Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TOMAS CLAUDIO COLLEGES

Taghangin, Morong, Rizal

BACHELOR OF SCIENCE IN COMPUTER SCIENCE


Level II First Reaccreditation Visit
COMPLIANCE REPORT

AREA. IV. LABORATORIES


Opportunities for
Improvement Recommendations Action Taken Team Verification
1. A laboratory 1. A laboratory 1.to follow after all the 1.
development plan for development plan computer laboratory
upgrading and should be prepared, to rooms ongoing
improving the current ensure continuous renovations and
equipment and upgrading of the improvements are
practices in the computer laboratories completed.
computer laboratories and to improve its
was not prepared. current
practices/systems.

2. Sets of evidence of 2. Faculty members must 2. Engr. Meynard H.


regular training and be provided relevant Samson, CCS
seminar on laboratory seminars and trainings, Professor has
safety for faculty and to equip them with skills successfully
students were not on laboratory safety. completed Modules 1-
available. Subsequently, they 6 of DOLE’s Basic
could orient their Occupational Safety
students on safety and Health (BOSH)
during their laboratory for Safe Officer
class. 1(SO1). Included E-
TESDA Computer
Systems Servicing II
and conducted
Laboratory Safety
Orientations in his
laboratory class for
CS23 Computer
Networks and
Communications from
2020-2023.
3. Computers were not 3. Computers should be 3.for follow up 3.
networked, and networked with internet approval of TCC
internet access was access in the computer President for the
not available in the laboratories to help the Request Letter on
computer laboratories. faculty members in Network Connectivity
providing substantial and Internet Access in
support to instruction. All Computer
Laboratory Rooms

4. In case of breakdown 4. Additional functional 4. for update once 4.


of computers in the computer units should renovation is
laboratory, computer be made available, in completed. Will use
equipment, supplies, or case of breakdown of Internet Lab room as
materials were computers in the source of back up
inadequate. computer laboratory, to computer units.
ensure continuous
process of learning.

5. Noted was the limited 5. The bandwidth of the 5. Provision of new 5.


wifi bandwidth in the internet connection internet subscription
campus should be increased, to service/plan I-Gate –
make it sufficient for the PLDT’s premium
academic community. internet gateway
This would aid faculty service that provides
members, non-teaching fast, reliable and
personnel, and students managed highspeed
to access worldwide connectivity to the
resources. Global Internet last
July 2022. (prev.
Globe Leased Line
50Mbps)

You might also like