3.5stry RC STR Drawing (20.1.24)
3.5stry RC STR Drawing (20.1.24)
3.5stry RC STR Drawing (20.1.24)
FOR
18'-0" x 53'-0"
SPECIFICATION :
A A
6 x longitudinal bar diameter
PROJECT
s0 <
6"
Larger of C1 or C2 (maximum spacing outside lo )
l > Clear height /6
0 See note below
+ _
18" M n,l > M n, l /2 BLOCK NO.
_
+ LOT NO.
M n, r > M n, r /2
_ + TOWNSHIP
6 x longitudinal bar diameter M n or M n > (max. Mn at either joint)/4
s0 < SUBJECT
< s0 /2 0.25 x (smaller of C1 or C2 )
(maximum spacing within lo ) Fig. Flexural requirements for beams Special Moment-Resisting Frame Detailing
d/4 S-2
DATE
8 x smallest long. bar diameter
s< REVISED
24 x hoop bar diameter
C
2 12"
< 2"
DESIGN BY:
Hoops Stirrups with seismic hooks
C
1
Z-AXIS
Section A-A
h Engineering Training & Design Center
Note: Tension Splice within center half of member
length enclosed with transverse
DRAWN BY: CHECKED BY: PROJECT NO.
reinforcement per ACI Sec 21.6.4
2h
s < d/2
Fig. Transverse reinforcement requirements for columns
Transverse reinforcement determined in
accordance with ACI Sec. 21.5.4 at both ends
Ref : U Nyi Hla Nge ; "Ref es e o se nd ield Refe en e an al o ite nginee s ns e to s " ; 1st edition, 2010.
Standard cut off point for beam
OWNER
L1 L2 L3
PROJECT
(3) Do not splice at more than 50% of the total at any section LOT NO.
TOWNSHIP
SPECIFICATION
(5) Clear spacing between the row of rebar = 1"
SCALE 1 SHEET NO.
4" = 1'-0"
Standard cut off point for slab S-3
DATE
DESIGN BY:
L1 L2 L3
Beam Beam Beam Beam
Slab
Z-AXIS
(1) Clear concrete cover = ¾" Engineering Training
& Design Center
(2) Do not splice at more than 50% of the total at any section.
DRAWN BY: CHECKED BY: PROJECT NO.
(3) Do not splice any bar within cantilever span.
(4) Do not splice within a distance of twice the slab height from
joints.
(5) Lap splice = 50 x Main bar diameter
L/2 Beam
65d
OWNER
2h Splice zone 2h
d = Bar diameter
65d
H
d = Bar diameter BLOCK NO.
LOT NO.
TOWNSHIP
H/2
SUBJECT
Beam SPECIFICATION
Splice zone
SCALE 1 SHEET NO.
4" = 1'-0"
S-4
DATE
65d 2h
L
h = Beam depth
DESIGN BY:
d = Bar diameter
Z-AXIS
Splice Location for Column Engineering Training
& Design Center
Splice Location for Bottom Bars
DRAWN BY: CHECKED BY: PROJECT NO.
The following minimum thickness of concrete cover outside of the outermost steel are specified.
PROJECT
Footing - 3"
BLOCK NO.
LOT NO.
12db TOWNSHIP
SUBJECT
r 4db r
≥2.5" min SPECIFICATION
DESIGN BY:
Table - Extension length
6db 12db Extension length (in) Z-AXIS
͘
135 Bar Size db
≥ 3" min 4 db 6 db 12 db
Engineering Training
r r for sesimic hooks & Design Center
r 6.5 mm dia 1 1 1/2 3
6db 8 mm dia 1 1/4 1 7/8 3 3/4
No. 5 No. 6, 7 or 8 10 mm dia 1 5/8 2 3/8 4 3/4 DRAWN BY: CHECKED BY: PROJECT NO.
(16mm) bar or smaller (16mm to 25mm) bar No. 8
(25mm) bar or smaller 12 mm dia 1 7/8 2 7/8 5 5/8
db db db 16 mm dia 2 1/2 3 3/4 7 1/2
18 mm dia 2 7/8 4 1/4 8 1/2
20 mm dia 3 1/8 4 3/4 9 1/2
22 mm dia 3 1/2 5 1/4 10 3/8
Fig. Standard bar hooks (tie & Stirrups)
25 mm dia 4 6 12
Special Reinforcement Column
6"
(d) At exterior corner slab (only two way slab)
provide additional rebar as shown BLOCK NO.
LOT NO.
TOWNSHIP
SUBJECT
SPECIFICATION
Z-AXIS
Engineering Training
& Design Center
la1 > ldh > 8d b or 6 in. la1 > ldh > 8d b or 6 in. (a) Beam - Column Connections (b) Beam - Girder Connections
( using alternative method ) ( using alternative method )
Primary
Column
beam
(girder)
lb1 > ldh > 8d b or 6 in.
lb1 > ldh > 8d b or 6 in. BLOCK NO.
Column Primary
Note : Modification factors may be applied to lhb values clear cover clear cover beam LOT NO.
> 2 in. > 2 in. (girder)
as explained in Section (9) to find ldh values. > 6 in. or 8 d b TOWNSHIP
> 6 in. or 8 d b
Note : In case the width of column or primary beam SUBJECT
Note : Clear end cover > 2 in. for both top and bottom
(girder) is not large enough to contain ldh but of it 90° hooks in all cases.
End Anchorage Lengths Detailing
is desired to keep the same bar size , then , as an Note : In most cases under gravity loads only, for the bottom
alternative , the following less desirable method bars, a standard hook with > 6 in. inside the column
of anchoring based on total length may be used SCALE 3 SHEET NO.
16" = 1'-0"
or primary beam is recommended even though it is
[ Sect. 10 (B) ] . If it is still impossible to place the S-7
allowed not to use the hooks at all ; l b2 may be DATE
hook in the girder , reduce the bar size in order to neglected for such a case. For cases with possible REVISED
reduce the required anchorage length. stress reversal , l b2 must be provided , however.
DESIGN BY:
Secondary
beam Secondary
beam db = diameter of main bar, in.
2 in.
h, b = depth and width of primary beam, respectively, in.
2 in. clear Primary beam ( Girder )
Primary beam
( Girder )
Ref : U Nyi Hla Nge ; "Ref es e o se nd ield Refe en e an al o ite nginee s ns e to s " ; 1st edition, 2010.
Floating Column / Prop Column Exterior column with large offset
Flotating Column
Bend up tension Bar OWNER
to resist Shear Lap
splice If 3" or more, use dowel bar
Bond Length for Transfer Beam s
Tension Bar s
2 PROJECT
s
2
Not more than s Lap
BLOCK NO.
in exterior joints splice
Additional vertical stirrup LOT NO.
Tension Development Length Offset bend
to resist shear TOWNSHIP
1
0.25 x ( smaller of C1 or C2 ) DATE
Z-AXIS
Engineering Training
& Design Center
s C2
Elevation Plan
Fig. Transverse reinforcement requirement for Longitudinal Reinforcement Outside a confined column core
TRIMMING HOLES IN A SLAB
Where holes or groups of holes are considered to be structurally insignificant, then the following rules apply:
W1
(a) Minimum unsupported edge distance = width of hole w1
W2
(b) Maximum width of isolated opening measured at right-angles to span = 1000mm (40ft)
(c) Maximum length of isolated opening measured parallel to span = 0.25 of span Lx
W2
(d) Maximum total width (w1+w2+w3) of multiple holes measured at right-angles to the span Lx = 0.25 of span Ly
span Ly
(1) Small isolated holes with sides ≤ 150mm(6'') can generally be ignored structurally.
OWNER
(2) Larger isolated holes with sides ≤ 500mm (20'') : cut or slide back affected bars to face of hole. Compensating bars of equal area should be
provided to trim all sides. Trimmers should be provided a minimum 45db (nominal anchorage length) beyond the hole.
W3
(3) Large isolated holes with sides 500mm (20'') to 1000mm (40'') : treat as No.(2) above, but in addition trim top of hole with similar bars. If depth of
slab exceeds 250mm (10''), where practical, provided diagonal reinforcement of similar area in top and bottom, but consideration should be given
PROJECT
to the congestion of multiple layers.
(4) Groups of holes within boundary of ≤ 500mm (20'') : trim as single hole using methods described in No.(2) above. Bars should pass alongside
holes where possible. span Lx
(5) Groups of holes within boundary of 500mm (20'') to 1000mm (40'') or less : trim as single hole using methods described in No.(2) and No.(3)
Diagonal steel of similar area in top and bottom BLOCK NO.
above
Move N2/2 of displaced bars
LOT NO.
45db to each side of opening and
db
spaced @ 3''o/c. Move N2/2 of displaced bars
45
Provide 2bars minimum each side to each side of opening and TOWNSHIP
spaced @ 3''o/c.
Provide 2bars minimum each side SUBJECT
Opening Opening
Trimming Holes in slab
N2
N2
SCALE 3 SHEET NO.
16" = 1'-0"
45
db
Move N1/2 of displaced bars Move N1/2 of displaced bars S-9
45db
Move N2/2 of displaced bars Diagonal steel of similar area in top and bottom
to each side of opening and N1
45db Z-AXIS
spaced @ 3''o/c. 45db Move N2/2 of displaced bars
N1
Provide 2bars minimum each side to each side of opening and Engineering Training & Design Center
spaced @ 3''o/c.
Provide 2bars minimum each side
N2
N2
N2
N2
45db
19'-0"
18'-0"
2'-0"
1
11'-6"
2
8'-6"
37'-6"
MAT26
8'-0"
MB1
53'-0"
4
7'-0"
15'-4"
19'-0"
CF1
5 MAT26 - 37'-6"x19'-0"x26"
9'-0"
CF1- 19'-0"x9'-0"x24"
9'-8"
8'-0"
6
MB1-18"x26"
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING Y Y
A B A B
19'-0" 19'-0"
4'-6"
X X
5
9'-0"
9'-0"
4'-6"
4'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
Column strip Middle Strip Column strip Column strip Middle Strip Column strip
Y Y
X Y
Footing Rebar Plan (Bottom Layer) Footing Rebar Plan (Bottom Layer)
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING Y Y
A B A B
19'-0" 19'-0"
4'-6"
X X
5
9'-0"
9'-0"
4'-6"
4'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
Column strip Middle Strip Column strip Column strip Middle Strip Column strip
Y Y
X Y
Footing Rebar Plan (Top Layer) Footing Rebar Plan (Top Layer)
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING
A B 5
19'-0" 9'-0"
6" 18'-0" 6" 4'-6" 4'-6"
2'-0"
GB
N.G.L(±0'.0") N.G.L(±0'.0")
13'-0"
13'-0"
2'-0"
2'-0"
3" thk; 1:3:6 Lean Concrete 3" thk; 1:3:6 Lean Concrete
9" thk; Hardcore Filling 9" thk; Hardcore Filling
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING Y Y
A B A B
19'-0" 19'-0"
4'-0"
4'-0"
4'-6"
4'-6"
8'-0"
8'-0"
6
4'-0"
4'-0"
3'-6"
3'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
column strip middle strip column strip column strip middle strip column strip
Y Y
Y
Footing Rebar Plan (Bottom Layer) Footing Rebar Plan (Bottom Layer)
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING Y Y
A B A B
19'-0" 19'-0"
4'-0"
4'-0"
4'-6"
4'-6"
8'-0"
8'-0"
6
4'-0"
4'-0"
3'-6"
3'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
column strip middle strip column strip column strip middle strip column strip
Y Y
Y
Footing Rebar Plan (Top Layer) Footing Rebar Plan (Top Layer)
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS
Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING
A B 6
19'-0"
8'-0"
6" 18'-0" 6" 3'-6" 4'-6"
GB GB
2'-0"
2'-0"
GB
N.G.L(±0'.0") N.G.L(±0'.0")
13'-0"
13'-0"
2'-0"
2'-0"
3" thk; 1:3:6 Lean Concrete 3" thk; 1:3:6 Lean Concrete
9" thk; Hardcore Filling 9" thk; Hardcore Filling
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS A B A B
Type: MAT-1 18'-0"
Dimension: 37'-6" x 19'-0" x 26" 19'-0" 18'-0"
2'-0"
MAT FOOTING
2'-0"
13'-0" 6'-0" 19'-0"
13' Width 6' Width
1 1
11'-6"
11'-6"
26'-0" Width
26'-0"
2 2
16mm@ 5" c/c (within 26' width)
8'-6"
8'-6"
37'-6"
37'-6"
3 3
4'-0"
8'-0"
8'-0"
4'-0"
20mm@ 5" c/c (within 7'-6" width)
7'-6" Width
7'-6"
4 4
3'-6"
7'-6"
7'-6"
4'-0" Width
16mm@ 5" c/c (within 4' width)
4'-0"
16mmØ @ 5" C/C (Longer direction bottom bar) within 13' Width 16mmØ @ 5" C/C (Shorter direction bottom bar) 4'-0" width
16mmØ @ 4" C/C (Longer direction bottom bar) within 4' Width 20mmØ @ 5" C/C (Shorter direction bottom bar) 7'-6" width
Mat Footing Rebar Plan (Bottom Layer)
16mmØ @ 5" C/C (Shorter direction bottom bar) 26'-0" width
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS A B A B
Type: MAT-1
Dimension: 37'-6" x 19'-0" x 26" 19'-0" 18'-0"
2'-0"
MAT FOOTING 6" 6"
2'-0"
18'-0" 19'-0"
6" 6"
1 1
11'-6"
11'-6"
26'-0" Width
26'-0"
2 2
16mm@ 4.5" c/c (within 26' width)
8'-6"
8'-6"
37'-6"
37'-6"
3 3
4'-0"
8'-0"
8'-0"
4'-0"
20mm@ 5" c/c (within 7'-6" width)
7'-6" Width
7'-6"
4 4
3'-6"
7'-6"
7'-6"
4'-0" Width
16mm@ 4.5" c/c (within 4' width)
4'-0"
16mmØ @ 5" C/C (Longer direction Top bar) within 19' Width
16mmØ @ 4.5" C/C (Shorter direction Top bar) 4'-0" width
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS
Type: MAT-1 A B
Dimension: 37'-6" x 19'-0" x 26" 19'-0"
MAT FOOTING 6" 18'-0" 6"
Column Column
Plinth Level(+2'-0")
2'-0"
GB
N.G.L(±0'.0")
13'-0"
2'-2"
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS
Type: MAT-1
Dimension: 37'-6" x 19'-0" x 26"
MAT FOOTING
1 2 3 4
37'-6"
Plinth Level(+2'-0")
GB GB GB GB
2'-0"
N.G.L(±0'.0")
13'-0"
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
16'-10"
11'-6"
2
8'-6"
9" tk Brick Wall
3 PLINTH LEVEL
2'-0"
8'-0"
N.G.L (±0'-0")
53'-0"
4'-0"
3" tk (1:3:6) Lean concrete
4 9" tk Hardcore filling
2'-6"
15'-4"
Brick Wall
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
1
C1 C1
11'-6"
2 C1 C1
8'-6"
3 C1 C1
8'-0"
53'-0"
4 C1 C1
15'-4"
1'-2"
5 C2 C2
9'-8"
6 C2 C2
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)
Column Schedule ( 1 )
14"
Ground Floor +
6-16mmØ
12"
Ground Floor +
6-16mmØ
SUBJECT
PROJECT DRAWN BY:
COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.
S-23
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
1
C1 C1
11'-6"
2 C1 C1
8'-6"
3 C1 C1
8'-0"
53'-0"
4 C1 C1
15'-4"
5 C2 C2
9'-8"
6 C2 C2
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)
Column Schedule ( 2 )
14"
First Floor +
6-16mmØ
12"
Ground Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
First Floor 10-16mmØ
SUBJECT
PROJECT DRAWN BY:
COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.
S-23
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
1
C1 C1
11'-6"
2 C1 C1
8'-6"
3 C1 C1
8'-0"
53'-0"
4 C1 C1
15'-4"
5 C2 C2
9'-8"
6 C2 C2
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)
Column Schedule ( )
14"
Second Floor +
6-16mmØ
12"
First Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
Second Floor 10-16mmØ
SUBJECT
PROJECT DRAWN BY:
COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.
S-23
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
1
C1 C1
11'-6"
2 C1 C1
8'-6"
3 C1 C1
8'-0"
53'-0"
4 C1 C1
15'-4"
5 C2 C2
9'-8"
6 C2 C2
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)
Column Schedule ( 4 )
Second Floor
14" x 12"
C1 14" 12" to 2-10mm@4"c/c 2-10mm@6"c/c
14"
Third Floor 10-16mmØ
12"
Second Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
Third Floor 10-16mmØ
SUBJECT
PROJECT DRAWN BY:
COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.
S-23
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
1
C1 C1
11'-6"
2 C1 C1
8'-6"
3 C1 C1
8'-0"
53'-0"
4 C1 C1
15'-4"
5
9'-8"
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)
Column Schedule ( 5 )
Third Floor
14" x 12"
C1 14" 12" to 2-10mm@4"c/c 2-10mm@6"c/c
14"
Roof Floor 10-16mmØ
SUBJECT
PROJECT DRAWN BY:
COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.
S-23
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B
18'-0"
B10x18
1
PC1
B10x10
PC1 PC1 PC1
11'-6"
B10x12
B10x14
B10x12
B10x12
B10x12
2 B10x18
B10x12
B10x12
8'-6"
B10x18
3
B10x12
B10x14
B10x10
B10x12
8'-0"
53'-0"
B10x18
4
B10x14
B10x14
15'-4"
B10x18
5
B10x14
B10x14
9'-8"
B10x18
6
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB400)
round Beam Schedule 1
Moment Reinforcement Shear Reinforcement
Type Size Cross Section @ Column Strip Cross Section @ Middle Strip
Top Bar Bottom Bar Middle Bar Within 2h Outside 2h
3-20mm Ø 3-20mm Ø
3-20mm Ø 3-20mm Ø
3-16mmØ 3-16mmØ
B10x10 10" x10" 3-16mm Ø 3-16mm Ø - 10mm@4"c/c 10mm@6"c/c
3-16mmØ 3-16mmØ
Throughout bars
Cut off bars
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
A B
18'-0"
B9x9
B9x9
B9x9
B9x9 B9x9
11'-6"
PC1 PC1 PC1
8'-6"
3
8'-0"
53'-0"
4
15'-4"
5
9'-8"
SUBJECT
PROJECT DRAWN BY:
S-22
DATE
NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB400)
Mezzanine loor Beam Schedule 1
Moment Reinforcement Shear Reinforcement
Type Size Cross Section @ Column Strip Cross Section @ Middle Strip
Top Bar Bottom Bar Middle Bar Within 2h Outside 2h
3-16mmØ 3-16mmØ
B9x9 9"x9" 3-16mm Ø 3-16mm Ø - 10mm@5"c/c 10mm@5"c/c
3-16mmØ 3-16mmØ
Throughout bars
Cut off bars
SUBJECT
PROJECT DRAWN BY:
S-22
DATE