11. ALL WORKS SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF
ACCEPTANCE.
12. THE AIR CONDITIONING AND VENTILATION SYSTEM SHOULD BE PROPERLY BALANCE BY A
SEPARATE CONTRACTOR AND TO SUBMIT BALANCING REPORT FOR EVALUATION (BY
TENANT'S CONTRACTOR).
13. THIS CONTRACTOR SHOULD COORDINATE HIS WORKS CLOSELY WITH THE WORKS OF OTHER
TRADES. PROVISION FOR THE PIPE PASSAGES THRU WALLS SHALL BE COORDINATED IN
ADVANCE WITH THE BUILDING CONT'R. FAILURE ON THE PART OF THIS TO MAKE SUCH
PROVISION IN ADVANCE SHALL MEAN PROVIDING THEM LATER AT HIS OWN EXPENSE.
14. ALL PIPING PASSING ABOVE THE CEILING LEVEL SHOULD BE PROPERLY BRACKETED.
15. P-TRAP IS NEEDED FOR CONDENSATE DRAINPIPE.
16. USE TH MM2 LEAD FREE CONDUCTOR FROM INDOOR TO OUTDOOR ALOOWED & PROVIDE
JUNCTION BOX IF NECESSARY.
17. USE L.T. FLEXIBLE CONDUIT FOR OUTDOOR UNIT, HOWEVER IF EMT IS APPLY APPROVED
SEALANT AT EVERY JOINT OF EMT.
18. IN CASE MAXIMUM REFRIGERANT PIPE LENGTHS ARE EXCEEDED, CONSULT AND/OR VERIFY
MANUFACTURER FOR REFRIGERANT PIPE SIZES CONSIDERING FRICTION LOSSES DUE TO
DISTANCE, ELEVATION, ETC.
1 G E N E R A L N O T E S
M 1 SCALE NTS
A B C D E F G H I J
60000
1
6000
9000
2
9000
3
6000
4
9000
5
75000 9000
42000
6
9000
7
9000
8
9000
9
6000
10
60000
1
6000
9000
2
9000
3
6000
4
9000
5
9000
75000
42000
6
9000
7
9000
8
9000
9
6000
10
60000
1
9000
2 SLOP SINK
3000
9000 3000
3000
3 3000
6000
3000
4 3000
3000
9000
3000
5 2000
2500
9000
2500
2000
6
2000
2500
9000
2500
2000
7
2000
2500
9000
2500
2000
8
9000
9
6000
10
60000
1
9000
2
3000
9000 3000
3000
3 3000
6000
3000
4 3000
3000
9000
3000
5
3000
3000
9000
3000
6
3000
3000
9000
3000
7 3000
9000 3000
3000
8
3000
9000
3000
3000
9
MEN WOMEN
6000
10
60000
1
9000
2
9000
3
6000
4
9000
5
75000 9000
6
9000
7
9000
8
9000
9
6000
10
ELEVATORS: 1 UNIT
SPEED: 120 m/min 1.10 R1 1.10
0.40 0.40
PLAFON PLAFON
0.77
2.30
0.92
6.12 6.12
4.90
1.83
R21.00
30°
1.10 1.01 1.10
0.31 1.54
E
1.60
RAILING
Schindler
E A B C D
Schindler
15.26
METAL COVER
TOP VIEW
ROTATION
VITROFLOOR 10mm
175 175 GAP AROUND FLOOR PLATE
FLOOR LIMIT SHARING
6 7/8" 6 7/8"
TO BE FILLED WITH ELASTIC STEP
10 10 FILLED AFTER MOBILE INSTALLATION
3/8"
3/8" FINISH VITROFLOOR
GAP TO CLOSE
FFL FLOOR PLATE
WELDED MESH
GAP TO CLOSE FFL
5 5/16"
5 5/16"
135
135
Q DECKING
20 A + 500mm
ENTRANCE FOR ELECTRICITY AND LIGHT SUPPLY
7/8" A + 19-11/16"
35
40
40
1 9/16"
TRUSS
COUNTERWEIGHT
SHOCK ABSORBERS