SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.

PLOT LIMIT NEIGHBOUR PLOT NEIGHBOUR PLOT PLOT LIMIT 3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

B2/DB-EXT
ISO FOR CHILLER UNIT 1 ISO FOR CHILLER UNIT 2 PROPOSED

S
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20
HOLDING TANK
SECURITY ROOM

W
N
ONE WAY

40
INTERLOCK

ON
AY
39

EW

EW
ON

AY
38
37
36
35

ONE WAY
RYB7/DB-L

34

ONE WAY
CAR CHARGIING
NEIGHBOUR PLOT

RYB6/DB-L
33
CAR CHARGIING

NEIGHBOUR PLOT
32

RYB5/DB-L
CAR CHARGIING
31
30

PROPOSED WORKSHOP
29

+0.20m

GROUND + MEZZANINE FLOOR


HOLDING TANK
28
27
26

Y4/DB-EXT
25
24
23

ONE WAY

Y2/DB-EXT
22

ONE WAY
21

SMDB-
AHU CB-1
SERVICE BLOCK

ELECTRICALFRONT ACCESS NON COMBUSTIBLE


ROOM LV-PANEL
CAPACITOR BANK NON LOUVERED DOOR

INTERLOCK
PROPOSED

INTERLOCK
LV ROOM DETAILS
GROUND FLOOR
(SCALE:- 1:50)

SUBSTATION ROOM LAYOUT B1/DB-EXT


SHALL BE AS PER DEWA
REQUIREMENTS.
SUBSTATION REV. DESCRIPTION DATE
+0.30m
±0.00m ISO FOR GATE BARRIER
ENTRANCE
+0.30m F.F.L LIGHT VEHICLES ONLY
ISO FOR GATE BARRIER
EXIT
B4/DB-EXT
Y5/DB-EXT R2/DB-EXT
PLOT LIMIT
SERVICE BLOCK Automatic Barrier BLOCK WALL Automatic Barrier
GROUND FLOOR PLAN
1
1.80 m Height
PLOT LIMIT SCALE 1:100
PLOT LIMIT MAIN CONSULTANT
GATE LEVEL TO BE 30 CM GATE LEVEL TO BE 30 CM
ABOVE THE EXISTING ASPHALT ROAD ABOVE THE EXISTING ASPHALT ROAD

R O A D 60.96M Lead Consultants:


© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE

SETTING OUT PLAN T:+971 (4) 2854383


F:+971 (4) 2855251

CONTRACTOR

PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE SETTING LAYOUT SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 E-100 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 ELECTRICAL LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD

R2/DB-L B1/DB-GF2ENTRANCE GATE EXIT GATE


AS PER ENGINEER APPROVAL.
RSD 3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
RSD Y1/DB-EXT 4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL
+0.30m
F.F.L

OVER GROUND
WORKSHOP AREA

S
DOMESTIC / FIRE
FIGHTING TANKS ( 2 nos )
Air Compressor Open Height area for Vehicles weight lifts
OFFICES AREA 588.60 SQ.M / 6335.70 SQ.FT

W
N
B1/DB-GF1

ST
ST
MANUAL WASH
BAY area
Y1/DB-GF1
R1/DB-GF1
PUMP ROOM

( 2 nos ) R1/DB-GF2
Auto Car Lift M.TOI
Y1/DB-GF2 F. TOILET

GARBAGE ROOM +0.30m


F.F.L
R1/DB-TEL H.TOI H.TOI

SP
FT
LI

ST
ST
+0.30m
F.F.L

ST

CAR LIFT SHOWROOM


UP
+0.30m
UP

F.F.L

ST

ST
ST

Y5/DB-SH

H.TOI
R1/DB-SH
+0.30m
+0.30m F.F.L
F.F.L W/P F. TOILET
Y1/DB-SH

W/P
M. TOILET
B1/DB-SH

H.TOI
SP
R2/DB-SH R5/DB-SH

REV. DESCRIPTION DATE


Y2/DB-SH

B2/DB-SH
MAIN CONSULTANT

Lead Consultants:
+0.30m © Drawing & Design Copyright of:
F.F.L Options Engineering Consultancies
00
P O Box :377041
F.F.L
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

GROUND FLOOR PLAN


PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE GROUND FLOOR SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EL-101 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 LIGHTING LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
ST ST ST ST

AS PER ENGINEER APPROVAL.


HB HB HB HB HB HB HB HB
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
Y2/DB-MEZZ1 4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
R2/DB-GF1 APPROVAL

ST ST ST ST

WORKSHOP AREA
SPARE PART
Chiller Area +4.50m HB HB
Open Height area for Vehicles weight lifts
HB HB HB HB HB HB

S
F.F.L STORE
ST ST ST ST Y2/DB-GF1
B2/DB-MEZZ1

W
N
ST ST ST ST HB HB HB HB HB HB HB
DN

B2/DB-GF1
R4/DB-MEZZ1
ST ST ST ST

CHILLER PUMP ( MEZZANINE FLOOR AREA )


R1/DB-MEZZ1 R3/DB-MEZZ1
FOR WORKSHOP OFFICES
OFFICES AREA 180.00 SQ.M / 1937.50 SQ.FT ST ST ST ST

Y1/DB-MEZZ1
+4.80m
F.F.L

B1/DB-MEZZ1 R2/DB-MEZZ1
LI DN
FT

R3/DB-SH
HB HB HB HB HB HB HB HB HB HB HB HB

Y3/DB-SH
HB HB HB HB HB HB HB HB HB HB HB HB

B3/DB-SH

HB HB HB HB HB HB HB HB HB HB HB HB

R4/DB-SH (CAR LIFT LOCATION TO BE


HB HB HB
DECIDED BY INTERIOR DESIGN)
HB HB HB HB HB HB HB

CAR LIFT
DN

DN

R1/DB-MEZZ2 +4.50m
F.F.L

Y1/DB-MEZZ2

B1/DB-MEZZ2 R2/DB-MEZZ2

( MEZZANINE FLOOR AREA )


Y2/DB-MEZZ2 MANAGEMENT OFFICE AREA
OFFICES AREA 568.85.00 SQ.M / 6123.10 SQ.FT

B2/DB-MEZZ2
REV. DESCRIPTION DATE
+4.50m
F.F.L
R3/DB-MEZZ2 Y3/DB-MEZZ2

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

MEZZANINE FLOOR PLAN


PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE MEZZANINE FLOOR SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EL-102 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 LIGHTING LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
REV. DESCRIPTION DATE

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

ROOF PLAN
PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE ROOF PLAN SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EL-103 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 LIGHTING LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

ISO FOR SIGNAGE NOTES


ISO FOR CAR LIFT ISO FOR CAR LIFT ISO FOR CAR LIFT
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
ENTRANCE GATE CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
EXIT GATE
RSD 2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
RSD
R5/DB-EXT AS PER ENGINEER APPROVAL.
Y3/DB-GF2 +0.30m
RYB8/DB-GF1 RYB7/DB-GF1 RYB6/DB-GF1 RYB5/DB-GF1 3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
F.F.L 4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
ISO FOR M-FAN APPROVAL

OVER GROUND
DOMESTIC / FIRE WORKSHOP AREA
FIGHTING TANKS ( 2 nos )
Open Height area for Vehicles weight lifts

S
Air Compressor
Y4/DB-GF2 R3/DB-GF1
OFFICES AREA 588.60 SQ.M / 6335.70 SQ.FT
R3/DB-L

W
N
ISO FOR JOCKEY PUMP
ISO FOR FIRE PUMP
ISO FOR DIESEL PUMP
MANUAL WASH
BAY area
B4/DB-GF2
R4/DB-L B3/DB-GF2
PUMP ROOM FACP R4/DB-GF1
B3/DB-GF1
RYB5/DB-GF2
( 2 nos )
RYB13/DB-GF2 ISO FOR G-01
Auto Car Lift M.TOI
ISO FOR G-01 RYB7/DB-GF2 RYB8/DB-GF2 RYB9/DB-GF2 RYB10/DB-GF2 RYB11/DB-GF2 F. TOILET
+0.30m R3/DB-GF2
GARBAGE ROOM
RYB6/DB-GF2 F.F.L
RYB14/DB-GF2 G-01
H.TOI H.TOI
G-01
DB-L
SMDB-L

FT
LI
R7/DB-SH R6/DB-SH

(500X300)mm @ L/L CUT OUT FOR ELECT CABLES


DB-GF-1 DB-GF-2
SMDB-GF

DB-SHOWROOM

+0.30m
F.F.L

ISO FOR G-02

ISO FOR G-02 G-02

CAR LIFT SHOWROOM


G-02
UP
+0.30m
UP

F.F.L

B7/DB-SH

H.TOI
+0.30m
+0.30m F.F.L
F.F.L F. TOILET

B6/DB-SH

M. TOILET

H.TOI
Y7/DB-SH

REV. DESCRIPTION DATE

R6/DB-SH Y6/DB-SH

MAIN CONSULTANT
ISO FOR SIGNAGE +0.30m
F.F.L Lead Consultants:
00
© Drawing & Design Copyright of:
Options Engineering Consultancies
F.F.L
P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

GROUND FLOOR PLAN


PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE GROUND FLOOR SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-101 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 POWER LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL
WORKSHOP AREA
SPARE PART
Chiller Area +4.50m
F.F.L STORE
Open Height area for Vehicles weight lifts
ISO FOR F-01

S
Y5/DB-MEZZ1
F-01

W
N
DN

B6/DB-MEZZ1 Y6/DB-MEZZ1
F-01 CHILLER PUMP R5/DB-MEZZ1 ( MEZZANINE FLOOR AREA )
R7/DB-MEZZ1
FOR WORKSHOP OFFICES
ISO FOR F-01 OFFICES AREA 180.00 SQ.M / 1937.50 SQ.FT
SMDB-MEZZ
DB-MEZZ 1

+4.80m
F.F.L
R6/DB-MEZZ1 B5/DB-MEZZ1

LI DN
FT

(CAR LIFT LOCATION TO BE


DECIDED BY INTERIOR DESIGN)
CAR LIFT
DN

DN

DB-SM DB-MEZZ 2

ISO FOR FAHU


+4.50m
F.F.L
R5/DB-MEZZ2
B5/DB-MEZZ2

ISO FOR F-02


( MEZZANINE FLOOR AREA )
MANAGEMENT OFFICE AREA F-02
F-02 OFFICES AREA 568.85.00 SQ.M / 6123.10 SQ.FT

ISO FOR F-02


+4.50m
F.F.L REV. DESCRIPTION DATE

Y5/DB-MEZZ2
MAIN CONSULTANT

R7/DB-MEZZ2
Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

MEZZANINE FLOOR PLAN

PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE MEZZANINE FLOOR SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-102 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 POWER LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
REV. DESCRIPTION DATE

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

ROOF PLAN
PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE ROOF PLAN SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-103 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 POWER LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
SL
O
ELECTRICAL NON COMBUSTIBLE ELECTRICAL

PE
NON LOUVERED DOOR
ROOM R4/DB-EXT ROOM

1:1
00
R1/DB-EXT

R3/DB-SS R1/DB-SS
SUBSTATION ROOM LAYOUT
SHALL BE AS PER DEWA
REQUIREMENTS.
SUBSTATION SUBSTATION

00

SL
1:1

OP
E
E
R3/DB-SS

OP

1:1
SL

00
PLOT LIMIT PLOT LIMIT PLOT LIMIT
SERVICE BLOCK SERVICE BLOCK SERVICE BLOCK
1 GROUND FLOOR PLAN 1 GROUND FLOOR PLAN 1 ROOF PLAN
SCALE 1:100 SCALE 1:100 SCALE 1:100 REV. DESCRIPTION DATE

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE SUBSTATION & ELEC ROOM SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-104 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446 POWER LAYOUT
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY

NOTES
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
SMDB-
AHU CB-1

ELECTRICALFRONT ACCESS NON COMBUSTIBLE


ROOM LV-PANEL
CAPACITOR BANK NON LOUVERED DOOR

LV ROOM DETAILS
GROUND FLOOR
(SCALE:- 1:50)

CB-1 LV-PANEL

CB-1
LV-PANEL
SMDB-AHU

950 MM DEEP TRENCH AS 950 MM DEEP TRENCH AS 950 MM DEEP TRENCH AS


PER DEWA REQUIREMENTS PER DEWA REQUIREMENTS PER DEWA REQUIREMENTS
TRENCH COVER TRENCH COVER TRENCH COVER

REV. DESCRIPTION DATE

S E C T I O N 'A' - 'A' S E C T I O N 'B' - 'B' S E C T I O N 'C' - 'C'


(SCALE:- 1:50) (SCALE:- 1:50) (SCALE:- 1:50)

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
ENGINEERING CONSULTANCIES Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE LV ROOM DETAILS SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-105 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)
SIGN & STAMP BY DM MUNICIPALITY
ELECTRIC FIRE PUMP JOCKEY PUMP
TCL = 60.00 kw TCL = 6.00 kw
PUMP MOTOR PUMP MOTOR DIESEL FIRE PUMP
CONTROL PANEL CONTROL PANEL BATTERY CHARGER DB-B
TCL = 4.00 kw TCL = 16.00 kw
TPN TPN TPN

4C,70mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+
1C,35mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC


ELS + ALARM + STARTER NOTES
160A TP 40A TP 40A SP 40A TP
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
MCCB MCCB MCCB MCCB
50KA 25KA 25KA 25KA CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD

RYB1

RYB2

RYB3

RYB4
AS PER ENGINEER APPROVAL.

200A. TPN + E TINNED CU BUS BARES. SMDB-B 3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
TCL : 86.00 Kw APPROVAL
DIVERSITY : 1.00
200A TP
V + A
ACH + HST MD : 86.00 Kw
MCCB N/A
50KA V + A
R Y B
E- BAR R Y B ACH + HST
N- BAR

S
LOCATION OF SMDB-B : BASEMENT FLOOR

W
N
AHU-GF 1 AHU-GF 2 AHU-GF 3 AHU-GF 4 AHU-MF 1 AHU-MF 2 AHU-MF 3 AHU-MF 4 AHU-SPARE
SPARE TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 11.20 kw TCL = 5.60 kw
DB-SHOWROOM DB-GF1 DB-GF2 DB-TEL DB-EXT DB-SM TCL= 10.60 kw ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR
TPN TPN TPN TPN TPN TPN TPN TPN TPN
TCL = 25.30 kw TCL = 20.80 kw TCL = 39.80 kw TCL = 8.00 kw TCL = 13.50 kw TCL = 30.00 kw

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+
1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC


4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,35mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,25mm² XLPE/SWA/PVC/CU+
1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,25mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC


VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB

32A TP 32A TP 32A TP 32A TP 32A TP 32A TP 32A TP 32A TP 32A TP


MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
60A TP 40A TP 100A TP 40A TP 40A SP 60A SP 100A TP
25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA
MCCB MCCB MCCB MCCB MCCB MCCB MCCB

RYB1

RYB2

RYB3

RYB4

RYB4

RYB4

RYB4

RYB4

RYB4
25KA 25KA 25KA 25KA 25KA 25KA 25KA
RYB1

RYB2

RYB3

RYB4

RYB5

RYB5

RYB6
200A. TPN + E TINNED CU BUS BARES.
SMDB-AHU
300A. TPN + E TINNED CU BUS BARES.
SMDB-GF TCL : 95.20 Kw
200A TP DIVERSITY : 1.0
TCL : 148.00 Kw V + A
V + A
300A TP MCCB N/A ACH + HST
DIVERSITY : 1.0 MD : 95.20 Kw
MCCB N/A V + A R Y B ACH + HST 35KA
V + A MD : 148.00 Kw R Y B
35KA E- BAR
R Y B ACH + HST N- BAR
R Y B ACH + HST
E- BAR N- BAR

LOCATION OF SMDB-AHU : LV ROOM


LOCATION OF SMDB-GF : GF ELEC ROOM

FAHU
TCL = 10.00 kw
CHILLER PUMP-1 CHILLER PUMP-2 CHILLER PUMP-3 CHILLER PUMP-1 CHILLER PUMP-2 CHILLER PUMP-3
DB-MEZZ 1 DB-MEZZ 2 CONTROL PANEL FUTURE LIFT SPARE SPARE
TCL = 21.00 kw TCL = 21.00 kw TCL = 21.00 kw TCL = 21.00 kw TCL = 21.00 kw TCL = 21.00 kw
TCL = 18.20 kw TCL = 22.60 kw ISOLATOR TCL = 6.00 kw TCL = 10.00 kw TCL = 10.00 kw
ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR ISOLATOR
TPN TPN TPN TPN TPN TPN TPN
4C,16mm² XLPE/SWA/PVC/CU+

4C,10mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+

4C,16mm² XLPE/SWA/PVC/CU+
4C,4mm² XLPE/SWA/PVC/CU+
1C,16mm² Y/G CU. AS ECC

1C,10mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC

1C,16mm² Y/G CU. AS ECC


1C,4mm² Y/G CU. AS ECC

VFD+100mA-ELCB 300mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB VFD+100mA-ELCB

40A TP 60A TP 32A TP 32A TP 63A TP 63A TP 63A TP 32A TP 63A TP 63A TP 63A TP 32A TP
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA
RYB1

RYB2

RYB3

RYB4

RYB1

RYB2

RYB3

RYB4

RYB1

RYB2

RYB3

RYB4
125A. TPN + E TINNED CU BUS BARES. 160A. TPN + E TINNED CU BUS BARES. 160A. TPN + E TINNED CU BUS BARES.
SMDB-MEZZANINE SMDB-CHILLER SMDB-CHILLER
TCL : 56.80 Kw TCL : 73.00 Kw TCL : 73.00 Kw
125A TP DIVERSITY : 1.0 V + A 160A TP DIVERSITY : 1.0 V + A 160A TP DIVERSITY : 1.0
MCCB N/A MD : 53.00 Kw MCCB N/A V + A MCCB N/A V + A
V + A V + A ACH + HST MD : 73.00 Kw ACH + HST MD : 73.00 Kw
35KA R Y B ACH + HST 35KA R Y B ACH + HST 35KA
R Y B R Y B
R Y B ACH + HST R Y B ACH + HST
E- BAR N- BAR E- BAR N- BAR E- BAR N- BAR

LOCATION OF SMDB-MEZZANINE : MEZZANINE FLOOR LOCATION OF SMDB-CHILLER : CHILLER. ROOM LOCATION OF SMDB-CHILLER : CHILLER. ROOM

CHILLER-1 CHILLER-2
TCL = 143.70 kw TCL = 143.70 kw SPARE SPARE SPARE
CONTROL PANEL CONTROL PANEL
DB-SS
TCL = 42.00 kw TCL = 80.00 kw TCL = 80.00 kw TCL = 2.00 kw
ISOLATOR ISOLATOR
TPN TPN

REV. DESCRIPTION DATE

3x4C,240mm² XLPE/SWA/PVC/CU+
1x4C,185mm² XLPE/SWA/PVC/CU+

1x4C,185mm² XLPE/SWA/PVC/CU+

1x4C,185mm² XLPE/SWA/PVC/CU+
1x4C,95mm² XLPE/SWA/PVC/CU+

1x4C,50mm² XLPE/SWA/PVC/CU+

1x4C,70mm² XLPE/SWA/PVC/CU+

1x4C,95mm² XLPE/SWA/PVC/CU+

1x2C,16mm² XLPE/SWA/PVC/CU+

3x1C,120mm² Y/G CU. AS ECC


1x1C,50mm² Y/G CU. AS ECC

1x1C,95mm² Y/G CU. AS ECC

1x1C,25mm² Y/G CU. AS ECC

1x1C,35mm² Y/G CU. AS ECC

1x1C,50mm² Y/G CU. AS ECC

1x1C,95mm² Y/G CU. AS ECC

1x1C,95mm² Y/G CU. AS ECC

1x1C,16mm² Y/G CU. AS ECC


MAIN CONSULTANT

ELR+SHUNT TRIP+ELS ELR+SHUNT TRIP+ELS


380Kvar 7 STEPS
Lead Consultants:
200A TP 300A TP 125A TP 160A TP 200A TP 100A TP 160A TP 160A TP 40A SP 1000A TP
MCCB MCCB MCCB MCCB MCCB
300A TP 300A TP
MCCB MCCB MCCB MCCB ACB AUTOMATIC SWITCHING © Drawing & Design Copyright of:
50KA 50KA 50KA 50KA 50KA
MCCB
50KA
MCCB
50KA 50KA 50KA 50KA 50KA 50KA CAPACITOR BANK Options Engineering Consultancies

RYB11
RYB1

RYB2

RYB3

RYB4

RYB5

RYB6

RYB7

RYB8

RYB9

RYB9

B10
P O Box :377041
2500A. TPN + E TINNED CU BUS BARES.
VOLT METER +
POWERFACTOR
METER PF
ENGINEERING CONSULTANCIES Dubai, UAE
AMMETER +
FORM-4 , TYPE-6
T:+971 (4) 2854383
PF
SELECTOR SWITCH SELECTOR SWITCH 1000A TP
3NoS PHASE ACH LV PANEL
ACB
35KA
F:+971 (4) 2855251
INDICATOR LAMP PMU
OS SC EF
AUTO TRANSFER 2500A.4P TCL : 950.00 Kw
V + A + PF SWITCH
SEGREGATED WITH SEPARATE M
K.W.H-CT METER D.O TYPE A.C.B DIVERSITY : 1.0
2500A.4P 2500/5A
COMPARTMENT FOR PAD LOCKING 65KA
EARTH BAR HA R Y B ACH + HST D.O TYPE A.C.B (CHECK METER 0.9S) ELECTRO MECHANICAL MD : 950.00 Kw
SEALING PROVISION BY DEWA 65KA
OC/SC
CASTLE KEY INTER LOCK N- BAR
SET TO 0.9 SET TO 0.9
CONTRACTOR
2x1C,150mm² Y/G PVC/SC
LOCATION OF LV PANEL : LV ROOM

SUBSTATION
EP-1 EP-2 BY DEWA
TRANSFORMER
1500KVA

PROVISION FOR
BY DEWA MOBILE GENERATOR

PROJECT NO. PROJECT PLOT NO. LOCATION DRAWING TITLE SCALE DRAWING NO.
OWNER LESSEE GATE LEVEL
PROPOSED WAREHOUSE SINGLE LINE DIAGRAM SHAIKH MOHAMMED BIN BUTTI BIN HAMED ALHAMED
1099 AL QOUZ IND. THIRD 1:150 EP-106 GOVERNMENT OF DUBAI - DUBAI REAL ESTATE CORPORATION
& WORKSHOP 3680446
B+G+M UNITED ALSAQER HEAVY EQUIPMENT SERVICE CENTER (WORKSHOP)