STRUCTURAL DRAWING

FOR

THREE & HALF STOREYED RC BUILDING

18'-0" x 53'-0"
SPECIFICATION :

Special Moment-Resisting Frame Detailing

(a) Columns (b) Beams


Joint reinforcement > 200/ f y
ρ 3 f 'c / f y
min =
ρ 0.025
max =
OWNER
_ _
M n, l M n, r

A A
6 x longitudinal bar diameter
PROJECT
s0 <
6"
Larger of C1 or C2 (maximum spacing outside lo )
l > Clear height /6
0 See note below
+ _
18" M n,l > M n, l /2 BLOCK NO.

_
+ LOT NO.
M n, r > M n, r /2
_ + TOWNSHIP
6 x longitudinal bar diameter M n or M n > (max. Mn at either joint)/4
s0 < SUBJECT
< s0 /2 0.25 x (smaller of C1 or C2 )
(maximum spacing within lo ) Fig. Flexural requirements for beams Special Moment-Resisting Frame Detailing

SCALE 3 SHEET NO.


16" = 1'-0"

d/4 S-2
DATE
8 x smallest long. bar diameter
s< REVISED
24 x hoop bar diameter
C
2 12"
< 2"
DESIGN BY:
Hoops Stirrups with seismic hooks
C
1
Z-AXIS
Section A-A
h Engineering Training & Design Center
Note: Tension Splice within center half of member
length enclosed with transverse
DRAWN BY: CHECKED BY: PROJECT NO.
reinforcement per ACI Sec 21.6.4

2h
s < d/2
Fig. Transverse reinforcement requirements for columns
Transverse reinforcement determined in
accordance with ACI Sec. 21.5.4 at both ends

Fig. Transverse reinforcement requirements for beams

Ref : U Nyi Hla Nge ; "Ref es e o se nd ield Refe en e an al o ite nginee s ns e to s " ; 1st edition, 2010.
Standard cut off point for beam

L1/3 L1/3 L2/3 L2/3 L3/3 L3/3


2" 2"
2" 2" 2" 2"
Stirrup Stirrup Stirrup

OWNER

L1/8 L1/8 L2/8 L2/8 L3/8 L3/8

L1 L2 L3

PROJECT

(1) Clear concrete cover = 1.5"


(2) First stirrup is to be located at 2" from the column face BLOCK NO.

(3) Do not splice at more than 50% of the total at any section LOT NO.

TOWNSHIP

(4) Do not splice any bar within cantilever span SUBJECT

SPECIFICATION
(5) Clear spacing between the row of rebar = 1"
SCALE 1 SHEET NO.
4" = 1'-0"
Standard cut off point for slab S-3
DATE

L1/3 L1/3 L2/3 L2/3 L3/3 L3/3


2" 2"
2"
2" 2" 2"

DESIGN BY:
L1 L2 L3
Beam Beam Beam Beam
Slab
Z-AXIS
(1) Clear concrete cover = ¾" Engineering Training
& Design Center
(2) Do not splice at more than 50% of the total at any section.
DRAWN BY: CHECKED BY: PROJECT NO.
(3) Do not splice any bar within cantilever span.
(4) Do not splice within a distance of twice the slab height from
joints.
(5) Lap splice = 50 x Main bar diameter
L/2 Beam
65d

OWNER

2h Splice zone 2h

h = Beam depth PROJECT

d = Bar diameter

Splice Location for Top Bars

65d
H
d = Bar diameter BLOCK NO.

LOT NO.

TOWNSHIP

H/2
SUBJECT

Beam SPECIFICATION
Splice zone
SCALE 1 SHEET NO.
4" = 1'-0"
S-4
DATE
65d 2h
L
h = Beam depth
DESIGN BY:
d = Bar diameter
Z-AXIS
Splice Location for Column Engineering Training
& Design Center
Splice Location for Bottom Bars
DRAWN BY: CHECKED BY: PROJECT NO.

Maximum spacing of tie bar & stirrup at every splice is 4"c/c


Concrete cover

The following minimum thickness of concrete cover outside of the outermost steel are specified.

Not exposed directly to weather Exposed directly to weather


Particular
or not in contact with the ground or in contact with the ground

Slab & Wall 2" but 1.5" for No.5 (16mmØ)


0.75"
and smaller bar
OWNER

Beam & Column 1.5" 2"

PROJECT

Footing - 3"

BLOCK NO.

LOT NO.

12db TOWNSHIP

SUBJECT
r 4db r
≥2.5" min SPECIFICATION

SCALE 1 SHEET NO.


4" = 1'-0"
Table - Minimum diameter of bend for standard hooks
S-5
DATE
db Bar Size db Minimum diameter (inside)
Fig. Main bar db
Main Bars (10mm through 25mm) 6 db
Stirrups & Ties (10mm through 16mm) 4 db

DESIGN BY:
Table - Extension length
6db 12db Extension length (in) Z-AXIS
͘
135 Bar Size db
≥ 3" min 4 db 6 db 12 db
Engineering Training
r r for sesimic hooks & Design Center
r 6.5 mm dia 1 1 1/2 3
6db 8 mm dia 1 1/4 1 7/8 3 3/4
No. 5 No. 6, 7 or 8 10 mm dia 1 5/8 2 3/8 4 3/4 DRAWN BY: CHECKED BY: PROJECT NO.
(16mm) bar or smaller (16mm to 25mm) bar No. 8
(25mm) bar or smaller 12 mm dia 1 7/8 2 7/8 5 5/8
db db db 16 mm dia 2 1/2 3 3/4 7 1/2
18 mm dia 2 7/8 4 1/4 8 1/2
20 mm dia 3 1/8 4 3/4 9 1/2
22 mm dia 3 1/2 5 1/4 10 3/8
Fig. Standard bar hooks (tie & Stirrups)
25 mm dia 4 6 12
Special Reinforcement Column

(a) At every splice


max; spacing of tie bar / stirrup= 4"c/c
(b) At every joint (beam to beam) Beam OWNER

max; spacing of stirrup= 4"c/c


(c) At every exterior joint (beam to column)
provide a pair of special tie bar with max; spacing = 6" PROJECT

6"
(d) At exterior corner slab (only two way slab)
provide additional rebar as shown BLOCK NO.

LOT NO.

TOWNSHIP

SUBJECT

SPECIFICATION

SCALE 1 SHEET NO.


4" = 1'-0"
L/5 L/5
S-6
DATE

L/5 Rebar 10mm @ 6"c/c L/5 Rebar 10mm @ 6"c/c


(End with standard hooks) (End with standard hooks)
DESIGN BY:

Z-AXIS
Engineering Training
& Design Center

DRAWN BY: CHECKED BY: PROJECT NO.

Top Bar Bottom Bar


End Anchorage Lengths

(A) Using Standard Hooks (B) Using Alternative Method (based on


total length-less desirable and only for
use when space is not adequate for
(a) Beam - Column Connections (b) Beam - Girder Connections
( using standard hooks ) ( using standard hooks ) standard hook ldh )
OWNER

la1 > ldh > 8d b or 6 in. la1 > ldh > 8d b or 6 in. (a) Beam - Column Connections (b) Beam - Girder Connections
( using alternative method ) ( using alternative method )

clear cover clear cover la2 > ldh + 14 db


> 2 in. > 2 in.

lb2 > ldh + 14 db

lb2 > ldh + 11 db


la2 > ldh + 14 db PROJECT

Primary
Column
beam
(girder)
lb1 > ldh > 8d b or 6 in.
lb1 > ldh > 8d b or 6 in. BLOCK NO.
Column Primary
Note : Modification factors may be applied to lhb values clear cover clear cover beam LOT NO.
> 2 in. > 2 in. (girder)
as explained in Section (9) to find ldh values. > 6 in. or 8 d b TOWNSHIP
> 6 in. or 8 d b
Note : In case the width of column or primary beam SUBJECT
Note : Clear end cover > 2 in. for both top and bottom
(girder) is not large enough to contain ldh but of it 90° hooks in all cases.
End Anchorage Lengths Detailing
is desired to keep the same bar size , then , as an Note : In most cases under gravity loads only, for the bottom
alternative , the following less desirable method bars, a standard hook with > 6 in. inside the column
of anchoring based on total length may be used SCALE 3 SHEET NO.
16" = 1'-0"
or primary beam is recommended even though it is
[ Sect. 10 (B) ] . If it is still impossible to place the S-7
allowed not to use the hooks at all ; l b2 may be DATE
hook in the girder , reduce the bar size in order to neglected for such a case. For cases with possible REVISED
reduce the required anchorage length. stress reversal , l b2 must be provided , however.

DESIGN BY:

Anchorage Length Available in a Primary Beam (Girder)


Z-AXIS

1.875 in. Engineering Training & Design Center


b
l max ≈ b + h - 5.875 - 2.5 d b(in.) (for the outermost layer)
l max ≈ b + h - 5.875 - 6.5 d b(in.) (for the second layer) DRAWN BY: CHECKED BY: PROJECT NO.
l max
l max ≈ b + h - 5.875 - 10.5 d b(in.) (for the third layer)
h

Secondary
beam Secondary
beam db = diameter of main bar, in.
2 in.
h, b = depth and width of primary beam, respectively, in.
2 in. clear Primary beam ( Girder )
Primary beam
( Girder )

Ref : U Nyi Hla Nge ; "Ref es e o se nd ield Refe en e an al o ite nginee s ns e to s " ; 1st edition, 2010.
Floating Column / Prop Column Exterior column with large offset

Flotating Column
Bend up tension Bar OWNER
to resist Shear Lap
splice If 3" or more, use dowel bar
Bond Length for Transfer Beam s
Tension Bar s
2 PROJECT

s
2
Not more than s Lap
BLOCK NO.
in exterior joints splice
Additional vertical stirrup LOT NO.
Tension Development Length Offset bend
to resist shear TOWNSHIP

Bottom Reinforcement s Closed tie SUBJECT

to resist Bending Moment


SPECIFICATION
Dowel bar

SCALE 1 SHEET NO.


4" = 1'-0"
S-8

1
0.25 x ( smaller of C1 or C2 ) DATE

s 6 x longer bar diameter


s0 DESIGN BY:

Z-AXIS
Engineering Training
& Design Center
s C2

DRAWN BY: CHECKED BY: PROJECT NO.

Elevation Plan

Fig. Transverse reinforcement requirement for Longitudinal Reinforcement Outside a confined column core
TRIMMING HOLES IN A SLAB

Where holes or groups of holes are considered to be structurally insignificant, then the following rules apply:

W1
(a) Minimum unsupported edge distance = width of hole w1

W2
(b) Maximum width of isolated opening measured at right-angles to span = 1000mm (40ft)

(c) Maximum length of isolated opening measured parallel to span = 0.25 of span Lx

W2
(d) Maximum total width (w1+w2+w3) of multiple holes measured at right-angles to the span Lx = 0.25 of span Ly

span Ly
(1) Small isolated holes with sides ≤ 150mm(6'') can generally be ignored structurally.
OWNER

(2) Larger isolated holes with sides ≤ 500mm (20'') : cut or slide back affected bars to face of hole. Compensating bars of equal area should be
provided to trim all sides. Trimmers should be provided a minimum 45db (nominal anchorage length) beyond the hole.

W3
(3) Large isolated holes with sides 500mm (20'') to 1000mm (40'') : treat as No.(2) above, but in addition trim top of hole with similar bars. If depth of
slab exceeds 250mm (10''), where practical, provided diagonal reinforcement of similar area in top and bottom, but consideration should be given
PROJECT
to the congestion of multiple layers.

(4) Groups of holes within boundary of ≤ 500mm (20'') : trim as single hole using methods described in No.(2) above. Bars should pass alongside
holes where possible. span Lx

(5) Groups of holes within boundary of 500mm (20'') to 1000mm (40'') or less : trim as single hole using methods described in No.(2) and No.(3)
Diagonal steel of similar area in top and bottom BLOCK NO.
above
Move N2/2 of displaced bars
LOT NO.
45db to each side of opening and

db
spaced @ 3''o/c. Move N2/2 of displaced bars

45
Provide 2bars minimum each side to each side of opening and TOWNSHIP
spaced @ 3''o/c.
Provide 2bars minimum each side SUBJECT
Opening Opening
Trimming Holes in slab
N2

N2
SCALE 3 SHEET NO.
16" = 1'-0"

45
db
Move N1/2 of displaced bars Move N1/2 of displaced bars S-9
45db

to each side of opening and to each side of opening and DATE


spaced @ 3''o/c. spaced @ 3''o/c.
Provide 2bars minimum each side Provide 2bars minimum each side REVISED
N1 N1
N1, N2 = Number of slab rebars cut off at opening
N1, N2 = Number of slab rebars cut off at opening
No.(2) - Opening (side ≤ 500mm)
No.(3) - Opening (side 500mm to 1000mm) DESIGN BY:

Move N2/2 of displaced bars Diagonal steel of similar area in top and bottom
to each side of opening and N1
45db Z-AXIS
spaced @ 3''o/c. 45db Move N2/2 of displaced bars
N1
Provide 2bars minimum each side to each side of opening and Engineering Training & Design Center
spaced @ 3''o/c.
Provide 2bars minimum each side
N2

N2 DRAWN BY: CHECKED BY: PROJECT NO.


N2

N2
N2

N2

Move N1/2 of displaced bars


to each side of opening and Move N1/2 of displaced bars
45db

45db

spaced @ 3''o/c. to each side of opening and


Provide 2bars minimum each side spaced @ 3''o/c.
Provide 2bars minimum each side
N1, N2 = Number of slab rebars cut off at opening N1, N2 = Number of slab rebars cut off at opening
No.(4) - Groups of openings (boundary≤500mm) No.(5) - Groups of openings (500mm to 1000mm)
A B

19'-0"
18'-0"

2'-0"
1

11'-6"
2

8'-6"

37'-6"
MAT26

8'-0"

MB1
53'-0"
4

7'-0"
15'-4"
19'-0"

CF1
5 MAT26 - 37'-6"x19'-0"x26"

9'-0"
CF1- 19'-0"x9'-0"x24"
9'-8"

CF2 CF2- 19'-0"x8'-0"x24"

8'-0"
6
MB1-18"x26"

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING Y Y

A B A B
19'-0" 19'-0"

6" 18'-0" 6" 6" 18'-0" 6"


4'-6"

4'-6"
X X
5
9'-0"

9'-0"
4'-6"

4'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
Column strip Middle Strip Column strip Column strip Middle Strip Column strip
Y Y
X Y

Footing Rebar Plan (Bottom Layer) Footing Rebar Plan (Bottom Layer)

SUBJECT
PROJECT DRAWN BY:

COMBINED FOOTING DETAIL (CF1)


CHECKED BY:
THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING Y Y

A B A B
19'-0" 19'-0"

6" 18'-0" 6" 6" 18'-0" 6"


4'-6"

4'-6"
X X
5
9'-0"

9'-0"
4'-6"

4'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
Column strip Middle Strip Column strip Column strip Middle Strip Column strip
Y Y
X Y

Footing Rebar Plan (Top Layer) Footing Rebar Plan (Top Layer)

SUBJECT
PROJECT DRAWN BY:

COMBINED FOOTING DETAIL (CF1)


CHECKED BY:
THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF1
Dimension: 19'-0" x 9'-0" x 24"
COMBINED FOOTING

A B 5
19'-0" 9'-0"
6" 18'-0" 6" 4'-6" 4'-6"

Column Column Column

Plinth Level(+2'-0") Plinth Level(+2'-0")


GB GB
2'-0"

2'-0"
GB
N.G.L(±0'.0") N.G.L(±0'.0")
13'-0"

13'-0"
2'-0"

2'-0"
3" thk; 1:3:6 Lean Concrete 3" thk; 1:3:6 Lean Concrete
9" thk; Hardcore Filling 9" thk; Hardcore Filling

Cross Section (X-X) Cross Section (Y-Y)

SUBJECT
PROJECT DRAWN BY:

FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING Y Y

A B A B

19'-0" 19'-0"

6" 18'-0" 6" 6" 18'-0" 6"

4'-0"

4'-0"
4'-6"

4'-6"
8'-0"

8'-0"
6

4'-0"

4'-0"
3'-6"

3'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
column strip middle strip column strip column strip middle strip column strip

Y Y
Y

Footing Rebar Plan (Bottom Layer) Footing Rebar Plan (Bottom Layer)

SUBJECT
PROJECT DRAWN BY:

COMBINED FOOTING DETAIL (CF2)


CHECKED BY:
THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING Y Y

A B A B

19'-0" 19'-0"

6" 18'-0" 6" 6" 18'-0" 6"

4'-0"

4'-0"
4'-6"

4'-6"
8'-0"

8'-0"
6

4'-0"

4'-0"
3'-6"

3'-6"
6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 6'-4"
column strip middle strip column strip column strip middle strip column strip

Y Y
Y

Footing Rebar Plan (Top Layer) Footing Rebar Plan (Top Layer)

SUBJECT
PROJECT DRAWN BY:

COMBINED FOOTING DETAIL (CF2)


CHECKED BY:
THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
COMBINED FOOTING DETAILS

Type: CF2
Dimension: 19'-0" x 8'-0" x 24"
COMBINED FOOTING

A B 6
19'-0"
8'-0"
6" 18'-0" 6" 3'-6" 4'-6"

Column Column Column

Plinth Level(+2'-0") Plinth Level(+2'-0")

GB GB
2'-0"

2'-0"
GB
N.G.L(±0'.0") N.G.L(±0'.0")
13'-0"

13'-0"
2'-0"

2'-0"
3" thk; 1:3:6 Lean Concrete 3" thk; 1:3:6 Lean Concrete
9" thk; Hardcore Filling 9" thk; Hardcore Filling

Cross Section (X-X) Cross Section (Y-Y)

SUBJECT
PROJECT DRAWN BY:

FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS A B A B
Type: MAT-1 18'-0"
Dimension: 37'-6" x 19'-0" x 26" 19'-0" 18'-0"

2'-0"
MAT FOOTING

2'-0"
13'-0" 6'-0" 19'-0"
13' Width 6' Width

6" 6" 6" 6"

1 1

11'-6"
11'-6"

16mm@ 5" c/c (within 13' width)

16mm@ 4" c/c (within 6' width)

26'-0" Width
26'-0"
2 2
16mm@ 5" c/c (within 26' width)

8'-6"
8'-6"

37'-6"
37'-6"

3 3

4'-0"
8'-0"
8'-0"

4'-0"
20mm@ 5" c/c (within 7'-6" width)

7'-6" Width
7'-6"
4 4

3'-6"
7'-6"
7'-6"

4'-0" Width
16mm@ 5" c/c (within 4' width)

4'-0"
16mmØ @ 5" C/C (Longer direction bottom bar) within 13' Width 16mmØ @ 5" C/C (Shorter direction bottom bar) 4'-0" width

16mmØ @ 4" C/C (Longer direction bottom bar) within 4' Width 20mmØ @ 5" C/C (Shorter direction bottom bar) 7'-6" width
Mat Footing Rebar Plan (Bottom Layer)
16mmØ @ 5" C/C (Shorter direction bottom bar) 26'-0" width

SUBJECT
PROJECT DRAWN BY:

MAT FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS A B A B
Type: MAT-1
Dimension: 37'-6" x 19'-0" x 26" 19'-0" 18'-0"

2'-0"
MAT FOOTING 6" 6"

2'-0"
18'-0" 19'-0"

6" 6"

1 1

11'-6"
11'-6"

16mm@ 5" c/c (within 19' width)

26'-0" Width
26'-0"
2 2
16mm@ 4.5" c/c (within 26' width)

8'-6"
8'-6"

37'-6"
37'-6"

3 3

4'-0"
8'-0"
8'-0"

4'-0"
20mm@ 5" c/c (within 7'-6" width)

7'-6" Width
7'-6"
4 4

3'-6"
7'-6"
7'-6"

4'-0" Width
16mm@ 4.5" c/c (within 4' width)

4'-0"
16mmØ @ 5" C/C (Longer direction Top bar) within 19' Width
16mmØ @ 4.5" C/C (Shorter direction Top bar) 4'-0" width

20mmØ @ 5" C/C (Shorter direction Top bar) 7'-6" width


Mat Footing Rebar Plan (Top Layer)
16mmØ @ 4.5" C/C (Shorter direction Top bar) 26'-0" width

SUBJECT
PROJECT DRAWN BY:

MAT FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS
Type: MAT-1 A B
Dimension: 37'-6" x 19'-0" x 26" 19'-0"
MAT FOOTING 6" 18'-0" 6"
Column Column

Plinth Level(+2'-0")

2'-0"
GB
N.G.L(±0'.0")

13'-0"

2'-2"

3" thk; 1:3:6 Lean Concrete


9" thk; Hardcore Filling

Cross Section (X-X)

SUBJECT
PROJECT DRAWN BY:

FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
MAT FOOTING DETAILS
Type: MAT-1
Dimension: 37'-6" x 19'-0" x 26"
MAT FOOTING
1 2 3 4
37'-6"

2'-0" 11'-6" 8'-6" 8'-0" 7'-6"

Plinth Level(+2'-0")
GB GB GB GB
2'-0"

N.G.L(±0'.0")
13'-0"

6" 2-10mm@4"c/c 2-10mm@6"c/c 2-10mm@4"c/c


6"
3'-6" 3'-0" 3'-6"
2'-2"

3" thk; 1:3:6 Lean Concrete


9" thk; Hardcore Filling

Cross Section (Y-Y)

SUBJECT
PROJECT DRAWN BY:

FOOTING DETAIL CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

16'-10"

11'-6"
2

8'-6"
9" tk Brick Wall

3 PLINTH LEVEL

2'-0"
8'-0"
N.G.L (±0'-0")

9" tk Retaining Wall

53'-0"

4'-0"
3" tk (1:3:6) Lean concrete
4 9" tk Hardcore filling

2'-6"

RETAINING WALL SECTION

15'-4"

Brick Wall

1 12" tk (1:2:4) Flooring Topping

4 21" tk (1:2:4) Cement Concrete

6" tk Sand Filling


5 1'-0" tk Hardcore & Sand Flooring
9'-8"

SUBJECT
PROJECT DRAWN BY:

RETAINING WALL PLAN & SECTION


CHECKED BY:
FOUR & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

1
C1 C1

11'-6"
2 C1 C1

8'-6"
3 C1 C1

8'-0"
53'-0"
4 C1 C1

15'-4"

1'-2"

5 C2 C2
9'-8"

6 C2 C2

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)

Column Schedule ( 1 )

Size Shear Reinforcement


Type Level Column Size & Main Steel Remark
X Y Within lo Outside lo
12"

Footing 14" x 12"


C1 14" 12" to 4-20mmØ @ corner 2-10mm@4"c/c 2-10mm@6"c/c

14"
Ground Floor +
6-16mmØ

12"

Footing 14" x 12"


C2 14" 12" to 4-20mmØ @ corner 2-10mm@4"c/c 2-10mm@6"c/c
14"

Ground Floor +
6-16mmØ

Note: max spacing of tie bar at every splice is 4"c/c


Note: column cross-section not to scale

SUBJECT
PROJECT DRAWN BY:

COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-23
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

1
C1 C1

11'-6"
2 C1 C1

8'-6"
3 C1 C1

8'-0"
53'-0"
4 C1 C1

15'-4"

5 C2 C2
9'-8"

6 C2 C2

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)

Column Schedule ( 2 )

Size Shear Reinforcement


Type Level Column Size & Main Steel Remark
X Y Within lo Outside lo
12"

Ground Floor 14" x 12"


C1 14" 12" to 4-20mmØ @ corner 2-10mm@4"c/c 2-10mm@6"c/c

14"
First Floor +
6-16mmØ

12"

Ground Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
First Floor 10-16mmØ

Note: max spacing of tie bar at every splice is 4"c/c


Note: column cross-section not to scale

SUBJECT
PROJECT DRAWN BY:

COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-23
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

1
C1 C1

11'-6"
2 C1 C1

8'-6"
3 C1 C1

8'-0"
53'-0"
4 C1 C1

15'-4"

5 C2 C2
9'-8"

6 C2 C2

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)

Column Schedule ( )

Size Shear Reinforcement


Type Level Column Size & Main Steel Remark
X Y Within lo Outside lo
12"

First Floor 14" x 12"


C1 14" 12" to 4-20mmØ @ corner 2-10mm@4"c/c 2-10mm@6"c/c

14"
Second Floor +
6-16mmØ

12"

First Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
Second Floor 10-16mmØ

Note: max spacing of tie bar at every splice is 4"c/c


Note: column cross-section not to scale

SUBJECT
PROJECT DRAWN BY:

COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-23
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

1
C1 C1

11'-6"
2 C1 C1

8'-6"
3 C1 C1

8'-0"
53'-0"
4 C1 C1

15'-4"

5 C2 C2
9'-8"

6 C2 C2

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)

Column Schedule ( 4 )

Size Shear Reinforcement


Type Level Column Size & Main Steel Remark
X Y Within lo Outside lo
12"

Second Floor
14" x 12"
C1 14" 12" to 2-10mm@4"c/c 2-10mm@6"c/c

14"
Third Floor 10-16mmØ

12"

Second Floor
14" x 12"
C2 14" 12" to 14" 2-10mm@4"c/c 2-10mm@6"c/c
Third Floor 10-16mmØ

Note: max spacing of tie bar at every splice is 4"c/c


Note: column cross-section not to scale

SUBJECT
PROJECT DRAWN BY:

COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-23
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

1
C1 C1

11'-6"
2 C1 C1

8'-6"
3 C1 C1

8'-0"
53'-0"
4 C1 C1

15'-4"

5
9'-8"

SUBJECT
PROJECT DRAWN BY:

COLUMN LAYOUT PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB-400)

Column Schedule ( 5 )

Size Shear Reinforcement


Type Level Column Size & Main Steel Remark
X Y Within lo Outside lo
12"

Third Floor
14" x 12"
C1 14" 12" to 2-10mm@4"c/c 2-10mm@6"c/c

14"
Roof Floor 10-16mmØ

Note: max spacing of tie bar at every splice is 4"c/c


Note: column cross-section not to scale

SUBJECT
PROJECT DRAWN BY:

COLUMN SCHEDULE
CHECKED BY:
THREE & HLAF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-23
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
A B

18'-0"

B10x18
1
PC1

B10x10
PC1 PC1 PC1

11'-6"
B10x12

B10x14
B10x12

B10x12

B10x12
2 B10x18

B10x12

B10x12
8'-6"
B10x18
3

B10x12

B10x14

B10x10

B10x12
8'-0"
53'-0"
B10x18
4

B10x14

B10x14
15'-4"

B10x18
5
B10x14

B10x14
9'-8"

B10x18
6

SUBJECT
PROJECT DRAWN BY:

GROUND BEAM PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB400)
round Beam Schedule 1
Moment Reinforcement Shear Reinforcement
Type Size Cross Section @ Column Strip Cross Section @ Middle Strip
Top Bar Bottom Bar Middle Bar Within 2h Outside 2h

3-20mm Ø 3-20mm Ø

B10x18 10"x18" 3-20mm Ø 3-20mm Ø 2-16mm Ø 10mm@4"c/c 10mm@6"c/c 2-16mm Ø 2-16mm Ø

3-20mm Ø 3-20mm Ø

2-20mm Ø 2-20mm Ø 2-20mmØ+1-16mmØ 2-20mmØ+1-16mmØ


B10x14 10" x14" + + - 10mm@4"c/c 10mm@6"c/c
1-16mm Ø 1-16mm Ø 2-20mmØ+1-16mmØ 2-20mmØ+1-16mmØ

2-20mm Ø 2-20mm Ø 2-20mmØ+1-16mmØ 2-20mmØ


B10x12 10" x12" + + - 10mm@4"c/c 10mm@6"c/c
1-16mm Ø cut off 1-16mm Ø cut off 2-20mmØ 2-20mmØ+1-16mmØ

3-16mmØ 3-16mmØ
B10x10 10" x10" 3-16mm Ø 3-16mm Ø - 10mm@4"c/c 10mm@6"c/c
3-16mmØ 3-16mmØ

Throughout bars
Cut off bars

SUBJECT
PROJECT DRAWN BY:

GROUND BEAM SCHEDULE CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE
A B

18'-0"

B9x9 PC1 B9x9


1

B9x9

B9x9

B9x9
B9x9 B9x9

11'-6"
PC1 PC1 PC1

8'-6"
3

8'-0"
53'-0"
4

15'-4"

5
9'-8"

SUBJECT
PROJECT DRAWN BY:

MEZZANINE FLOOR BEAM PLAN CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE

NOTE:Contractor shall check and verify all dimensions before work commence. Any discrepancy or indistinctness shall be asked to structure designer.
fc'-2800Psi (G-25) fy-50000Psi (HRB400)
Mezzanine loor Beam Schedule 1
Moment Reinforcement Shear Reinforcement
Type Size Cross Section @ Column Strip Cross Section @ Middle Strip
Top Bar Bottom Bar Middle Bar Within 2h Outside 2h

3-16mmØ 3-16mmØ
B9x9 9"x9" 3-16mm Ø 3-16mm Ø - 10mm@5"c/c 10mm@5"c/c
3-16mmØ 3-16mmØ

Throughout bars
Cut off bars

SUBJECT
PROJECT DRAWN BY:

MEZZANINE FLOOR BEAM SCHEDULE CHECKED BY:


THREE & HALF STOREYED RC BUILDING PROJECT NO. DESIGN BY;
SCALE SHEET NO.

S-22
DATE