Professional Documents
Culture Documents
Ac 036660 003 - 05312022
Ac 036660 003 - 05312022
Ac 036660 003 - 05312022
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
1. THIS OPTIONAL CROSSING FOR ARAMCO
12.00m ROADS MAY BE USED IN ROCK AREAS IF AT
LOWER COST THAN EXCAVATION AND
CONCRETE ENCASED ROAD CROSSING OVER BURIED PIPELINE IN ROCKY AREAS THE CONCRETE ENVELOPE.
. . ..
....
. . ..
.
... .
. . ..
.
....
. .....
.
...
. 7. A MINIMUM OF TWO GALVANIC ANODES WITH
.
.
. .
...
.....
...
..
...
...
..
. .
...
.....
.
...
..
...
....
. .
. .
...
.....
.
...
..
.....
.
.. ..
...
..
...
...
.
. .
....
....
.. ....
..
...
.... .. ....
..
...
.. .. ....
..
...
.. .
....
...
.
..
...
..
.. .... .. ... .. ...
A TWO-PIN GALVANIC ANODE JUNCTION BOX IS
PIPE SUPPORT REQUIRED. ANODES TO BE INSTALLED ONE EACH
A
(TYP.) CONCRETE ENVELOPE
SIDE OF PIPELINE IN CENTER OF ROAD.
CONCRETE ENCASED ROAD CROSSING OVER ABOVE GROUND PIPELINE IN ROCKY AREAS AA-036352 FOR GALVANIC ANODE INSTALLATION
DETAILS.
REBAR
12mm DIA. REBARS
(SEE TABLE)
@ 300 C/C MAX. 1500
20mm DIA. REBARS
150
@ 150 C/C 150 MIN.
FOR COVER 12mm DIA. REBARS REBAR
50 CLEAR 50 CLEAR
AND PAVING @ 300 C/C MAX. (SEE TABLE)
(TYP.)
.. . .. ... . .... .
.
.... ...
.
. .
. . .. . . .
.
. ....
.. .. .
. .
.. .. .
. . .. . . . . . . ... .
. . . .. . ... .. .. ........ .. . ...... .. .. . . ...... SCALE:
. . . . . . .. . . .
.
.. . . ..... ...
. .. .. . . ..
. .. ..... ... ..
.. . . ... .
A
FILL
A
. .
. . .... ... . .. . .. . . .. . ..
.. .... . . ..
.
..... . . . . . .. .... .
. ..... . .
. . ..
.. . . .
. . .. . . . . ..
. .
..
.
.
.
.. .
. . . .. .
50 CLEAR
. . ... . . .. . ...
.
.. .
. R=32 .. . .
REVISION VALIDATION
. . . . . .. . . . . .
. .
75
. 75 .
25 CLEARANCE
. . ... . . . . . . ...
(TYP.)
. .. . .
25 CLEARANCE
.. THIS REVISION NO. 04 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
. . . . . . . .
75
.. .. . . . . .. . .
. . .
. . . ... REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
. FILL
.. .. ..
. . FILL .. .. . .
. . . . . . .. . 30027516-0522-013
. . .. . .
.. . . . .. . ... . . . .. . ..
. .
. ..
. . .. . . .
.
. .. . .
... ... DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
. . . . . . (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
. ..... . ..... .
..
...
..
...
.....
..
.
..
.
..
.
.
.
..
..
. ... .
..
...
...
.....
..
..
.
..
.
..
.
.
.
...
. . .. CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
..
... .. .
.
....
. . .
.
... ....
....
. . ENGG./DATE
.. ..
... ROCK ... MAK KMM MSK KMM
ROCK ... .. . ... 05/24/22 05/24/22 05/24/22 05/24/22
.
... .. .. .. REV.NO. DATE REVISION DESCRIPTION
. .. .. .. ..
.. . ... . .. . ... .
. . . . . . 04 05/22/22 REVISION UPDATE
.
....
. .. .
....
. ..
.
.
. .
.
.
JOB ORDER/EWO NO.
150
150
B B
30027516 CONSTRUCTION UNTIL CERTIFIED AND DATED
50-60 450 300 25mm DIA. AT 150 C/C 22-28 250 220 20mm DIA. AT 150 C/C
990 L AC-036660 003 04
Saudi Aramco 2635 ENG. (05/05)