ANNUAL CAPACITY TEST PROCEDURE


Ref: Section 8.4 of PPA and Schedule-5 of O&M Agreement

Owner

FOUNDATION POWER COMPANY (DAHARKI) LTD.

Company NAME DESIGNATION SIGNATURE

NTDC

FPCDL

Date of Signature: …………………………..


======================================================================================================================

CONTENTS

1.0 Introduction

…………………………………………………………………………. 03

2.0 Execution and Responsibility of the Test …………………………………….

……… 03

3.0 Test Acceptance Criteria

……………………………………………………………. 03

4.0 Pre-Test Requirement

……………………………………………………………….. 03

5.0 Data Collection

……………………………………………………………………… 03

6.0 Computation of Test Result


…………………………………………………….......... 04

6.1 Preliminary Result


…………………………………………………………………...
04

6.2 Final Official Result


………………………………………………………………….
04

7.0 Attachments ……………………………………………………………………........ 04

7.1 Annual Capacity Test Data Sheet …………………………………………………… 05

7.2 Correction Curves ………………………………………………………………….. 06

7.3 Output Degradation Factors ………………………………………………………... 09

7.4 Test Witness Sheet …………………………………………………………………. 10

7.5 Interpolation Formula ………………………………………………………………. 11

7.6 Computation of Result …………………………………………………………......... 13


==========================================================================================================================================
Page 2 of 14
======================================================================================================================

==========================================================================================================================================
Page 3 of 14
======================================================================================================================

1.0 Introduction

The purpose of this test is to demonstrate the Annual Capacity Test (ACT) under PPA Article-VIII
Section 8.4, after Commercial Operation Date. During each Demonstration Period the test “Annual
Capacity Test” will be conducted to determine the Tested Capacity of the Complex. Net Power Output
will be measured at the interconnection point (Tariff Meter) and will be corrected to following reference
conditions:

a) Ambient Air Temperature 27 oC


b) Relative Humidity 52 %
c) Barometric Pressure 1.0047 bar

2.0 Execution and Responsibility of the Test

The “Annual Capacity Test” will be performed during demonstration period each Operating Year. The
test period will be of six (6) continuous hours using existing tariff metering system and plant
instrumentation for measurements.

The measurement values will be corrected to reference conditions by means of correction curves. The
NTDC team will witness the test.

Manual log sheets and Plant DCS system will collect test data. Hard copies of DCS printouts as per
requirements will be collected at the end of the test and will be countersigned for validation by all parties.

FPCDL will be responsible for the test coordination with NTDC and to organize a testing team
satisfactory to all parties. This is also to be ensured that the required test instrumentation, consisting of
permanent plant equipment is properly calibrated before the start of test.

3.0 Test Acceptance Criteria

The test will be deemed successful if, after the application of the correction to the reference conditions,
Ambient Air Temperature (27oC), Relative Humidity (52%), Barometric Pressure (1.0047 bar). The Net
Output is as per “Output Degradation Factor” table (attached). Either party will have the right to reject the
test within 24 hours in accordance with the PPA Section 8.4 (e).

4.0 Pre-Test Requirement

 The test procedure agreed/singed by NTDC, FPCDL


 Plant on base load operation
 Fire Fighting system ready for operation
 Emergency Lube Oil Pump and Emergency Power Supply on standby
 Escape routes marked and cleared
 Entry of unauthorized persons will be prohibited

5.0 Data Collection


 DCS Logs / Trends
 Main Tariff Meter Manual Readings
 Ambient Condition Readings (DCS/Manual)

==========================================================================================================================================
Page 4 of 14
======================================================================================================================
6.0 Computation of Test Result

The measured average Net Power Output will be corrected with reference operating conditions according
to correction curves provided in Attachment 8.2, the corrected Net Power Output will be determined as
follows:

PC=PM / (F1 x F2 x F3)

Where,
PC Corrected Net Power Output
PM Measured Net Power Output
F1 Correction Factor for ambient air pressure at test condition
F2 Correction Factor for ambient air temperature at test condition
F3 Correction Factor for relative humidity at test condition

The average value of six (6) hours of measured Net Power Output will be corrected and will be taken as
final determination of ACT value.
Note: The interpolation formula will be used to determine the correction factor for the relative humidity.

6.1 Preliminary Results

At the end of test, on site a calculation to obtain preliminary results will be carried out within 24 hours.
This calculation involves an analysis to find out observer errors, instrument errors or failures and other
causes to repeat the test.

6.2 Final Official Result

The definitive results, appearing in the Official Report, will be available after the official analysis of test
data and results.
Note: Copies of the Test Report will be submitted to NTDC for approval.

7.0 Attachments

7.1 Annual Capacity Test Data Sheet


7.2 Correction Curves
7.2.1 Effect of Ambient Temp on CC Net Power Output
7.2.2 Effect of Ambient Pressure on CC Net Power Output
7.2.3 Effect of Relative Humidity on CC Net Power Output
7.3 Output Degradation Factors
7.4 Test Witness Sheet
7.5 Interpolation Formula
7.6 Computation of Result
7.6.1 Annual Capacity Test (Data Sheet)
7.6.2 Annual Capacity Test (Corrected Net Output)

==========================================================================================================================================
Page 5 of 14
======================================================================================================================

7.1 Annual Capacity Test Data Sheet

ANNUAL CAPACITY TEST


DATA SHEET

Test Unit: Foundation Power Plant Data Logger:


Sheet for: Main Tariff Meter Time Interval: 1 hour
Test Date: Location: AIS
Time Net Power Output (kWh) Net Power Output (kVARh)

Company NAME DESIGNATION SIGNATURE


NTDC

FPCDL

7.2 Correction Curves


7.2.1 Effect of Ambient Temp on CC Net Power Output
==========================================================================================================================================
Page 6 of 14
======================================================================================================================

==========================================================================================================================================
Page 7 of 14
======================================================================================================================

7.2.2 Effect of Ambient Pressure on CC Net Power Output

==========================================================================================================================================
Page 8 of 14
======================================================================================================================

7.2.3 Effect of Relative Humidity on CC Net Power Output

==========================================================================================================================================
Page 9 of 14
======================================================================================================================

7.3 Output Degradation Factors

==========================================================================================================================================
Page 10 of 14
======================================================================================================================

7.4 Test Witness Sheet

TEST WITNESS SHEET

Test Name: ANNUAL CAPACITY TEST Date:

PPA Reference: PPA Article 8.4


Test Type: Determination of Annual Tested Capacity
Reading Station: Foundation Power Plant Daharki Ltd.

Start End Interval


Test Time:

Test Witnessed by Name Designation Signature


NTDC

NTDC

FPCDL

FPCDL

==========================================================================================================================================
Page 11 of 14
======================================================================================================================

7.5 Interpolation Formula

Plot of the data with linear interpolation superimposed

To determine the value between two points, one of the simplest methods is linear interpolation (sometimes
known as lerp). Consider the above example of determining f (2.5). Since 2.5 is midway between 2 and 3, it
is reasonable to take f (2.5) midway between f (2) = 0.9093 and f (3) = 0.1411, which yields 0.5252.

Generally, linear interpolation takes two data points, say (xa,ya) and (xb,yb), and the interpolate is given by:

at the point (x,y)

==========================================================================================================================================
Page 12 of 14
======================================================================================================================

7.6 Computation of Result


7.6.1 Annual Capacity Test (Data Sheet)

Data Sheet
ANNUAL CAPACITY TEST
Time duration: every 15 minutes

Ambient Pressure Ambient Air Ambient Air


Time Relative Humidity (%)
(mbar) Temperature (oF) Temperature (oC)

Average

==========================================================================================================================================
Page 13 of 14
======================================================================================================================
7.6.2 Annual Capacity Test (Corrected Net Output)

Annual Capacity Test (Corrected Net Output)

Main Meter Amb Relative


Amb Air Amb Air
Time of Reading Reading Difference Temp (oF) Temp (oC)
Pressure Humidity
(MWh) (mbar) (%)

Initial Reading

1st Hour Reading

2nd Hour Reading

3rd Hour Reading

4th Hour Reading

5th Hour Reading

6th Hour Reading

Average

Average Amb Air Temp y=-0.0000002697100002*x3-0.000028817329184*x2-


(oC) 0.00311860133925*x+1.110096394574
Average Amb Pressure
(mbar) y=-0.091158475303018*x2+1.19237943937158*x-0.105966244075041
Average Relative y=-0.00763928504896*x2-0.018216088481829*x
Humidity (%) +1.01153802868779
Net Average Output (06
Over all correction factor
hrs)
Corrected Net Output @
Reference Conditions
(MW)

Company NAME DESIGNATION SIGNATURE

FPCDL

FPCDL

NTDC

NTDC

==========================================================================================================================================
Page 14 of 14