Professional Documents
Culture Documents
RKD ZZ ZZ DR A 1004 Existing Site Plan Land Ownership
RKD ZZ ZZ DR A 1004 Existing Site Plan Land Ownership
Ga
CL 5.08 5.05
A0
7.55
Pillar preference over scaled dimensions.
5.1
e
5.75 Any errors or descrepancies to be
2
EV
5.
W
PAR 7.01 reported to the Architects.This
15
al
18.38 14.03
5.
l
6.28 drawing may not be edited or
04
4. .11
6.32
99
5.16 modified by the recipient.
5
5.1
5. BD
4. .94
16 EV
G
4
EV
98
at 5
4
11.59 Copyright and ownership of this drawing is vested in RKD
e .1
13.95
V V
PAR Architects, whose prior written consent is required for its
4.96 12.72
6
5.08 use, reproduction or for publication to any third party. All
Ave
TOT
5.
6.34 7.49 PAR rights reserved by the law of copyright and by international
17
12.71 copyright conventions are reserved to RKD Architects and
9.72 V
7.43 PAR
5.18 12.71 may be protected by court proceedings for damages and/or
5.
7.02
5.
05
Te
injunctions and costs.
19
2
Bu
ing
APX
5.2
5.
5.74 RKD Architects' Quality Management Systems are certified
ild
po
9
19
12.61
ng
ild
5.9
in
PAR TOT
ra
APX to ISO 9001:2015.
9
Bu
g
ildi
ing
5.74
ry 5.1
5.9
18.31 V
16.60
fe 8
4.97
5. 1 3
Bu
rfall
ild
5. Notes:
nc
01
9.89 11
5.
Bu
PAR EV
e
18.23
4.
13.99
Fe
Ga
96
PAR 4. 7.505 te APX
nc
7.02
18.36 5. 98 4.98 .1 EV
e
5.74 10 5. 7 13.64
GY 07 7.45 11.54
5.
EBOX
16
PAR TOT EV PAR N
18.31 5 5.17 14.05 12.56
4. 4. .11
Wate
IC
96 5 5.10
V
9 R
PAR 9.50 5. 9 .0 CL 5.15 oof/ Ga
11
G
18.25PAR 5. MH 4. 8 Ov te Bu
at
15 99 erh 8 ildi
CL 5.10
e
18.40 EV APX ng
7.00 an .54 EV
g 11.49 14.44
5.73 EV 14.06
W 5 .0
Wall61
5. APX PAR All levels shown are to the irish Transverse
5.27
al 5. 02 9 11.54 PAR
5.
l 5. 14 5. 14.81 12.55
14.86 Mercator (ITM) and are displayed in meters (m).
16 4. 04 6.53
eline
5. 97
TOT 5.1 02 5.4 EV All levels shown relate to the main head datum
5 1 11.73
entr
LP
6
5.3 DoorEV
5.5
All dimensions shown are in millimeters
5.39
5.39
ng
4
dC
9.69 5.0
7.00 11.69
ildi
5.1 1 APX
5.49
5. SV
Roa
20 5.15 4 EV 14.81
Bu
5. 5.50
5.72 5.3 11.68
7.02 CL 5.15 4.9 12
9
CL 5.09
Top
8
5.4
5.73 MH MH 7
EP 4.92 V
5.16
Kerb
TOT 5. WM 4.9 5.3 Bu LEGEND
PAR 19 LP 4 2 5.0 7 ildi
9.87 5.09 WM .97 5 ng 5.31 5.3
5.33
18.27 01 5.08 5.0 5.2 Pole 4
PAR 7. .73 5.05 EV PAR
5. 41
18.38 55. 5
5.30 Overhead Wires 14.84 SITE DEVELOPMENT
13 STN 5.0 11.86
AREA
5.50
5.3
5.27
395 7.39 PAR
5.30
gsii2 5.15
V
5.38 0
PAR TOT Pilla r 5.1 55..2 5.32 15.27 (Total Area = 0.6067 ha)
18.30 .24
5EV
9.66 7.20
5. 30
E 716572.938 4.9 4
0
5.16 7.42 PAR
5.0
N 736517.429 5.0 3 11.81 6.24 14.85
PAR 5.31 SITE APPLICATION
18.31 PAR
ll
H 5.032 MH PAR
Wa
line
18.38 5.0 4.9 PAR AREA
2
15.35
5.0
MH 2 5.07 5.25 CL 5.25
Wall
26
7 5.1 14.84
ntre
IC (Total Area = 0.6829 ha)
4.9 1
5.1 6 5.
CL 4.88 5.17 CL 5.12 5.19
5.48
2 5.30 PAR
d Ce
5.0 V
CL 5.24 15.36
5.1
4.98
9
7.21 7 5.
2
5.16 5
4.9 09
4.9
5.4
Sign
V
MH
Roa
5.07 0 5.18 ROAD WORKS IN
7.21 V
5.46
5.04
5.16
5.17 a d 0
4 .9
IC Sc TOT
ar MH 5.1 EP ROADWORKS IN
8
CL 5.06 3 5.2
5.0
03
5.17
g
5. 5.19 APPLICANT
5.07
8
CL 4.90
4.95
ldin
0
5.
5.1
0
7.23 15.05 APX OWNERSHIP TO BE
4.94 7
Bui
4.99 5.15
5.14
rbed 4.9 5. V
5.08 6.28 14.35
STN 5.01 Flowe MH 5.1 00 TAKEN IN CHANRGE BY
5.
Pole 5.04 9 5
all
4
1
4.97 5.0 CL 5.09 LOCAL AUTHORITY
Pilla
5.7.81
s3 E 716566.540
4
5.14 5.14 5.13 PAR
W
Gate 5 .0 5.13
6
Pole Bui
6 ldin 14.85
9
(Total Area = 0.0161 ha)
7.70
6.93 APX
r
4.99 N 736507.436 WM 5.02 6.18
g
5.0
ll BD 14.44
4.8
4.86
H 4.966 4.83 4.82 Wa 05.02 5.1 5.09 V V EV
9
V V
4.97 LAND UNDER THE
5.04
4.95 5.08 Ro 4.9 V V
5.13 10.90
7.114.8 4.69 5.0 5. 13
V
5.0
5.10
2 5.72 CL 4.98 5. ad 6 1 5.03 6.16 OWNERSHIP OF THE
0 5.0 Sc a 4.9 5.14
Flo
MH 2 7 5.08 r 5 .0 4.9 6
5.14
Gate TOT 4.95 E 5 .0 6 5.72 7 5.0 5. APPLICANT
wer 5.08
7.22 6.91 71 0 5.12
04
N 65 Kerb 5.04 6.10
9.17 5.0
bed
8
5.
STN H 7365 6.56 5.0 Top 5.0 5.08
5.04
PAR PAR 4.89 4.97 s2 5 .01 02.0 6 5.0 HE 7 5 LP 5 5.0 0
13.03 IC 4.71 .0 9 5.08 5.04
5.0
18.28 8 03 5 DG .15
04
7
E
5.1
5.02 5.06 94 2 6.18
5.
7.16 CL 4.97 5.07 5.10
8
4.79 4.87 6. 5.7 5.14 BD 5.05
6
4.68 5.1 4.93
5.04
4.80 4.7 Bui EV
4.8
5.18
4. 6
PAR 44.8.490. ld
6 7 5.07 5.09 Ga rbed 188 ing 11.07
PAR GY Flowe 5.16 RS HY 5.02 7.04
4.72
11.69 te 5.01
4
ESB
17.70 5.005.05 4.80 4.53 5.08 4.9 4.8
4
5.01
7
Box 4.56 4.52 5
4.4
BD
5.01
4. 6.26 5.11 TOT CON Ker
07
PAR 50 Fe EV 5.0
4.58 4.95 bT 5.01
Fe
4.48 5.11 C
5.
PAR 18.38 nc 4.39 12 5.105.33 5 RET Ker op
4. E
nc
96
17.71 78 e .21 6.31 5.11 18.93 bB 4.87
4.51 otto
6.
e
IC 5 5.10 GRASS/ W a SOIL4.95 m
PAR 6.89 CL 4.50 .16 5.13 ll
all
GY 4.42 5.11 5.03 TOT 4.7
18.31 VEGETATION
52
W
PAR 4.36 4.28 LP 4.8 6
5.09 Roa
9
4.47
4.
5.16 5.36 4.9
Road Scar
18.25 17.27 4.94 7
4.3
5.02
APX 7.74 5 4.8 dC
6.30 4.9 ent
EXISTING WALL GY 15.48 4.40 5.08 5.43 6 1 relin 4.9
5.04 4.47 4.35 e
4.59
PAR 6.50 GY E 5.17 1
ON DEAKIN HEDG
06
Ga
Ric
5.0
BD 2 Ker
COURT LANDS te bB
64
5.38 otto
Ker m
2
4.
bT
hm
4 .4
4.36 APX 4.34 EV op 4.8
GY 12.23 1
00
15.51 PAR6 G 4.87 4.86
ond
14
5.
6.81 .79 ate 6.82 4.93
5.
6.14 7.28
Pillar
BD
4.36 EV 6.
8
Roa
5.07 APX
5.03
4.39 0
4.35
4. IC 12.20 PAR Wa
EV 50 CL 15.55 6.82 Fen ll 4.89
7.61 C ce 4.8
GY 4.3 O 4.23 7
6 NCR
d
5.03 4.38 4.66
4.
5.07
GY ET 4.3
30
E 4.86
5. .03
4.33
4.99 0 EV APX
APX
5
Bu
4. ild
BD 28 ing 4.10
5.04
5.00
GRAVEL APX PAR
8.39 6.64
5.03 PAR EV EV 6.91 4.76
04
24
EXISTING FLOOD 7.16 EV 4.02
44
APX
4.
5.96.96
4.
EP 4.2 3 6.87
06 5.0
4.32
6.89 APX 4.70
6.98 9
Pillar
Bu 9.36
Wa
03
3.92
Lan4.15
ild
5.
5.
43
ll
in
g 4.31
dD
4.
4. 0
43
m 4.3
e
nc
19
5.05 Bu
4.
4.26 3.94
rain
PAR
Fe
6.03
tto p
ild
PAR EV 33
Bo To
7.07 in 4.27
4.
4.3
12.99 6.10 g
4.39 7.48
rb rb
4.64
05
Ke Ke
ing
4
5.
G 4.20 B
in
14
at
ild
32
4
e 6.25 3.97
4.
Bu
4.99
4.3
s6 4. 5.55
GY 39 6.73
4.
4.31
16
4.28
4.17
5.05
E 716536.677 4.
4.
4.
Bu
26 3.90
37
PAR 37 4.67
Roa
N 736475.839
ild
6.20
T re
11.94 2
ing
6.10
4.
PAR
4.57 5.05H 5.070 6.69 4.3
eL
27
6.25
4.2
Sca
4.68
ine
g 49 py
5.0
4.38
7.01 uil Ca 4.54
4.27
5
PAR
4.
TOT 5.05 B 4.22
6.30 ing 4.39
32
4.66
4.40 PAR ild
4.32
LP 6.50 4.21 Bu 6.88
13.93 4.24 4.24
5.0
4.75
PAR
7
4.
PAR EV
4 .8
14
6.27 7.80
g
2 3.86
an
0
EV 4.27 4.2
rh
4.47
4.21
ve
4.90 7.46
/O
4.51
7.3
Ro 2
of
9.
4.9
4.37 74
9.
TOT
4
EXISTING 4.22
0
4.
8.9
4.43
32
RIVER WALL 4.88 19.97
06
4.29 4.01
7.9
PAR 4.11
5.
9.58 APX
3
4.4
4.45 9.61
9.6
.07
Ro
4.26 4.59
8
3
o
6. 0
7.9
3.89
f/O
4.43
4.48 4.61
7
4.08
ve
7.6
4.
Ro
28
rh
3.82
3
o
an
f/O
8.9
g
6. 9
ve
ing
5
0
5
PAR 4.44
rh
4. 1
4.4
ild
4.3
PAR
4.24
an
11.83 STN IC EV 7
5.00 12.89
Bu
g
9
4.
4
4.87
7.4
80
gsii1
6. 0
4.79 N 736459.684 4.39 4 4.56
GY EV
7
4.83 EV 4.13
4.44 H 4.433 4.26 11.16 5.6
0
4.85
7.23
4.5
4.
3
54
3
5.8
5.6
4.85
TOT 4.41 3
3
7
4.4
4.39
5.6
19.35 4.1
9
5. 5
4.50
EV 3.81 7
Tre
4.
PAR 4.39 7.80 3.69
50
8.20 4.19
e
4.50
Lin
4.42
4.9
0
e
4.18 12.05
of/ 0
0
4.40
4.9
4.7
Ov
8
erh
7
TOT
1
6 .6
6.1
an
4.59 4.56
Sl
4.5
9 4.03
g
op
0
e
4.15 4.02
10.36 3.74
p
4 EV
4.4
La .30
4.1
4
Bu
11.38
nd
4.3 8
8
4.57 4.47
ild
2 .52
3.99
Dr
SITE 3.99
ing
4.38
ain
8.6 of/O
4.46
4.6
BOUNDARY 4.58
Ro
1
PAR
8
5.0
ST
TOT
8.5 ang
ve
RS
4.4
4.32 EV 4
ee
4.5
6.90 4.31 7.91
Lin
4
19.50 CONTAINERS 4.53 EXISTING TELECOMS 4.54
5.0
ESB Box 4.03
e
4.5
4.21 4.05
4.72 TOWER TO BE RE-LOCATED
53
4
TOT Fence 4.00 4.41
3.76
5.
TO ROOF 4.38
LEVEL OF 4.22
4.4
ISM TELECOMMUNICATIONS 4.28 din
4.7
7
2
4.5
4.70 4.46
0
6.86
4.61
4.33 4.21
8.6
TOT 4.46
4.46
19.84
0R
4.5
oo
IC
2
4.6 4.46 4.51
5.9
f/O
4.46
0 4.22
6.89 4.43 10
ve
22.19
4.43
4.51 EV .07 4.46
rh
4.22 3. 4 6. 3
a
11.27 4.42
4.46
ng
2 7
8.6
TOT
4.45 Wall
4.65 6.0 4.41 4.50
4
6.3
0
1
20.93 4.18 GY
4.67 4.26 3.39
To
4.27 4.15 4.28
4.46
4.5 4.52 4.50
2 4.16
4.1 Drain
4.
4.46
lka
4.45
64
6.70 4 TOT 3.50
4
.50 4.24
d
4.46
.6 X
La n
12 PE
14.41
8
4.4 4.55 3.5
A
0 4.30
2
Ri TOT 4.24
4.29 EV
11.37
4.43 3.51
ve 4.
40
13.51 4.22 4.49 4.51
3.47
9.82
4.25 4.37
Roof/Overhang
4.48
3.49 Bu
r
3.41 3.58 ild
4.48 i ng
TOT 4.23 3.41
7. 4
4.29 4.34
19.3
9.82
15.32
7
46
4. 4.35
3.48 3. 4
4.37
4.21 2
4.32
4.29
SITE 3. 3.57
90 4.29 3.38
4.32 3.40
BOUNDARY 4.21 4.36 ESB Box
TO RIVER 4.0
0 3.45
8.59
3.56 3.45
4.
49
4.19
6
Roof/Overhang
3.7 4.34
8 3.46
3.47 3.33
4.26
3.59
4.18
4.02 4.40 4.26 4.34
3. 4
3.30 8
Bu 6.
1
08
8.62
ild
4.2
ing 3.51
4.1
op
6.0
4.1 3.26
4 4.35 3.54
3.58 3.53 3.51
4.35
3.52
3. 5
7
4.37
0
GY
3.9
3.67
EV APX EV
15
4.16
STN 4.19
EXISITNG RIVER WALL
4.10 s5 3.53
E 716612.160 3.54
N 736399.470 4.18 3.57 3.29 3.87
H 4.143
6.60
STATUS
4.04
PLANNING
6
3.55
3.6
CONTAINER 9.7
3.60 3.57 3
PROJECT RICHMOND ROAD
4.08
4.18
3.37
4.08
3.68
6
3.6
4.01
PROJECT No. 146A and Nos. 148-148A
3.61 APEX ADDRESS
6.58 19.00 Richmond Road, Dublin 3
3.64 3.65
EXISTING OPW DWG TITLE EXISTING SITE PLAN -
FLOOD DEFENSE LAND OWNERSHIP
1004_ Existing Site Plan - Land Ownership GA WALL Fe
nc 3.38 3.50
1 e DWG NO.
20199-RKD-ZZ-ZZ-DR-A-1004
Wall
1 : 200 4.1
3
4.14 3.72
0
3.84 DATE DEC 2021 DRN ROC CHK HB
3.83
3.79
3.81
59 Northumberland Rd +353 1 668 1055
Ballsbridge, Dublin 4 mail@rkd.ie
D04 WP89, Ireland rkd.ie