DRAWING NOTES:
1. MECHANICAL SERVICES SWITCHBOARD PROVIDED BY MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR IS TO LIAISE WITH MECHANICAL
CONTRACTOR FOR EXACT SUBMAINS TERMINATION REQUIREMENTS AND LOCATION OF POWER SUPPLY.
2. PROVIDE FULL DISCRIMINATION OF PROTECTIVE DEVICES.
3. PROVIDE POWER SUPPLY FOR POWER FACTOR CORRECTION. LIAISE WITH PROVIDER FOR EXACT POWER REQUIREMENTS AND FINAL LOCATION.
ELECTRICAL CONTRACTOR IS TO ALLOW FOR SUBMAIN CABLES, TERMINATIONS AND ALL REQUIRED INTERFACES TO SUIT THE INSTALLATION.
1
1 1
4. PROVIDE SURGE PROTECTION TO MAIN SWITCHBOARD.
5. PROVIDE FULLY DIMENSIONED SHOP DRAWINGS OF MAIN SWITCHBOARD, METER PANELS AND ALL DISTRIBUTION BOARDS TO SUPERINTENDENT FOR
REVIEW PRIOR TO MANUFACTURE. APPROVALS SHALL BE OBTAINED FROM AUTHORITIES AND LICENSED ELECTRICAL INSPECTOR FOR ALL MSB AND METER
PANEL SHOP DRAWINGS PRIOR TO MANUFACTURE.
6. PROVIDE RCD PROTECTED CIRCUIT BREAKERS TO ALL CIRCUITS AS PER AS/NZS 3000 REQUIREMENTS.
7. PROVIDE POWER SUPPLY FOR HARMONIC DISTRIBUTION BOARD IF REQUIRED. FULL SITE STUDY OF HARMONICS TO BE UNDERTAKEN ON COMPLETION OF
BUILDING TO DETERMINE CORRECT SELECTION OF REQUIRED FILTERS.
8. ELECTRICAL CONTRACTOR TO LIAISE WITH CIVIL CONTRACTOR FOR EXACT POWER REQUIREMENTS FOR STORM WATER PUMP, TERMINATION
REQUIREMENTS AND LOCATION OF POWER SUPPLY.
9. CONTRACTOR TO PROVIDE EMF SHIELDING TO MAIN SWITCHROOM. DESIGN OF THE EMF SHIELDING SHALL BE CARRIED OUT BY A SPECIALIST EMF
CONSULTANT ENGAGED BY THE BUILDER.
10. METERS CTS SHOULD BE SELECTED BASED ON FINAL VERIFIED LOADS AND COMPLIED WITH EMBEDDED NETWORK REQUIREMENTS.
11. FIRE RATED SUBMAINS AND SUPPORTED STRUCTURE SHOULD COMPLY WITH AS 3013 (WS52 CLASSIFICATION).
12. FINAL SETTING FOR MAIN MSB CIRCUIT BREAKER SHOULD BE COORDINATED WITH CITIPOWER REQUIREMENTS AND SPD SETTINGS.
2
2
13. PROVIDE SHORT CIRCUIT STUDY BASED ON FINAL SIZE AND LENGTHS OF ALL INSTALLED CABLES.
14. PROVIDE SHORT CIRCUIT STUDY BASED ON FINAL SIZE AND LENGTHS OF ALL INSTALLED CABLES.
15. CIRCUIT BREAKER WITH "SHUNT TRIP DEVISE" IS CONNECTED TO FIP, UPON EVENT OF FIRE THE EV CIRCUIT BREAKERS SHOULD BE DISCONNECTED.
16. FINAL LOCATION OF CARSTACKER CONTROL PANELS SHOULD BE CONFIRMED WITH CAR STACKER SYSTEM PROVIDER.
17. EACH LIFT SHALL HAVE A SEPARATE EMS METER.
18. HOT WATER SYSTEM CONTROL BOARDS ARE BY HYDRAULIC TRADE CONTRACTOR.
LIFT 05 LIFT 06 LIFT 07 19. ELECTRICAL COMPONENTS SHOULD BE DESIGNED TO RESIST SEISMIC ACTIONS AS DETAILED IN AS 1170.4 SECTION 8.0 (EXCLUDING COMPONENTS
L70 BUILDING EXEMPTED BY CLAUSE 8.1.4 (b) (XVIII)). CONTRACTOR TO PROVIDE DETAILS OF THE METHODS TO BE UTILISED, COMPUTATIONS AND REGULATION 126
NOTE 17 CIRCUITS CERTIFICATE VERIFYING COMPLIANCE.
LEVEL 70
DB - HR LIFTS HWP-69
MSSB-69-E FDP-69.1 FDP-69.2 JP-69 L69 BUILDING CWP-69 (NOTE 18)
CIRCUITS
3
3
LEVEL 69
L68 BUILDING
CIRCUITS
LEVEL 68 HDB-L68
L67 BUILDING
CIRCUITS
LEVEL 67
(TYPICAL FOR EACH 3 LEVELS)
Lxx BUILDING
CIRCUITS
LEVEL 50 - 66 HDB-Lxx
4
4
(TYPICAL FOR EACH 3 LEVELS)
Lxx BUILDING
CIRCUITS
LEVEL 47 - 49 HDB-Lxx
L46 BUILDING
CIRCUITS
LEVEL 46
5
L44 BUILDING
CIRCUITS
LEVEL 44
L43 BUILDING
CIRCUITS
LEVEL 43
L42 BUILDING
CIRCUITS
LEVEL 42 HDB-L42
6
6
L41 BUILDING
CIRCUITS
LEVEL 41
(TYPICAL FOR EACH 3 LEVELS)
Lxx BUILDING
CIRCUITS
LEVEL 38 - 40 HDB-Lxx
L37 BUILDING
CIRCUITS
LEVEL 37
7
7
L36 BUILDING
CIRCUITS
LEVEL 36 HDB-L36
LIFT 01 LIFT 02 LIFT 03 LIFT 04
NOTE 17 NOTE 17 L35 BUILDING
DB - LR LIFTS 1 DB - LR LIFTS 2 CIRCUITS
LEVEL 35
(TYPICAL FOR EACH 3 LEVELS)
Lxx BUILDING
CIRCUITS
LEVEL 29 - 34 HDB-Lxx
8
8
L28 BUILDING
CIRCUITS
LEVEL 28
L27 BUILDING
CIRCUITS
LEVEL 27 HDB-L27
9
L25 BUILDING
CIRCUITS
LEVEL 25
L24 BUILDING
CIRCUITS
LEVEL 24 HDB-L24
L23 BUILDING
CIRCUITS
LEVEL 23
(TYPICAL FOR EACH 3 LEVELS)
10
10
Lxx BUILDING
CIRCUITS
LEVEL 20 - 22 HDB-Lxx
L13 BUILDING
CIRCUITS
LEVEL 13
L12 BUILDING
11
11
CIRCUITS
LEVEL 12 HDB-L12
L9 BUILDING CP-L9 L9 EV
12
12
CIRCUITS CIRCUITS
LEVEL 9 HDB-L9
LOCATION AND
QUANTITIES TBC
13
AMENDMENTS/REVISIONS AMENDMENTS/REVISIONS
PRELIMINARY
• This drawing was prepared by IGS for the benefit of our client pursuant to a contract which
limits the purpose for which the file may be used and relied upon, other than set out in that CLIENT ARCHITECT CONSULTANT PROJECT DRAWING TITLE
REV REVISION DESCRIPTION BY DATE REV REVISION DESCRIPTION BY DATE contract.
• The copyright of this drawing is vested in IGS and may not be reproduced in whole or part or
P1 50% DD ISSUE RK 05.04.24
•
used for the purpose of shop drawings without the express permission of IGS.
The use of any measurement, set out or other information derived from this drawing are at
FAR EAST CONSORTIUM MONUMENT MELBOURNE ELECTRICAL SERVICES DRAWN DESIGNED CHECKED SCALE (@ A0) DATE