Excel Precast Sdn Bhd

Daily Production Schedule _ 1A


22-01 Kallang Whampoa C52 PRODUCTION PLAN DATE : #Name?
PLANT : #Name?

Panel Marking Serial No Qty Line No Mould No Volume Block Level Unit No Concrete Rebar Mesh Remark Casting Reason
(m3) Grade Grade Grade Yes No
1-FW1 17/46 1 SL2-Sub 1 0.723 152A L09 G40N R500B M500A
1HNPK-04 45/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
1HNPK-04 44/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
1HNPK-04 43/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
2-PT203 26/72 1 SL2-Sub 1 0.157 152A G40N R500B -
40PBU1A-01Y 1/15 1 SL4-EPSB 1 5.685 152A G40N R500B M500A
40PBU3-01X 11/11 1 SL4-EPSB 1 5.793 153A G40N R500B M500A
40PC2A-01 2/11 1 SL1-Sub 1 1.542 153A G40N R500B -
50KGW3 36/36 1 SL1-Sub 1 1.757 153A L19 G50N R500B M500A

PRECAST COMPONENTS VERIFICATION

No COMPANY DESIGNATION DATE SIGNATURE REMARK


PRODUCTION
01 EPSB
(ENGINEER / SUPERVISOR)

QAQC
02 EPSB
(ENGINEER / SUPERVISOR)

03 SUB-CONTRACTOR

Saturday, 11 May, 2024 Page 1 of 4


Panel Marking Serial No Qty Line No Mould No Volume Block Level Unit No Concrete Rebar Mesh Remark Casting Reason
(m3) Grade Grade Grade Yes No
50PC-KGW1X 14/16 1 SL3-Sub 1 3.124 152A G50N R500B M500A
50PC-KGW4 16/16 1 SL1-Sub 1 1.189 152A G50N R500B M500A 50pc-kgw4x(handed)
KPV-06 17/30 1 SL2-Sub 1 1.301 153A G40N R500B M500A
KPV-22 7/24 1 SL2-Sub 1 0.494 152A G40N R500B M500A
LSW1B-1-03 11/11 1 SL3-Sub 1 1.234 153A L18 G50N R500B M500B 1st CAST (0.681)
LSW1B-2-01 17/17 1 SL3-Sub 1 1.311 153A L18 G50N R500B M500B 1ST CAST(0.687)
LSW1B-3-03 11/11 1 SL3-Sub 1 1.562 153A L18 G50N R500B M500B 1st CAST (0.765)
LSW2B-2-03 11/11 1 SL3-Sub 1 1.207 153A L18 G50N R500B M500B 1ST CAST(0.654)
NPK03 12/15 1 SL1-Sub 1 0.990 152 G50N R500B M500A
NPK13 7/14 1 SL1-Sub 1 0.768 152 G50N R500B M500A
NPK18 3/6 1 SL1-Sub 1 0.428 152 G50N R500B M500A
NPK30 4/6 1 SL1-Sub 1 0.905 152 G50N R500B M500A
PD2-01 53/126 1 SL2-Sub 1 0.549 153A G40N R500B M500A
PSC11-02d 1/1 1 SL3-Sub 1 0.557 152A G50N R500B M500B 1st CAST (0.30) L8
PSC14-02X 12/12 1 SL3-Sub 1 0.803 152A G50N R500B M500B 2nd (0.415)

PRECAST COMPONENTS VERIFICATION

No COMPANY DESIGNATION DATE SIGNATURE REMARK


PRODUCTION
01 EPSB
(ENGINEER / SUPERVISOR)

QAQC
02 EPSB
(ENGINEER / SUPERVISOR)

03 SUB-CONTRACTOR

Saturday, 11 May, 2024 Page 2 of 4


Panel Marking Serial No Qty Line No Mould No Volume Block Level Unit No Concrete Rebar Mesh Remark Casting Reason
(m3) Grade Grade Grade Yes No
PSC1B-01 17/17 1 SL3-Sub 1 0.766 153A L18 G50N R500B M500B 1st CAST (0.412)
PSC406-03 11/11 1 SL3-Sub 1 0.827 153A L18 G50N R500B M500B 1ST CAST(0.553)
PSC8-02d 1/1 1 SL3-Sub 1 0.399 152A G50N R500B M500B 2ND ST(0.16) L8
PSW404-01 49/51 1 SL3-Sub 1 1.355 153A L18 G50N R500B M500B 1st Cast (0.69m3)
PSW404-01X 15/15 1 SL3-Sub 1 1.355 153A L18 G50N R500B M500B 1st Cast (0.69m3)
PSW406-1a-03X 9/9 1 SL3-Sub 1 1.315 153A G50N R500B M500B 1st CAST(0.733)
PSW406-1b-03 9/9 1 SL3-Sub 1 1.249 153A G50N R500B M500B 2ND CAST(0.533)L18
PSW406-2a-03X 9/9 1 SL3-Sub 1 1.992 153A G50N R500B M500B 2nd CAST (1.088)
PSW407-01 17/17 1 SL3-Sub 1 2.345 153A L18 G50N R500B M500B 2nd cast(1.088)
PSW409-03 9/9 1 SL3-Sub 1 1.149 153A L18 G50N R500B M500B 2nd CAST(0.53)
PSW409-03X 9/9 1 SL3-Sub 1 1.149 153A L18 G50N R500B M500B 1ST CAST(0.53)
SF-7N-17 3/10 1 SL2-Sub 1 0.875 152 G50N R500B -
SPSW2B-02 15/15 1 SL3-Sub 1 2.094 153A L18 G50N R500B M500B 1ST cast(0.98)

PRECAST COMPONENTS VERIFICATION

No COMPANY DESIGNATION DATE SIGNATURE REMARK


PRODUCTION
01 EPSB
(ENGINEER / SUPERVISOR)

QAQC
02 EPSB
(ENGINEER / SUPERVISOR)

03 SUB-CONTRACTOR

Saturday, 11 May, 2024 Page 3 of 4


Panel Marking Serial No Qty Line No Mould No Volume Block Level Unit No Concrete Rebar Mesh Remark Casting Reason
(m3) Grade Grade Grade Yes No

THEORETICAL CONCRETE VOLUME : 49.282 (m3)

ACTUAL CONCRETE VOLUME ORDERED : (m3)

(m3)

PRECAST COMPONENTS VERIFICATION

No COMPANY DESIGNATION DATE SIGNATURE REMARK


PRODUCTION
01 EPSB
(ENGINEER / SUPERVISOR)

QAQC
02 EPSB
(ENGINEER / SUPERVISOR)

03 SUB-CONTRACTOR

Saturday, 11 May, 2024 Page 4 of 4