Gas Turbine Generator & Gas Compressor Course

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

Event

Proposal
GAS TURBINE GENERATOR &
GAS TURBINE COMPRESSOR
COURSE

Will be Held on :
Month, Date, Year
From Monday - Friday Proposal Number
08.00 AM - 04.00 PM 01/2024
Bandung & Jakarta, Indonesia

Prepared by : Proposed to :

......................... Rusia Project


Table
of Contents

01 Overview

Foreword 01
Event Objective 02

02 Event Description

Activites 04
Rundown 05

03 Closing

Closing Remarks 06
Validity Sheet 07
01
Overview
Foreword | Event Objective
FOREWORD Basic Understanding, New Unit Installation,
Operation and Maintenance, Change Out and
Overhaul Gas Turbine.

EVENT PROPOSAL
Event
Objective
To get a basic knowledge and understanding of gas turbine
compressor package operation consists of the turbine
engine and centrifugal gas compressor, the system
components and knowledge of its hardware function.

To gain a basic knowledge of the maintenance aspect of


gas turbine compressors.
To learn the basic knowledge of high-speed rotating
equipment other aspects as of compressor surge control,
turbine control system and high-speed rotating machinery
vibration.

To get basic knowledge of installation of new unit GTC dan


GTG, foundation, package tie down, mounting leveling,
Alignment, piping installation, electrical installation, balance
of plant, instrument, software, safety device, Pre-
commissioning, Commissioning and start-up.

To know and understand to overhaul process, Disassembly


and Cleaning, Component Disassembly, Dimensional
Checks, Non-Destructive Test, Component Repairs, Product
Upgrades, Rotor Balancing, Product Reassembly, Product
Testing

EVENT PROPOSAL
Who should attend?
Superintendents, Supervisors, technicians, planners,
Operators, engineers ( mechanical, electrical, instrument,
turbotronic), mechanics who deal with gas compression,
New unit Installation, operation and maintenance, Change
out and overhaul Gas Turbine.

Pre-Requisites
Has a basic mechanical, electrical and technical
background, minimum High School or equivalent with 2
years working experience.

Instructors
Instructors comprises of National Engineers and several
Technical Expert in oil and gas field operation with 15 years
plus experience in Solar Gas Turbine Maintenance.
Engineer has experience in new installation, GTC GTG
Exchange, GT stripping down
Programmer in turbotronic software
Personel has experience in Precommissioning,
Commissioning and start up GTC, GTG

EVENT PROPOSAL
Event Activity

SPEAKER
Opening
introduce participants to the background and
objectives of the seminar based on the topic to
be discussed.

...............................
Mentor

Material Discussion Season


Presentation Season
The presentation of material The presentation session has
is of course the most
finished, so now it's time to move
important session in the
training event rundown. Here on to the rundown of the next
the speaker will begin to training event, namely the
present the seminar topic in discussion session. The session will
more detail.
be filled with participants asking
questions about material they
don't understand. through this
session the participants will have a
broader perspective on the
seminar topic.
Event
Day 1 Rundown

Activity Time

Introduction to Gas Turbine ( Basic Understanding ) 08.00 - 09.30

Coffee break 09.30 - 10.00

Materi I : Compressor set application


10.00 - 11.00
How is the Turbine Work

Materi II : Brayton Cycle 11.00 - 12.00

Lunch Break 12.00 - 13.00

Materi III : Air System, Start System, Lube Oil System,


13.00 - 14.00
Fuel Gas System, Turbine Control System

Materi IV : Surge Control 14.00 - 15.00

Materi V : Operation Procedure, Performance


15.00 - 16.00
Analysis

Closing

EVENT PROPOSAL
Event
Day 2
Rundown
Activity Time

Introduction Basic Centrifugal Gas Compressor 08.00 - 09.30

Coffee break 09.30 - 10.00

Materi I :
Centrifugal Gas Compressor Principle
10.00 - 11.00
Solar Gas Compressor components and design
philosophy

Materi II :
Gas Compressor bearing and seals assembly 11.00 - 12.00
Gas compressor performance characteristic

Lunch Break 12.00 - 13.00

Materi III : Gas Turbine package support system


13.00 - 14.00
components

Materi IV :
Start system
Oil system
Seal Oil Buffer gas system
14.00 - 16.00
Servo system
Air system
Fuel system
Control system

Closing

EVENT PROPOSAL
Event
Day 3 Rundown
Activity Time

Introduction Electrical control system components


08.00 - 09.30
and its functions

Coffee break 09.30 - 10.00

Materi I : Control panels, end devices,


10.00 - 11.00
speed/temperature/MFAC black boxes

Materi II :
Topping calibration threshold
Yard valves components
11.00 - 12.00
Start mode : Auto/Manual Valve sequence, Test
Instrumentation : Selenoid, Versa shutoff valve,
switches

Lunch Break 12.00 - 13.00

Materi III : Start up sequence


Intro to Electrical logic control diagram, drawing
symbols
13.00 - 16.00
Start sequence block diagram, start up overview
Annunciator and shutdown indicator
Start up sequence up to loading speed

Closing

EVENT PROPOSAL
Event
Day 4 Rundown
Activity Time

Materi I : Surge Control System


Surge in centrifugal gas Compressor
08.00 - 09.30
Surge control instrumentation system
components and fuction

Coffee break 09.30 - 10.00

Materi II : Gas Turbine Maintenance


Preventive maintenance
Engine washed 10.00 - 12.00
Bore scope inspection
Compressor restage

Lunch Break 12.00 - 13.00

Materi III : Start Up and Operating Procedure


Start up procedure 13.00 - 14.00
Routine inspection

Materi IV : Synchronous Generator


Power Generation
Field Exitation
14.00 - 15.00
Voltage Regulator
Speed Control
Load Control

Closing

EVENT PROPOSAL
Event
Day 5
Rundown
Activity Time

Vibration Mesurement, Data collection and Vibration


08.00 - 09.30
Analys

Coffee break 09.30 - 10.00

Materi I : Transducer Selection, Location &


Installation
10.00 - 11.00
How to select transducer
How to install vibration transducer

Materi II : Vibration Source and Pattern


Natural vibration
11.00 - 12.00
Vibration source of rotating equipment
Pattern of vibration on rotating equipment

Lunch Break 12.00 - 13.00

Materi III : Vibration Measurement and Data


Collection
13.00 - 14.00
How to measure vibration signal
Point of data will be collected

Materi IV : Vibration Analysis


Vibration spectrum
Wave form, polar, cascade 14.00 - 16.00
Trending VS Vibration severity chart / alarm
setting

Closing

EVENT PROPOSAL
Event
Day 6 Rundown
Activity Time

Materi I : GTC , GTG New Installation


Design and Fabricate Structure
Mechanical Installation, Package Tie-Down, 08.00 - 09.30
Package Mounting, Leveling, Initial Alignment
Fabricate and Install the Piping System

Coffee break 09.30 - 10.00

Materi II : Electrical Installation. 10.00 - 11.00

Materi III :
Balance of Plant Installation 11.00 - 12.00
Instrument Installation

Lunch Break 12.00 - 13.00

Materi IV :
13.00 - 14.00
Control System / Software Installation

Materi V :
14.00 - 15.00
Safety Device Installation

Materi VI :
15.00 - 16.00
Pre-Commissioning, Commissioning and StartUp

Closing

EVENT PROPOSAL
Event
Day 7 Rundown
Activity Time

Turbine Change Out 08.00 - 09.30

Coffee break 09.30 - 10.00

Materi I :
Preparation 10.00 - 11.00
Remove / Dissasembly Old Gas Turbine

Materi II :
11.00 - 12.00
Installation new Gas Turbine

Lunch Break 12.00 - 13.00

Materi III :
Detergent Wash
Test Run 13.00 - 16.00
Start Up
Monitoring

Closing

EVENT PROPOSAL
Event
Day 8 Rundown

Activity Time

Turbine Overhauled 08.00 - 09.30

Coffee break 09.30 - 10.00

Materi I :
10.00 - 11.00
Decision making factor

Materi II :
11.00 - 12.00
GT Repair / Overhaul Option

Lunch Break 12.00 - 13.00

Materi III :
13.00 - 14.00
Repair at Site

Materi IV :
14.00 - 16.00
Repair at Workshop

Closing

EVENT PROPOSAL
Event
Day 9 Rundown
Activity Time

Turbine Overhauled (Continue) 08.00 - 09.30

Coffee break 09.30 - 10.00

Materi I :
Dissasembly and Cleaning 10.00 - 11.00
Component Disassembly

Materi II :
Dimensional Check
11.00 - 12.00
Non-Destrucktive Test
Component Repair

Lunch Break 12.00 - 13.00

Materi III :
Product Upgrades 13.00 - 14.00
Rotor Balancing

Materi IV :
Product Reassembly 14.00 - 15.00
Product Testing

Materi V :
15.00 - 16.00
Overhauled Reporting

Closing

EVENT PROPOSAL
Event
Day 10 Rundown

Activity Time

Turbine Workshop Visit

Jakarta
1 day full

Bandung

EVENT PROPOSAL
THE TEAMS

................ .......…....... ..................

Speaker 1 Speaker 2 Speaker 3

..................... ..................... ....................

Speaker 4 Speaker 5 Speaker 6

EVENT PROPOSAL
Further
information

Phone
Website
Email
Address

You might also like