Task Target
Planned action Planned outcome Time estimated Criterion
number completion date
1 Receive
Interview 1 with information about
30 minutes March 3rd A
Ms. Jaya the issue she is
facing
2 Listen to the
Producing a
interview again to
problem 30 minutes March 3rd A
produce a problem
statement
statement
3 Determine a
general course of
Abstract rationale
action for product
for a proposed 1 hour March 5th A
development and
product
the questions to
ask in interview 2
4 Produce questions
that are relevant
Preparation for to the proposed
30 Minutes March 6th A
Interview 2 solution and
questions in
general
5 Discuss the
proposed solution
Interview 2 with curtly and receive
30 Minutes March 8th A
Ms. Jaya information about
computer
specifics, etc.
6 Determine the
specifics and
Concrete whether the
Rationale for the initially proposed 1 hour March 9th A
proposed solution solution is suitable
for the specified
problem
7 Using the
Determining interviews 1 and 2
1 hour March 9th A
Success Criteria formulate a list of
success criterion
9 To visualize and
Data Flow improving the flow
1 hour March 13th B
Diagrams of data within the
proposed solution
10 Determining the
Ethical
ethicality of the 5 minutes March 13th B
Considerations
planned data flow
11 Planning the
authorization and
Backend Design authentication for 30 minutes March 20th B
data access and
storage planning
12 Developing a
prototype UI to
Front End
test the best
Prototyping/ 1 hour March 21st B
design for optimal
Design
useability and
efficiency
13 Using the
information from
UI Design the prototype to 30 minutes March 21st B
develop a better
UI
15 Producing a
chronological plan
Record of tasks for the progress of 1 hour March 23rd B
developing the
solution and the IA
16 By either building
on the prototype
or making it from
Finishing the UI 2 hours March 23rd C
scratch produce a
useable and
optimal UI
19 Back-end
algorithm Theoretically
development: developed the
core algorithm
Produce the that will determine
algorithm that will 2 hours March 28th C
the number of
calculate the man hours Ms.
number of man Jaya has worked
hours from a on the project
given project
21 Back end
development:
Connected all
Connection of the parts of the
algorithm 1 hour March 28th C
backend together
implementation functionally
to the project
storage
22 Develop the
Back-end implementation to
development: produce and send
Implementation signed receipts to
3 hours March 29th C
of data the customer, and
visualization / the periodic data
receipt production visualization
method
24 Commence and
record data for the
Testing 1 hour April 2nd C
testing from test
plan
26 Describing the
complex
Description of the techniques and
complex applied and 2 hours April 3rd C
techniques providing
examples of its
application.
27 Evaluating and
Reading/Spell
correcting the 15 minutes April 3rd C
Checking
documentation
28 Recording a video
Showcasing the of the product
working and 30 minutes April 4th D
solution
passing the
success criteria, as
well as highlighting
extensibility
30 Evaluation of the
passing of the
Address Success success criteria
Criteria Evaluation and the possible 30 Minutes April 16th E
and extensibility improvements/ext
ensions for the
product