Professional Documents
Culture Documents
Pre Spud Electrical Checklist
Pre Spud Electrical Checklist
Pre Spud Electrical Checklist
Annexure-2
d
ite
a) Electrical Caution Board on all electrical equipment.
NOT OPERATE, MEN WORKING ON applicable.
m
b) Notice forbidding entry of unauthorized persons in Electrical PCR / Switch Board Room.
Li
OF UNAUTHORISED PERSONS STRICTLY
n
2. DISPLAY AT STRATEGIC LOCATIONS:
t io
i) Power flow diagram. ra
ii) Cable Lay out and Earthing Drawing.
po
iii) Hazardous area classification of the location.
or
vi) &
as
i) Bio-- Data.
Bio
at
iii) List of trained MVT, First Aid & Fire fighting personnels.
iv) List of persons with Electrical License.
&
v) Accident Records.
il
hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD
OISD/DOC/08/2023/30
4. EARTHING :
d
ite
vi) Equipment, cable tray & C.G.I sheet roof etc. connected to earthing system Yes / No.
vii) 2 Separate & independent earthing exists for Transformer body.
m
viii) 2 Separate & independent earthing exists for neutral.
Li
5. PROTECTIVE EQUIPMENT:
n
io
i) Emergency tripping system at Drillers console exist & functional.
t
ii) ra
Automatic disconnection facility as applicable for drilling motors/main generators and other motors
under the fault condition available.
po
ii) Any modification in the electrical equipment used in hazardous area carried out in approved/suitable
as
manner.
G
7. VOLTAGE RESTRICTION:
al
230 volts Phase to Phase and 110 Volts Phase to Earth voltage system for lighting.
ur
hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD
OISD/DOC/08/2023/30
i) Double ladder.
ii) First Aid box and stretcher.
iii) FLP torch.
iv) Stand by / emergency generator set.
d
ite
v) Emergency lighting inside Control Room.
m
This checklist shall be a part of Pre-spud / Pre-work over check list of drilling and workover
Li
rigs.
n
t io
ra
po
or
C
as
G
al
ur
at
N
&
il
O
hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD