Panel Marking Serial No Qty Line No Mould No Volume Block Level Unit No Concrete Rebar Mesh Remark Casting Reason
(m3) Grade Grade Grade Yes No
1-FW1 17/46 1 SL2-Sub 1 0.723 152A L09 G40N R500B M500A
1HNPK-04 45/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
1HNPK-04 44/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
1HNPK-04 43/138 1 SL2-Sub 1 0.111 152A G50N R500B M500A
2-PT203 26/72 1 SL2-Sub 1 0.157 152A G40N R500B -
40PBU1A-01Y 1/15 1 SL4-EPSB 1 5.685 152A G40N R500B M500A
40PBU3-01X 11/11 1 SL4-EPSB 1 5.793 153A G40N R500B M500A
40PC2A-01 2/11 1 SL1-Sub 1 1.542 153A G40N R500B -
50KGW3 36/36 1 SL1-Sub 1 1.757 153A L19 G50N R500B M500A