Professional Documents
Culture Documents
1577 BOQ Piling
1577 BOQ Piling
BOQ
Rate in Figures
Sl.No. Description Unit Qty Rate in Words Amount in Rs.
(Rs.)
1 Construction of 600 mm nominal dia. Reinforced concrete cast-in-
situ bored piles with rig machine or by cutter including M-25 grade
of cement concrete inclusive of all materials labour, tools and
plants and special machinery, layout of works, shifting & installation
of boring equipment/plants from one pile location to another
including bentonite solution in pile bore under unstable and or high
water soluble soil condition for retaining shape of bore, 5 kg. of RM 400
bentonite will be used in 100 litres, clear water excluding cost of
reinforcement cage as per specifications and drawings required for
proper completion of work as per drawing, specifications and
direction of Engineer-in-charge.
Total