ABDUL WAHED

Contractor

Location: 3/0

Ref.No……….. Date:12/06/22

TEX INVOICE

SI.NO Item Description Quantity Rate Amount


A Foundation Work
1 Dry Soil 59 150 8,850
2 FS Soil 288.9 300 86,670
B Concrete Mix
1 M10 6.27 9000 56,430
2 M20 38.46 10000 3,84,600
C Reinforcement Steel
1 Installation of Reinforcement 2.7 4900 13,230
Steel
D Installation of Stub
2 Installation of Stub 1 4500 4500
E Boring
1 Boring 26 10000 2,60,000
F Shoring Shuttering
1 Shuttering 1 10000 10000

Total 8,24,280