Professional Documents
Culture Documents
RKD ZZ ZZ DR A 1001 Existing Site Plan
RKD ZZ ZZ DR A 1001 Existing Site Plan
4.92
Ga
CL 5.08 5.05 14.26 site. Figured dimensions take
7.55
A0
Pillar
t
preference over scaled dimensions.
5.1
e
Any errors or descrepancies to be
2
5.75
EV
5.
W
PAR 7.01 reported to the Architects.This
15
al
18.38 14.03
5.
l
6.28 drawing may not be edited or
04
4. .11
6.32
99
5.16 modified by the recipient.
5
5.1
5. BD
4. .94
16 EV
G
4
EV
98
at 5
4
11.59 Copyright and ownership of this drawing is vested in RKD
e .1
13.95
V V
PAR Architects, whose prior written consent is required for its
4.96 12.72
6
5.08 use, reproduction or for publication to any third party. All
Ave
TOT
5.
6.34 7.49 PAR rights reserved by the law of copyright and by international
17
12.71 copyright conventions are reserved to RKD Architects and
9.72 V
7.43 PAR
5.18 12.71 may be protected by court proceedings for damages and/or
5.
7.02
5.
05
Te
injunctions and costs.
19
Bu
ing
APX
5.2
5.
5.74
ild RKD Architects' Quality Management Systems are certified
po
9
19
12.61
ng
ild
5.9
in
PAR TOT
ra
APX to ISO 9001:2015.
9
g
Bu
ing
ildi
5.74
ry 5.1
5.9
18.31 V
16.60
fe 8
4.97
5. 1 3
Bu
rfall
ild
5. Notes:
nc
01
9.89 11
5.
Bu
PAR EV
e
18.23
4.
13.99
Fe
Ga
96
PAR 4. 7.505 te APX
nc
7.02
18.36 5. 98 4.98 .1 EV
e
5.74 10 GY 5. 7 13.64
07 7.45 11.54
5.
EBOX
16
PAR TOT EV PAR
18.31 5 5.17 14.05 12.56
4. 4. .11
Wate
IC N
96 5 5.10
V
9 R
PAR 9.50 5. 9 .0 CL 5.15 oof/ Ga
11
G
18.25PAR 5. MH 4. 8 Ov te Bu
at
15 99 erh 8 ildi
e
18.40 CL 5.10 EV APX ng
7.00 an .54 EV
g 11.49 14.44
5.73 EV 14.06
W 5 .0
Wall61
5. APX PAR
5.27
al 5. 02 9 11.54 PAR
5.
l 5. 14 5. 14.81 12.55
14.86
16 4. 04 6.53
eline
5. 97
5.1 02
TOT EV All levels shown are to the irish Transverse
5.4 Mercator (ITM) and are displayed in meters (m).
5 1 11.73
entr
LP
6
5.3 DoorEV
5.5
5.39
5.39
ng
4 All levels shown relate to the main head datum
dC
9.69 5.0
7.00 11.69
ildi
5.1 1 APX
5.49
5.
Roa
SV
20 5.15 4 EV 14.81 All dimensions shown are in millimeters
Bu
5. 5.50
5.72 5.3 11.68
7.02 CL 5.15 4.9 12
9
CL 5.09
Top
8
5.4
5.73 MH MH 7
EP 4.92 V
5.16
Kerb
5. WM 4.9 5.3 Bu
TOT 19 4.9 2 5.0 7 ildi SITE APPLICATION
PAR 9.87 ng 5.31
7 5 5.3 AREA
5.33
18.27 01 5.0 5.2 Pole 4
PAR 7. .73 5.05 EV PAR
5. 41
18.38 55. 5
5.30 Overhead Wires 14.84
13 5.0 11.86
5.50
5.3
5.27
9 7.39 PAR ROAD WORKS IN
5.30
0
5.15 55.3.25
V
5. 30
4.9 4
0
7.42 PAR
5.0
5.0 3 11.81 6.24 14.85
PAR 5.31
18.31PAR
ll
MH PAR LAND TO BE TAKEN IN
Wa
line
EXISTING ESB 18.38 5.0 4.9 PAR
2
5.25 CL 5.25 15.35
5.0
MH 2
26
Wall
7 5.1 14.84 CHARGE
ntre
SUB STATION IC
4.9 1
5.1 6 5.
CL 4.88 CL 5.12 5.19
5.48
2 5.30 PAR
d Ce
5.0 V
15.36
CL 5.24 ADJACENT LAND UNDER
5.1
4.98
9
7.21 7 5.
2
5
4.9 09
4.9
5.4
Sign
V
MH
Roa
5.07 0 5.18 THE OWNERSHIP OF
7.21 V
5.46
5.04 DEMOLITIONS
5.16
a d 0
4 .9
IC Sc TOT
ar MH 5.1 EP
8
CL 5.06 3 5.2 BUILDING NO. BUILDING FLOOR AREA
5.0
03
g
5.
5.07
8
CL 4.90
4.95
ldin
0
5.
5.1 TO BE DEMOLISHED
0
7.23 15.05 APX
4.94 7
Bui
4.99 4.9 5. V
5.08 6.28 14.35 1 621.62m2
STN 5.01 MH 5.1 00
5.
Pole 5.04 9 5
all
4
1
4.97 5.0 CL 5.09
Pilla
2 221.35m2
5.7.81
4
s3 E 716566.540 5.14 5.13 PAR
W
Gate 5 .0 5.13
6
Pole 6 Bui 14.85
9
ldin
7.70
6.93 APX 3 115.30m2
r
4.99 N 736507.436 5.02 6.18
g
5.0
ll 14.44
4.8
4.86
H 4.966 4.83 4.82 Wa 5.02 5.09 V V EV 4 148.73m2
9
V V
4.97
5.04
4.95 7.114.8 4.69 4.9 V V
5.13 10.90 5 49.52m2
5.72 CL 4.98 5. 5.0 5.0 1
V
5.03 6.16
2 02 6 4.9 5.14
MH 5 .0 4.9 6 6 301.66m2
5.14
Gate TOT 4.95 5.0
7.22 6.91 E 5 .0 6 7 5.0 5.12
N 7165 7 838.37m2
04
Kerb 5.04 6.10
9.17 8 5.0
5.
STN H 7365 6.56 T op 5.0 5.08 8 28.44m2
5.04
PAR PAR 4.89 4.97 s2 5. 0 02 6 5.0 HE LP 5 5.0 0
18.28 13.03 IC 4.71 18 .003 5 DG .15 1030 5.04
04
E 9 14.70m2
5.02 6 6.18
5.
7.16 CL 4.97 5.0 5.07 5.10
4.79 4.87 5.05 TOTAL 2345.55m2
BD
6
4.68 5.1 4.93 Bui
5.04
4.80 4.7 EV
4.8
44.8.490.
4. 6
PAR 6 7 5.07 5.09 rbed 188 ld ing 11.07
PAR GY Flowe 5.16 RS HY 5.02 7.04
4.72
11.69 5.01
4
ESB
17.70 5.005.05 4.80 4.53 5.08 4.9 4.8
4
5.01
1
7
Box 4.56 4.52 5
4.4
BD
5.01
4. 6.26 5.11 TOT CON Ker
07
PAR 50 Fe E 5.0
EXISTING WALL 4.58 4.95 bT 5.01
Fe
12 V 5.11 C
5.
PAR 18.38 nc 4.39 4.48 5.105.33 5 RET Ker op
4. E
nc
96
17.71 78 e .21 6.31 5.11 18.93 bB 4.87
ON DEAKIN 4.51 otto
6.
e
5.10 GRASS/ Wall SOIL4.95 m
PAR 6.89 CL 4.50 IC GY 5.1 5.13
all
COURT LANDS 18.31 4.42 6 5.11 VEGETATION 5.03 TOT 4.7
52
W
PAR 4.36 4.28 LP 4.8 6
5.09 Roa
9
4.47
4.
5.16 5.36 4.9
Road Scar
18.25 17.27 4.94 7
4.3
5.02
APX 7.74 5 4.8 dC
GY 15.48 6.30 4.40 6 4.9 ent
5.08 5.43 1 relin 4.9
5.04 4.47 4.35 e
4.59
PAR 6.50 GY E 5.17 1
HEDG
06
Ga
Ric
5.0
BD 2 Ker
te bB
1031
64
5.38 otto
Ker m
4.
2
bT
hm
4 .4
4.36 APX 4.34 EV op 4.8
GY 12.23 1
00
15.51 PAR6 G 4.87 4
4.93 .86
ond
14
5.
6.81 .79 ate 6.82
3
5.
3 6.14 7.28
Pillar
BD
4.36 EV 6.
8
Roa
5.07 APX
5.03
4.39 0
4.35
4. IC 12.20 PAR Wa
EV 50 CL 15.55 6.82 Fen ll 4.89
ce
GY 7.61 4.3 CON 4.23 4.8
7
d
5.03 4.38 6 CR 4.66
4.
5.07
GY ET 4.3
30
E 4.86
5. .03
4.33
4.99 0 EV APX
APX
5
Bu
4. ild
BD 28 ing 4.10
5.04
5.00
GRAVEL APX PAR
8.39 6.64
PAR EV EV 6.91 4.76
EXISTING FLOOD 5.03
04
24
7.16 EV 4.02
44
APX
4.
5.96.96
4.
8.40 EV 3.97 4.18
Door
3
EP 4.2 3 6.87
06 5.0
4.32
6.89 APX 4.70
6.98 9
Pillar
9.36
5
Bu
Wa
03
3.92
Lan4.15
ild
5.
5.
43
ll
in
g 4.31
dD
4.
4. 0
43
m 4.3
e
nc
19
5.05 Bu
4.
4.26 3.94
rain
PAR
Fe
6.03
tto p
ild
PAR EV 7.07 33
Bo To
1 in 4.27
4.
4.3
12.99 7.48 6.10 g
rb rb
4.64
05
4.39
Ke Ke
ing
4
5.
G 4.20
in
14
at
ild
32
4
e 6.25 3.97
4.
Bu
4.99
4.3
s6 4. 5.55
GY 39 6.73
4.
4.31
16
4.28
4.17
5.05
E 716536.677 4.
4.
4.
Bu
26 3.90
37
PAR 37 4.67
Roa
N 736475.839
ild
6.20
T re
11.94 2
ing
4.
PAR 6.10
4.57 5.05H 5.070 6.69 4.3
eL
d
7
27
6.25
4.2
Sca
4.68
ine
49 py
9
g
5.0
6.12
r
PAR din 6. no 4.02 4.38
7.01 uil a 4.54
4.27
5
PAR C
4.
TOT 5.05 B 4.22
6.30 ing 4.39
32
4.66
4.40 PAR ild
4.32
LP 6.50 4.21 Bu 6.88
13.93 4.24 4.24
5.0
4.75
PAR
7
4.
PAR EV
4 .8
14
6.27 7.80
g
2 3.86
an
0
EV 4.27
4 4.2
rh
4.47
4.21
ve
4.90 7.46
/O
EXISTING 4.51
7.3
Ro 2
9.
of
4.9
4.37 74
9.
4.22
0
4.
8.9
1031 4.43
32
4.88 19.97
06
4.29 4.01
7.9
PAR 4.11
5.
9.58 APX
3
4.4
4.45 9.61
9.6
.07
Ro
4 4.26 4.59
8
3
o
6. 0
7.9
f/O
3.89
4.43
4.
Ro
28
rh
3.82
3
o
an
f/O
8.9
g
6. 9
ve
ing
5
0
5
PAR 4.44
rh
4. 1
4.4
ild
4.3
PAR
4.24
an
11.83 STN IC EV 7
5.00 12.89
Bu
g
9
4.
4
7.4
80
gsii1
6. 0
4.79 N 736459.684 4.39 4 4.56
GY EV
7
4.83 EV 4.13
4.44 H 4.433 4.26 11.16 5.6
0
4.85
7.23
4.5
4.
3
54
3
5.8
5.6
6
4.85
TOT 4.41 3
3
7
4.4
4.39
5.6
19.35 4.1
9
5. 5
4.50
EV 3.81 7
Tre
4.
PAR 4.39 7.80 3.69
50
8.20 4.19
e
4.50
Lin
4.42
4.9
0
e
4.18 12.05
2
of/ 0
0
4.40
4.9
4.7
Ov
8
erh
7
TOT
1
6 .6
6.1
an
4.59 4.56
Sl
4.5
9 4.03
g
op
0
e
4.15 4.02
10.36 3.74
p
4 EV
4.4
La .30
4.1
4
Bu
11.38
nd
4.3 8
8
4.57 4.47
ild
2 .52
3.99
Dr
3.99
ing
4.38
ain
8.6 of/O
4.46
4.6
4.58
Ro
1
PAR
8
5.0
ST
SITE
6
TOT
8.5 ang
ve
RS
BOUNDARY
Tr
4.4
4.32 EV 4
ee
4.5
TO RIVER 6.90 4.31 7.91
4
Lin
5.0
ESB Box 4.03
e
4.5
4.21 4.05
4.72 TOWER TO BE RE-LOCATED
53
4
TOT Fence 4.00 4.41
3.76
5.
TO ROOF 4.38
LEVEL OF 4.22
4.4
4.28 din
4.7
7
2
4.5
4.70 4.46
0
6.86
4.61
4.33 4.21
8.6
TOT 5 4.46
4.46
19.84
0R
4.5
oo
IC
2
4.6 4.46 4.51
5.9
f/O
4.46
0 4.22
6.89 4.43 10
ve
22.19
4.43
4.51 1031 EV .07 4.46
rh
4.22 3. 4 6. 3
a
11.27 4.42
4.46
ng
2 7
8.6
TOT
4.45 Wall
4.65 6.0 4.41 4.50
4
6.3
0
1
20.93 4.18 GY
4.67 4.26 3.39
To
4.27 4.15 4.28
4.46
4.5 4.52 4.50
2 4.16
4.1 Drain
4.
4.46
lka
4.45
64
6.70 4 TOT 3.50
4
.50 4.24
d
4.46
.6 X
La n
12 PE
14.41
8
4.4 4.55 3.5
A
0 4.30
2
Ri TOT 4.24
4.29 EV
11.37
4.43 3.51
ve 4.
40
13.51 4.22 4.49 4.51
3.47
9.82
4.25 4.37
Roof/Overhang
4.48
3.49 Bu
r
3.41 3.58 ild
4.48 i ng
TOT 4.23 3.41
7. 4
4.29 4.34
19.3
9.82
15.32
7
46
4. 4.35
3.48 3. 4
4.37
4.21 4.32
2
4.29
SITE
EXISITNG 3. 3.57
90 4.29 3.38
4.32 3.40
TOP OF
BOUNDARY 4.21 4.36 ESB Box
RIVER
TO RIVER
BANK 4.0
0 3.45
8.59
3.56 3.45
4.
49
4.19 3.3
6
Roof/Overhang
3.7 4.34
8 3.46
3.59 3.47 3.33
4.26
1030 4.18
4.02 4.40 4.26 4.34
3. 4
3.30 8
Bu 6.
1
08
8.62
ild
4.2
ing 3.51
4.1
op
6.0
4.1 3.26
4 4.35 3.54
3.58 3.53 3.51
4.35
3.52
3. 5
7
4.37
0
GY
3.9
3.67
EV APX EV
15
4.16
STN 4.19
EXISITNG RIVER WALL
4.10 s5 3.53
E 716612.160 3.54
N 736399.470 4.18 3.57 3.29 3.87
H 4.143
6.60
STATUS
4.04
PLANNING
6
3.55
3.6
CONTAINER 9.7
3.60 3.57 3
PROJECT RICHMOND ROAD
4.08
4.18
3.37
4.08
3.68
6
3.6
4.01 APEX
PROJECT No. 146A and Nos. 148-148A
3.61 ADDRESS
6.58 19.00 Richmond Road, Dublin 3
3.64 3.65
EXISTING OPW DWG TITLE EXISTING SITE PLAN
FLOOD DEFENSE
WALL Fe 3.50
nc 3.38
e DWG NO.
20199-RKD-ZZ-ZZ-DR-A-1001
Wall
P2
STATUS PROJECT NO.
SCALE As indicated
20199
4.00
0
3.84 DATE DEC 2021 DRN CT CHK AM
3.83
3.79
3.81