Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


MUNICIPALITY OF CLARIN

A B C D E F G H I
38.05

4.95 3.75 2.10 9.00 7.70 2.90 7.70

1.65 1.25 1.25 1.25 1.65

1 1

ROTAVAP

PAVATOR
14 20 21 32 1.30 1.30
08

2.15
PWD
2.60

SHOWER REWOHS

AUTOCLAVE

EVALCOTUA
13 19 22 31
± 4.01 SQM
FEMALE CR 07

SAFETY CAB

BAC YTEFAS
LANDING RAMP DN
± 12.75 SQM @ 0.050m

12 18 23 30
GAS GAS GAS

INCUBATOR

ROTABUCNI
11 06 1.15 1.10 1.10 1.15
IS LABORATORY

1.20
12 10 BIOLOGY LABORATORY BIOLOGY LABORATORY
17 ± 75.00 SQM

STEP DN
11 24 29

@ 0.050m
13 09
05 7.00x7.50m 7.00x7.50m

6.75
DISTILLER

RELLITSID
14 08
± 52.50 SQM ± 52.50 SQM

FUME HOOD

DOOH EMUF
15 07 10 16 25 28
3.00

16 06 04 04 04
17 05
09 15 26 27

1.05

1.05
18 04
19 03 03
MALE CR
3.55

FREEZER

REZEERF
20 02 INSTRUCTOR INSTRUCTOR
± 12.23 SQM
21 01
12.50

02

STEP DN
STAIRS DN 22

12.00
@ 0.050m
0.95

0.80

0.80
01
0.05 0.05 0.05 0.05
2 2
41 STEP UP STEP UP STEP UP STEP UP STEP UP
@ 0.050m @ 0.050m @ 0.050m @ 0.050m @ 0.050m
STEP UP STEP UP
@ 0.050m @ 0.050m

EXTRUDED WALL
@ 0.050m
2" x 4" Metal top tail
painted finish
3.60

3.60
2" x 2" metal tubes
vertical support
OPEN painted finish

LANDING
3 3 Non-skid Tiles with nosing
1.00

1.70
RAMP DN LANDING

4 4
1.00

0.20
10.80 3.40 0.80 22.65 0.30
0.50

39.15

A B C D E F G H I

1 2 3 4
1 SECOND FLOOR PLAN APEX 10.40 m

3 A SCALE 1:100m

1.60
TOP OF GIRT 8.80 m

SEE TRUSS DETAILS CEILING LN

3.20
2.60
1.10
27
28 SCND FFL 5.60 m

10.40
26
25
24
23 CEILING LN
22
21
20

3.60
19
18
17

2.70
16
15
14
13
12
11
10 GRND FFL 2.00 m
09
08
07
06

2.00
05
SEE FOUNDATION PLAN 04
03
02
01
00 NGL 0.00 m

BOHOL ISLAND STATE UNIVERSITY


D:\BISU.png
PROPOSED TWO-STOREY SCIENCE & TECHNOLOGY BUILDING
GROUND FLOOR PLAN A-3
DR. ROXANNE ALTEA DR. ANTHONY M. PENASO
PROJECT MANAGEMENT TEAM - INFRASTRUCTURE

You might also like