GENERAL NOTES

1. CONTRACTOR IS ADVISED TO HAVE AN ACTUAL SURVEY OF THE EXISTING CONDITION AT SITE.


2. ALL EQUIPMENT SHALL BE INSTALLED IN APPROXIMATE LOCATION AS SHOWN ON THE PLANS.
3. CONTRACTOR MUST SUBMIT SHOP DRAWINGS INDICATING ACTUAL EQUIPMENT DIMENSION AND
OPERATING WEIGHTS. SUFFICIENT CLEARANCES TO FACILITATE NORMAL SERVICES &
MAINTENANCE WORKS ARE PROVIDED IN THIS DESIGN PLANS. HOWEVER, SHOULD ACTUAL
EQUIPMENT PHYSICAL SIZES DIFFER CONSIDERABLY FROM THOSE SHOWN IN THE PLANS, THE
CONTRACTOR SHOULD NOTIFY THE ARCHITECT OR DESIGN ENGINEER IMMEDIATELY IN WRITING.
4. ALL EQUIPMENT SHALL BE SET ON 150MM THICK, LEVEL REINFORCED STEEL BASE, UNLESS
OTHERWISE SPECIFIED. (FOR FLOOR MOUNTED EQUIPMENT)
5. ALL EQUIPMENT SHALL BE MOUNTED ON OR SUPPORTED BY VIBRATION ISOLATOR OR
ASSEMBLIES.
6.ALL AC UNIT CEILING CONCEALED SHALL HAVE SERVICE ACCESS TO BE PROVIDED BY THE
CIVIL CONTRACTOR.
7. ALL PIPING SHALL BE LEAK TESTED WITH A PRESSURE OF AT LEAST 1 1/2 TIMES THE DESIGN
WORKING PRESSURE (24 HOURS).

8. ALL MATERIALS SHALL BE NEW & CLEAN.


9. DEVIATIONS AND REVISIONS FROM THE PLANS SHALL BE REFERRED TO THE ARCHITECTS FOR
REVIEW AND APPROVAL.
10. ALL NECESSARY GOVERMENT PERMITS SHALL BE SECURED AND BORNE BY THIS
CONTRACTOR.

11. ALL WORKS SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF
ACCEPTANCE.
12. THE AIR CONDITIONING AND VENTILATION SYSTEM SHOULD BE PROPERLY BALANCE BY A
SEPARATE CONTRACTOR AND TO SUBMIT BALANCING REPORT FOR EVALUATION (BY
TENANT'S CONTRACTOR).
13. THIS CONTRACTOR SHOULD COORDINATE HIS WORKS CLOSELY WITH THE WORKS OF OTHER
TRADES. PROVISION FOR THE PIPE PASSAGES THRU WALLS SHALL BE COORDINATED IN
ADVANCE WITH THE BUILDING CONT'R. FAILURE ON THE PART OF THIS TO MAKE SUCH
PROVISION IN ADVANCE SHALL MEAN PROVIDING THEM LATER AT HIS OWN EXPENSE.
14. ALL PIPING PASSING ABOVE THE CEILING LEVEL SHOULD BE PROPERLY BRACKETED.
15. P-TRAP IS NEEDED FOR CONDENSATE DRAINPIPE.

16. USE TH MM2 LEAD FREE CONDUCTOR FROM INDOOR TO OUTDOOR ALOOWED & PROVIDE
JUNCTION BOX IF NECESSARY.
17. USE L.T. FLEXIBLE CONDUIT FOR OUTDOOR UNIT, HOWEVER IF EMT IS APPLY APPROVED
SEALANT AT EVERY JOINT OF EMT.
18. IN CASE MAXIMUM REFRIGERANT PIPE LENGTHS ARE EXCEEDED, CONSULT AND/OR VERIFY
MANUFACTURER FOR REFRIGERANT PIPE SIZES CONSIDERING FRICTION LOSSES DUE TO
DISTANCE, ELEVATION, ETC.

1 G E N E R A L N O T E S
M 1 SCALE NTS
A B C D E F G H I J

60000

6000 6000 9000 6000 6000 6000 9000 6000 6000

1
6000

9000

2
9000

3
6000

4
9000

5
75000 9000

42000

6
9000

7
9000

8
9000

9
6000

10

1 GROUND FLOOR MECHANICAL LAYOUT PLAN


M 2 SCALE 1:600 MTS
A B C D E F G H I J

60000

6000 6000 9000 6000 6000 6000 9000 6000 6000

1
6000

9000

2
9000

3
6000

4
9000

5
9000
75000

42000

6
9000

7
9000

8
9000

9
6000

10

1 SECOND FLOOR MECHANICAL LAYOUT PLAN


M 3 SCALE 1:600 MTS
A B C D E F G H I J

60000

6000 6000 9000 6000 6000 6000 9000 6000 6000

1
9000

2 SLOP SINK
3000

9000 3000

3000

3 3000
6000

3000

4 3000

3000
9000

3000

5 2000
2500

9000

2500
2000

6
2000

2500

9000
2500

2000

7
2000

2500

9000
2500

2000

8
9000

9
6000

10

1 THIRD FLOOR MECHANICAL LAYOUT PLAN


M 4 SCALE 1:600 MTS
A B C D E F G H I J

60000

6000 6000 9000 6000 6000 6000 9000 6000 6000

1
9000

2
3000

9000 3000

3000

3 3000
6000

3000

4 3000

3000
9000

3000

5
3000
3000

9000
3000

6
3000
3000

9000
3000

7 3000

9000 3000

3000

8
3000
9000

3000
3000

9
MEN WOMEN
6000

10

1 FOURTH FLOOR MECHANICAL LAYOUT PLAN


M 5 SCALE 1:600 MTS
A B C D E F G H I J

60000

6000 6000 9000 6000 6000 6000 9000 6000 6000

1
9000

2
9000

3
6000

4
9000

5
75000 9000

6
9000

7
9000

8
9000

9
6000

10

1 ROOF DECK MECHANICAL LAYOUT PLAN


M 6 SCALE 1:600 MTS
D
1.54
C
1.24
B
1.16
A
1.00
2.17 2.60

ELEVATORS: 1 UNIT
SPEED: 120 m/min 1.10 R1 1.10

CAPACITY: 5 PEOPLE 0.18


0.60 2.26
0.18
0.60

0.40 0.40

PLAFON PLAFON
0.77
2.30

0.92
6.12 6.12
4.90

1.83

R21.00

30°
1.10 1.01 1.10

0.31 1.54
E
1.60

4.30 0.36 FRONT VIEW


RIGHT SIDE VIEW
0.18 DETAIL OF STEPS
RAILING DETAIL
151 C

RAILING
Schindler

E A B C D
Schindler

1.60 1.00 1.16 1.24 1.54

4.30 ACRYLIC PLATE

15.26
METAL COVER

TOP VIEW
ROTATION

VITROFLOOR 10mm
175 175 GAP AROUND FLOOR PLATE
FLOOR LIMIT SHARING
6 7/8" 6 7/8"
TO BE FILLED WITH ELASTIC STEP
10 10 FILLED AFTER MOBILE INSTALLATION
3/8"
3/8" FINISH VITROFLOOR
GAP TO CLOSE
FFL FLOOR PLATE
WELDED MESH
GAP TO CLOSE FFL
5 5/16"

5 5/16"
135

135

Q DECKING

20 A + 500mm
ENTRANCE FOR ELECTRICITY AND LIGHT SUPPLY
7/8" A + 19-11/16"
35
40
40
1 9/16"
TRUSS

TOP ANCHOR DETAIL LOWER ANCHOR DETAIL N.T.S.

COUNTERWEIGHT

SHOCK ABSORBERS

1 ELEVATOR & ESCALATOR DETAILS


M 7 SCALE NTS