NEIGHBOUR PLOT NEIGHBOUR PLOT 1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

PLOT LIMIT PLOT LIMIT

4550

S
B2/DB-EXT

W
N
HOLDING TANK

ONE WAY

INTERLOCK

ON
AY
EW

EW
ON

AY
00
ENTRANCE GATE
EXIT GATE 00
RSD
RSD
+0.30m
F.F.L

OVER GROUND
DOMESTIC / FIRE
WORKSHOP AREA
( 2 nos )
FIGHTING TANKS Air Compressor Open Height area for Vehicles weight lifts
00
OFFICES AREA 588.60 SQ.M / 6335.70 SQ.FT

MANUAL WASH
00 BAY area

PUMP ROOM

ONE WAY
00 00

ONE WAY
( 2 nos ) 00

Auto Car Lift M.TOI


F. TOILET
NEIGHBOUR PLOT

NEIGHBOUR PLOT
GARBAGE ROOM +0.30m
00 00 00
F.F.L 00
H.TOI H.TOI

FT
LI

PROPOSED WORKSHOP
+0.20m

GROUND + MEZZANINE FLOOR


00
HOLDING TANK

+0.30m 00
F.F.L

00

Y4/DB-EXT
CAR LIFT SHOWROOM
UP 00
+0.30m
UP

F.F.L

H.TOI
+0.30m
F.F.L 00
+0.30m
ONE WAY

00
F.F.L F. TOILET
00

Y2/DB-EXT
00

ONE WAY
M. TOILET 00
00

H.TOI
SMDB-
AHU

ELECTRICAL NON COMBUSTIBLE


ROOM NON LOUVERED DOOR

00 00

INTERLOCK
INTERLOCK
REV. DESCRIPTION DATE
LV1
B1/DB-EXT
00
SUBSTATION +0.30m
F.F.L
+0.30m
LV1 00

±0.00m ENTRANCE
+0.30m F.F.L LIGHT VEHICLES ONLY
LD1
EXIT
R2/DB-EXT
B4/DB-EXT MAIN CONSULTANT
Y5/DB-EXT
PLOT LIMIT
SERVICE BLOCK Automatic Barrier Automatic Barrier
1 GROUND FLOOR PLAN
PLOT LIMIT SCALE 1:100
PLOT LIMIT
GATE LEVEL TO BE 30 CM GATE LEVEL TO BE 30 CM Lead Consultants:
ABOVE THE EXISTING ASPHALT ROAD ABOVE THE EXISTING ASPHALT ROAD © Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

SETTING OUT PLAN R O A D 60.96M


CONTRACTOR
SIGN & STAMP BY DM MUNICIPALITY

00
ENTRANCE GATE
00 00 EXIT GATE 00 00
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
RSD
RSD CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
+0.30m
AS PER ENGINEER APPROVAL.
F.F.L
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
00 4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL
OVER GROUND
DOMESTIC / FIRE WORKSHOP AREA
FIGHTING TANKS ( 2 nos )
Air Compressor Open Height area for Vehicles weight lifts

S
OFFICES AREA 588.60 SQ.M / 6335.70 SQ.FT

ST ST

W
MANUAL WASH

N
00
00 BAY area

PUMP ROOM
00
00

( 2 nos ) 00

Auto Car Lift M.TOI


F. TOILET

GARBAGE ROOM +0.30m


00 00 00
F.F.L 00

H.TOI H.TOI

SP
F T
LI
ST ST

00 00

+0.30m 00
F.F.L

ST

00

CAR LIFT SHOWROOM


UP 00
+0.30m
UP

F.F.L
ST

ST ST

00

H.TOI
W/P
+0.30m
F.F.L 00
00 +0.30m 00
F.F.L W/P
F. TOILET 00
00

00

W/P
M. TOILET 00
00
00

H.TOI
00

SP
00 00 REV. DESCRIPTION DATE

MAIN CONSULTANT
00
+0.30m
F.F.L
Lead Consultants:
00 © Drawing & Design Copyright of:
Options Engineering Consultancies
F.F.L
P O Box :377041
Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

GROUND FLOOR PLAN


CONTRACTOR
SIGN & STAMP BY DM MUNICIPALITY

00 00 00 00

ST ST ST ST

HB HB HB HB HB HB HB HB HB

Y2/DB-MEZZ1
R2/DB-MEZZ1
00
ST ST ST ST

WORKSHOP AREA
SPARE PART
Chiller Area +4.50m
F.F.L STORE
HB HB
Open Height area for Vehicles weight lifts
HB HB HB HB HB HB HB

ST ST ST ST Y2/DB-MEZZ1
1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY
CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.

B2/DB-MEZZ1 2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
HB HB HB HB HB HB HB
ST ST ST 00 4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
ST DN APPROVAL

00

R4/DB-MEZZ1
( MEZZANINE FLOOR AREA )

S
CHILLER PUMP 00

00
FOR WORKSHOP OFFICES
OFFICES AREA 180.00 SQ.M / 1937.50 SQ.FT

W
N
R4/DB-MEZZ1
+4.80m
F.F.L

00

LI DN
FT ST ST
00

HB HB HB HB HB HB HB HB HB HB HB HB

00 00

HB HB HB HB HB HB HB HB HB HB HB HB

00

HB HB HB HB HB HB HB HB HB HB HB HB

HB HB HB HB HB HB HB HB HB HB

00
(CAR LIFT LOCATION TO BE
DECIDED BY INTERIOR DESIGN)
CAR LIFT
HB HB HB HB HB HB HB HB
00
DN

DN
R3/DB-SH 00
00

+4.50m
F.F.L
00
00

R3/DB-SH

00
( MEZZANINE FLOOR AREA ) 00

MANAGEMENT OFFICE AREA


Y3/DB-SH
OFFICES AREA 568.85.00 SQ.M / 6123.10 SQ.FT

00 00
+4.50m
F.F.L
B3/DB-SH
REV. DESCRIPTION DATE

SP

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

MEZZANINE FLOOR PLAN


SIGN & STAMP BY DM MUNICIPALITY

1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY

1 CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.


2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD

RWP
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
RWP

(0.5MM ALUM. POWDER COATED


SHEET+50MM PUF+ALUM. FOIL LINER)
ALUMINIUM SANDWICH PANEL
RWP

RWP
REV. DESCRIPTION DATE

ROOF PLAN
MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR
SIGN & STAMP BY DM MUNICIPALITY

1. CONTRACTOR SHOULD BE SURVEYING & LEVELING AS PER SITE CONDITION IF ANY


CHANGE FOR LEVEL SHOULD BE APPLY TO DM BEFORE THE COMPLETION CERTIFICATE.
2. THE COLUMN INSIDE THE BUILDING WILL COVERED BY CONCRETE / CEMENT BOARD
AS PER ENGINEER APPROVAL.
3. THE AREA CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY APPROVAL
4. THE NO. OF CAR PARKING CAN BE ADJUSTED DURING FINAL DESIGN AND AUTHORITY
APPROVAL

WS
N
ELECTRICAL NON COMBUSTIBLE
NON LOUVERED DOOR
ELECTRICAL
ROOM R4/DB-EXT ROOM

R1/DB-EXT

R3/DB-SS R1/DB-SS
LV1 LV1
SUBSTATION SUBSTATION

LV1 LV1
R3/DB-SS
LD1 LD1
PLOT LIMIT PLOT LIMIT PLOT LIMIT
SERVICE BLOCK SERVICE BLOCK SERVICE BLOCK
1 GROUND FLOOR PLAN 1 GROUND FLOOR PLAN 1 ROOF PLAN
SCALE 1:100 SCALE 1:100 SCALE 1:100

REV. DESCRIPTION DATE

MAIN CONSULTANT

Lead Consultants:
© Drawing & Design Copyright of:
Options Engineering Consultancies

P O Box :377041
Dubai, UAE
T:+971 (4) 2854383
F:+971 (4) 2855251

CONTRACTOR

You might also like