96.44 -0.38406


8 9 0 -105.42
8 18 0 5.01

9 8 0 105.42 0.00 0.00 0.00 96.45 -0.08704


9 10 0 -105.51

10 9 0 105.51 0.00 0.00 0.00 96.45 0.09940


10 11 0 -105.41

11 10 0 105.41 0.00 0.00 0.00 96.46 0.03972


11 12 0 -105.37

12 11 0 105.37 0.00 0.00 0.00 96.47 -0.06551


12 13 0 -105.43

13 12 0 105.43 0.00 0.00 0.00 96.48 0.00174


13 14 0 -105.43

14 13 0 105.43 0.00 0.00 0.00 96.48 -0.02215


14 15 0 -105.45

15 14 0 105.45 0.00 0.00 0.00 96.49 0.00712


15 16 0 144.24
15 20 0 -249.68

16 15 0 -144.24 0.00 0.00 0.00 96.48 -0.12383


16 17 0 144.11

17 16 0 -144.11 0.00 0.00 0.00 96.44 0.24327


17 18 0 144.36

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 7

Fire Hose Output Data

Overall Node Groupings Output Data (cont'd)


Pipe Segment Pipe Pipe Hose Flow Fixed Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out (+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure (psi) Node (gpm)

18 8 0 -5.01 0.00 0.00 0.00 96.44 -0.26162


18 17 0 -144.36
18 19 0 149.11

19 18 0 -149.11 0.00 150.00 0.00 96.41 0.88932

20 15 0 249.68 0.00 0.00 -249.68 96.50

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 8

Fire Hose Output Data

Overall Pipe Output Data


Nom. Dia. q (gpm) F. L./ft Pipe-Len.
Beg. Nodal Hose/Fix Residual PF-(psi)
Elevation Inside Dia. Q (gpm) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure PE-(psi)
(feet) C-Value Velocity Fittings Tot-Len.
Node (K) (gpm) (psi) PT-(psi)
(fps) Type-Grp (ft)

1 12.50 18.04 100.98 65.27 1.50 100.98 0.32579 8.20 2.672


2 0.00 26.25 0.00 64.39 1.610 101.41 ----- 0.00 -3.552
SCHED 40 WET STEEL 120 15.98 0 8.20 -0.879

2 0.00 26.25 0.00 64.39 1.50 0.00 0.31986 4.92 1.574


3 0.00 26.25 0.00 65.96 1.610 100.41 ----- 0.00 0.000
SCHED 40 WET STEEL 120 15.82 0 4.92 1.574

3 0.00 26.25 0.00 65.96 1.50 0.00 0.31896 13.12 4.186


4 0.00 13.12 0.00 75.83 1.610 100.25 ----- 0.00 5.682
SCHED 40 WET STEEL 120 15.80 0 13.12 9.868

4 0.00 13.12 0.00 75.83 1.50 0.00 0.31787 6.56 2.086


5 0.00 13.12 0.00 77.92 1.610 100.07 ----- 0.00 0.000
SCHED 40 WET STEEL 120 15.77 0 6.56 2.086

5 0.00 13.12 0.00 77.92 2.00 0.00 0.09525 27.89 2.656


6 0.00 13.12 0.00 80.57 2.067 100.71 ----- 0.00 0.000
SCHED 40 WET STEEL 120 9.63 0 27.89 2.656

6 0.00 13.12 0.00 80.57 2.00 0.00 0.09422 16.40 1.546


7 0.00 0.00 0.00 87.80 2.067 100.11 ----- 0.00 5.682
SCHED 40 WET STEEL 120 9.57 0 16.40 7.228

7 0.00 0.00 0.00 87.80 2.00 0.00 0.09406 91.86 8.640


8 0.00 0.00 0.00 96.44 2.067 100.02 ----- 0.00 0.000
SCHED 40 WET STEEL 120 9.56 0 91.86 8.640

18 0.00 0.00 0.00 96.44 10.00 5.01 0.00000 108.27 0.000


8 0.00 0.00 0.00 96.44 10.020 5.01 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.02 0 108.27 0.000

8 0.00 0.00 0.00 96.44 10.00 0.00 0.00005 49.21 0.005


9 0.00 0.00 0.00 96.45 10.020 105.42 3E 66.00 0.000
SCHED 40 WET STEEL 120 0.43 0 115.21 0.005

9 0.00 0.00 0.00 96.45 10.00 0.00 0.00005 32.81 0.002


10 0.00 0.00 0.00 96.45 10.020 105.51 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.43 0 32.81 0.002

10 0.00 0.00 0.00 96.45 10.00 0.00 0.00005 167.32 0.008


11 0.00 0.00 0.00 96.46 10.020 105.41 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.43 0 167.32 0.008

11 0.00 0.00 0.00 96.46 10.00 0.00 0.00005 328.08 0.016


12 0.00 0.00 0.00 96.47 10.020 105.37 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.43 0 328.08 0.016

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 9

Fire Hose Output Data

Overall Pipe Output Data (cont'd)


Nom. Dia. q (gpm) F. L./ft Pipe-Len.
Beg. Nodal Hose/Fix Residual PF-(psi)
Elevation Inside Dia. Q (gpm) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure PE-(psi)
(feet) C-Value Velocity Fittings Tot-Len.
Node (K) (gpm) (psi) PT-(psi)
(fps) Type-Grp (ft)

12 0.00 0.00 0.00 96.47 10.00 0.00 0.00005 121.39 0.006


13 0.00 0.00 0.00 96.48 10.020 105.43 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.43 0 121.39 0.006

13 0.00 0.00 0.00 96.48 10.00 0.00 0.00005 65.62 0.006


14 0.00 0.00 0.00 96.48 10.020 105.43 3E 66.00 0.000
SCHED 40 WET STEEL 120 0.43 0 131.62 0.006

14 0.00 0.00 0.00 96.48 10.00 0.00 0.00005 98.43 0.005


15 0.00 0.00 0.00 96.49 10.020 105.45 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.43 0 98.43 0.005

15 0.00 0.00 0.00 96.49 10.00 0.00 0.00008 104.99 0.009


16 0.00 0.00 0.00 96.48 10.020 144.24 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.59 0 104.99 0.009

16 0.00 0.00 0.00 96.48 10.00 0.00 0.00008 426.51 0.036


17 0.00 0.00 0.00 96.44 10.020 144.11 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.59 0 426.51 0.036

17 0.00 0.00 0.00 96.44 10.00 144.36 0.00009 26.25 0.002


18 0.00 0.00 0.00 96.44 10.020 144.36 ----- 0.00 0.000
SCHED 40 WET STEEL 120 0.59 0 26.25 0.002

18 0.00 0.00 0.00 96.44 6.00 150.00 0.00104 26.25 0.027


19 0.00 0.00 150.00 96.41 6.065 149.11 ----- 0.00 0.000
SCHED 40 WET STEEL 120 1.66 0 26.25 0.027

15 0.00 0.00 0.00 96.49 10.00 0.00 0.00023 32.81 0.008


20 0.00 0.00 0.00 96.50 10.020 249.68 ----- 0.00 0.000
SCHED 40 WET STEEL 120 1.02 0 32.81 0.008

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 10

Fire Hose Output Data

Overall Hose Output Data


Flowing Node Residual Flowing Hose
Area Group Hose Flowing Area
Hose Node Elevation Pressure Density Discharge
Code KFactor (K) (ft²)
No. (feet) (psi) (gpm/ft²) (gpm)

1 12.50 18.04 65.27 130.00 0.777 100.98


Sub Totals For Non-Group 130.00 0.777 100.98

Totals For All Groups 130.00 0.777 100.98

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 11

Fire Hose Output Summary

Hydraulically Most Demanding Hose Node


HMD Hose Node Number: 1
HMD Actual Residual Pressure: 65.27 psi
HMD Actual GPM: 100.98 gpm

Hose Summary
Hose System Type: Wet
Specified Area Of Application: 1500.00 ft²
Minimum Desired Density: 0.100 gpm/ft²
Application Average Density: 0.067 gpm/ft²
Application Average Area Per Hose: 1500.00 ft²
Hose Flow: 100.98 gpm
Average Hose Flow: 100.98 gpm

Flow Velocity And Imbalance Summary


Maximum Flow Velocity ( In Pipe 1 - 2 ) 15.98 ft/sec
Maximum Velocity Pressure ( In Pipe 1 - 2 ) 1.72 psi

Allowable Maximum Nodal Pressure Imbalance: 0.5000 psi


Actual Maximum Nodal Pressure Imbalance: 0.2810 psi
Actual Average Nodal Pressure Imbalance: 0.2020 psi
Actual Maximum Nodal Flow Imbalance: 1.0023 gpm
Actual Average Nodal Flow Imbalance: 0.2444 gpm

Overall Network Summary


Number Of Unique Pipe Sections: 20
Number Of Flowing Hoses: 1

Pipe System Water Volume: 6463.75 gal

Hose Flow: 100.98 gpm


Fixed Flow: 150.00 gpm

Minimum Required Residual Pressure At System Inflow


96.50 psi
Node:
Demand Flow At System Inflow Node: 249.68 gpm

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM


FIRE - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem UBI ETHANOL PLANT PROJECT
heaven Page 12

Fire Hose Output Data

Hydraulic Supply/Demand Graph

100 96

90

80

70
Pressure psi

60

50

40

30

20

10

0
1 2 3 4 5 6 7 8 9 10
Flowrate(x100) gpm

Demand Curve Data


Calculated Residual Pressure: 96.50 psi
Calculated Flow Rate: 249.68 gpm
Pressure Required For First Sprinkler Downstream From Inflow Node To Flow: 7.81 psi

D:\ELIT FILE\ELITE FILES\UBI ETHANOL PLANT FACTORY-STANDPIPE.fiw 09 March 2023, 10:57 AM