Climate Change - FGD Brin 23 Mar 2023 Rev 15 Mar
Climate Change - FGD Brin 23 Mar 2023 Rev 15 Mar
Climate Change - FGD Brin 23 Mar 2023 Rev 15 Mar
Strictly Confidential 4
Emission Reduction Program 2018-2030 (IRENA REmap)
Strictly Confidential 5
Roadmap Indonesia untuk Mencapai NZE 2060
Strictly Confidential
Strategi PLN Group untuk Mencapai NZE 2060
Strictly Confidential
Skenario Percepatan PLN Menuju NZE 2060
Strictly Confidential
Road Map Transisi Energi PLN Indonesia Power
2023 - 2027
PLTA PLTS PLTP PLTB PLTBio PLTEBT PLTM PLT Hybrid PLTAL
Scale Up of Biomass Cofiring
Implement Biomass Co-
firing and Enhance the
3.000 7,00%
Cofiring
biomass supply chain 2.000
(%)
1.000 2,40%
0 0,00%
Biomass Volume Required (Thousand Ton/Year) Electricity Produced from Biomass (GWh)
Pembangunan ekosistem Biomassa Terintengrasi (Hutan Taman Energi, Agroforestry, Pabrik Pengolahan Khusus
Biomassa)
Strictly Confidential
Visi PLN Indonesia Power
To Be a Leading and Sustainable Power Generation Company in Southeast Asia
Visi Sustainable PLN IP sejalan dengan Aksi Global Pemimpin Dunia untuk membangun
dunia yang lebih baik yang tertuang dalam Sustainable Development Goals (SDGs) yang
Vision dapat diselaraskan dengan kerangka Environmental-Social-Governance (ESG).
To Be A
Leading and Sustainable 17 SDGs dalam Kerangka ESG ESG
Power Generation Company in (Environment, Social,
Southeast Asia Governance)
ESG Vision
memberikan gambaran
Alignment of the PLN IP Vision with the bagaimana Perusahaan
SDGs: berpartisipasi dalam
upaya mencapai SDGs
1 Industry innovation & infrastructure dengan penekanan
pada Aspek
2 Clean water & sanitation
Environment, Social &
3 Affordable & clean energy Governance, yang
merupakan Center dari
4 Climate action Sustainability Risk
Perusahaan ke depan.
5 Decent work & economic growth
6 Partnership for the goals
The Sustainable Development Goals (SDGs), adopted by the United Nations
in 2015, is universal call to action to end poverty, protect the planet, and Strictly Confidential
*www.undp.org 11
**world economic forum ensure that by 2030 all people enjoy peace and prosperity*
Rencana Pengembangan PLTA 15 PROJECTS = 2.161,4 MW
PLTA Woyla, Aceh
Tipe: hydro dam reservoir
PLTA Tanjung Sakti, Sumsel PLTA Nanga Balang, Kalbar
Fase Proyek: Pengembangan Tipe: hydro dam reservoir Tipe: hydro dam reservoir Fase PLTA Kaltara, Kaltara
Kapasitas: 174,9 MW Fase Proyek: Pengembangan Proyek: Pengembangan Tipe: hydro dam reservoir Fase
COD: 2028 Kapasitas: 114 MW Kapasitas: 33 MW + 100 MW Proyek: Pengembangan
COD: 2029 COD: 2027 Kapasitas: 200 MW
COD: 2025
KETERANGAN :
PLTA Lae Suraya, Aceh
Tipe: hydro dam reservoir PLTA Ambalau, Kalbar
Fase Proyek: Pengembangan
SumKal
Tipe: hydro dam reservoir Fase
Kapasitas: 240 MW Proyek: Pengembangan
COD: 2030 Kapasitas: 100 MW
SulMaPaNa
COD: 2027
JaMaLi
PART 2
Hydrogen & Ammonia Cofiring
Hydrogen Cofiring Test pada PLTDG Pesanggaran-Bali
Background Method
Vaporizer
Import Terminal
Produksi Ammonia Rendah Karbon
Coastal End-user
Shipping
Strictly Confidential
Modifikasi yang Diperlukan untuk Cofiring Ammonia
Ammonia Fuel Piping & Addition Mempertimbangkan Peraturan NOx saat
Additional Auxiliary Steam Platform for vales & instruments ini 550mg/Nm3, SCR diperlukan karena
Piping for Ammonia Vaporizer Peningkatan NOx akibat Ammonia
Cofiring.
Valve station for Ammonia
Burner and additional
platform
Strictly Confidential 18
Program Waste to Energy untuk Cofiring PLTU
Production Process at Glance
Distance of Suralaya
CFPP and BBJP
Bagendung Plant are
between 31-38 km
Strictly Confidential 21
Penanaman HTE di Sekitar Waduk Saguling, JABAR
Strictly Confidential 22
Penanaman HTE di Waduk P.B. Soedirman-Mrica,
Banjarnegara
Strictly Confidential 23
PLN
Indonesia Power
PART 4
Carbon Capture, Utilization & Sequestration
(CCUS)
Beberapa Jenis Teknologi CCUS
Pre-Combustion Oxy Fuel Combustion
Flue gas to
atmosphere
Steam Electricity
turbine stack
generator
Coal CO2 to
Air pollution
CO2 Distillation CO 2 storage
PC boiler control systems
system compression
(PM, SO2) H2O
Air
O2 Flue gas recycle
Air H2O
separation
Air flue gas to
unit
atmosphere
Steam
Electricity
turbine
Post Combustion
steam Process
Mostly stack
Coal Air pollution
N2
PC boiler control systems CO 2 Capture
(NO x, PM, SO2)
Air
amine Amine/CO2
CO2 to
storage
Post Combustion Amine / CO 2 CO 2
separation compression
CO2
Strictly Confidential
CCUS Cukup Kompetitif untuk Pembangkit USC
Lama
Considering lower range CAPEX for CCUS retrofit
CCUS3 Fuel O&M Capex BSES Solar T&D2
Cost breakdown USD cents/kWh, 2030
0,8
b) Selisih bisa lebih tinggi jika kapasitas
-22%
penyimpanan baterai yang dibutuhkan
lebih besar dan interkoneksi antar pulau
Solar + 8 hour BSES 5,2 4,7 2-8 10+ diperlukan untuk mentransmisikan daya
terbarukan dari satu pulau ke pulau lain.
1. ~32 GW of coal power plants are expected to retire before 2050 based on 30-40 years of lifetime – out of which 2 GW USC (USD ~3 bn investment) and 4 GW SC (USD
~6 bn investment), and ~26 GW subcritical (USD ~42 bn investment)
2. Interconnection cost between islands, ranging from 2.5 cents/kWh for Java-Sumatera to 8.6 cents/kWh for Java-Papua
3. Assuming transport: Java to Sumatera (Sumatera has biggest oil field), distance ~6000 km, utilizing offshore and onshore pipeline; Storage: Existing depleted oil wells
Source: ESDM report on technology data for the Indonesian power sector, team analysis
Strictly Confidential
Transportasi dan Penyimpanan CO2
di Ex Ladang Migas yang Tidak Berproduksi
a) CO2 yang ditangkap dari PLTU di Jawa Barat
kapasitas 2.000 MW dengan 90% penangkapan
selama 20 tahun akan mengumpulkan Total: 218
juta ton CO2.
b) Tersedia penyimpanan ladang gas lepas pantai
yang cukup di Jawa Barat untuk menampung
semua CO2 tersebut.
c) Dalam jangka panjang, penerapan wajib CCS
untuk semua PLTU Batubara Baru yang diproyek-
sikan di Sumatera Selatan akan mengakibatkan
penyimpanan CO2 Geologis di darat di ladang
gas menjadi penuh sekitar tahun 2050 dan
perluasan penyimpanan ke Akuifer Dalam
menjadi terkendala kapasitas pada tahun 2100.
Strictly Confidential
CCUS akan Menjadi Salah Satu Skenario untuk
Mencapai NZE 2060 [1]
Ultra Supercritical Power
Replacement of CFPP and Second Stage Plant Operation with Ultra Supercritical CFPP
GFDPP Plants with 1.1 GW Subcritical Retirement CCUS (24 GW) Operation with Last CCUS
Baseload NRE (9 GW) (5 GW)
Strictly Confidential
CCUS akan menjadi Salah Satu Skenario untuk
Mencapai NZE 2060 [2]
YEAR 2020 2025 2030 2035 2040 2045 2050 2055 2060
TOTAL TWH 300 365 449 515 616 783 1050 1445 1800
Strictly Confidential
TERIMA KASIH
DIREKTUR UTAMA PT PLN INDONESIA POWER
PROFIL
Pematang Siantar, 23 Juli 1969
PENDIDIDKAN
1994 - S1 Teknik Elektro, Universitas Sumatera Utara
2007 - S2 Information Technology, University of Abertay Dundee Scotland
PENGALAMAN KERJA
• 2015 2019, General Manager Unit Induk Transmisi Jawa Bagian
Tengah PT PLN (Persero)
• 2019, General Manager Pusat Pengaturan Beban (P2B) PT PLN (Persero)
• 2020 2022, Executive Vice President Electricity System Planning PT
PLN (Persero)
Strictly Confidential 31
Edwinnugraha.putra@plnindonesiapower.co.id
DEFINISI & PENYEBAB CLIMATE CHANGE
Narration Generated by ChatGPT (OpenAI)
Perubahan Iklim atau Climate Change" Faktor-faktor yang menyebabkan perubahan iklim
adalah perubahan jangka panjang dalam antara lain:
kondisi atmosfer bumi yang mencakup: 1. Aktivitas Manusia, terutama penggunaan bahan
• Suhu, bakar fosil, seperti: batubara, minyak bumi, dan
• Curah hujan, gas alam, yang menghasilkan emisi gas rumah kaca.
• Kelembaban, dan 2. Deforestasi dan Perubahan Penggunaan Lahan,
• Pola Cuaca lainnya. yang mengurangi kemampuan tanah untuk
menyerap karbondioksida dari atmosfer.
Perubahan iklim terjadi sebagai akibat dari
3. Kegiatan Pertanian, termasuk Produksi Daging
perubahan dalam konsentrasi Gas Rumah Kaca dan Limbah Peternakan, yang menghasilkan
(Greenhouse Gases) di atmosfer, yang Emisi Methana dan Nitrogen Oksida.
mengakibatkan peningkatan suhu rata-rata
4. Peningkatan Populasi Manusia dan
global. Pertumbuhan Ekonomi, yang memicu
Peningkatan Permintaan Energi dan Penggunaan
Sumber Daya Alam.
Faktor-faktor di atas dan lainnya telah menyebabkan
peningkatan konsentrasi Gas Rumah Kaca di
atmosfer bumi, yang berkontribusi pada Pemanasan
Global dan Perubahan Iklim yang signifikan dalam
Strictly Confidential 32
beberapa dekade terakhir.
DIREKTUR UTAMA PT PLN INDONESIA POWER
EDWIN NUGRAHA PUTRA ST, M.Sc.
PROFIL
Lahir di Pematang Siantar,
23 Juli 1969
PENDIDIKAN
2007 1994
S2 Information Technology S1 Teknik Elektro
University of Abertay Dundee Universitas Sumatera Utara
- Scotland
PENGALAMAN KERJA
KONTAK 2020 - 2022 2019 - 2019 2015 - 2019
Edwinnugraha.putra@plnindonesiapower.co.id Executive Vice President General Manager Pusat General Manager Unit Induk
Electricity System Planning Pengaturan Beban (P2B) Transmisi Jawa Bagian
PT PLN (Persero) PT PLN (Persero) Tengah PT PLN (Persero)
Strictly Confidential 33