Professional Documents
Culture Documents
B A D C E F G H I: Second Floor Plan
B A D C E F G H I: Second Floor Plan
A B C D E F G H I
38.05
1 1
ROTAVAP
PAVATOR
14 20 21 32 1.30 1.30
08
2.15
PWD
2.60
SHOWER REWOHS
AUTOCLAVE
EVALCOTUA
13 19 22 31
± 4.01 SQM
FEMALE CR 07
SAFETY CAB
BAC YTEFAS
LANDING RAMP DN
± 12.75 SQM @ 0.050m
12 18 23 30
GAS GAS GAS
INCUBATOR
ROTABUCNI
11 06 1.15 1.10 1.10 1.15
IS LABORATORY
1.20
12 10 BIOLOGY LABORATORY BIOLOGY LABORATORY
17 ± 75.00 SQM
STEP DN
11 24 29
@ 0.050m
13 09
05 7.00x7.50m 7.00x7.50m
6.75
DISTILLER
RELLITSID
14 08
± 52.50 SQM ± 52.50 SQM
FUME HOOD
DOOH EMUF
15 07 10 16 25 28
3.00
16 06 04 04 04
17 05
09 15 26 27
1.05
1.05
18 04
19 03 03
MALE CR
3.55
FREEZER
REZEERF
20 02 INSTRUCTOR INSTRUCTOR
± 12.23 SQM
21 01
12.50
02
STEP DN
STAIRS DN 22
12.00
@ 0.050m
0.95
0.80
0.80
01
0.05 0.05 0.05 0.05
2 2
41 STEP UP STEP UP STEP UP STEP UP STEP UP
@ 0.050m @ 0.050m @ 0.050m @ 0.050m @ 0.050m
STEP UP STEP UP
@ 0.050m @ 0.050m
EXTRUDED WALL
@ 0.050m
2" x 4" Metal top tail
painted finish
3.60
3.60
2" x 2" metal tubes
vertical support
OPEN painted finish
LANDING
3 3 Non-skid Tiles with nosing
1.00
1.70
RAMP DN LANDING
4 4
1.00
0.20
10.80 3.40 0.80 22.65 0.30
0.50
39.15
A B C D E F G H I
1 2 3 4
1 SECOND FLOOR PLAN APEX 10.40 m
3 A SCALE 1:100m
1.60
TOP OF GIRT 8.80 m
3.20
2.60
1.10
27
28 SCND FFL 5.60 m
10.40
26
25
24
23 CEILING LN
22
21
20
3.60
19
18
17
2.70
16
15
14
13
12
11
10 GRND FFL 2.00 m
09
08
07
06
2.00
05
SEE FOUNDATION PLAN 04
03
02
01
00 NGL 0.00 m