Zorn;1 4~lwu~ ~i;JJ4b~

O:'.::/;o,cCo,,,!:ri'JI'(,OI. ZAl\1IL O'FFSHORE SERVICES COMPANY


OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATIOI\l
AND COMISSIONING SUPPORT
(CONTRACT: 6600044802)

TOOL BOX TALK


Location: Zamil-406 Date: 20-Nov-2020

Start Time: 09.00 AM


~M~'LAMI1--A-ob- C0/tJ·-ool5"
Meeting Duration: so Minutes N umber of Attendees: 04

Topics Discussed:

SAUDI ARAMCO REFERENCE STANDRAD: SAES-H-004


Surface Preparation (Before Blasting)

PARTICIPANTS

51. Z a mil Emp, Aramco ID / Name of Attendee Position SignatW'e


No. # IQAMA
~

1
61915 7073267 Maqsood Alam Blaster /Painter ~
2

3
61230 8833955
Joseph Rocello
Cornejo
Blaster /Painter
for
(//
4

QC Inspector: QC Supervisor
Name: TJUSTIN RAJ / YONOS All Name:

Discipline: WELDING INSPECTOR Discipline:

Signature: \f~ fJ)i- ~ Signature:

TBT Lo!! No: Mech-OOS


APPENDIX-I

Surface Preparation of Base Material of Structural


1. The type of abrasive to be used shall be determined by the degree of cleanliness and surface
profile requirements.
2. When required, solvent cleaning shall be carried out in accordance with SSPC-SP1. Do not use
kerosene, diesel or other degreasers that leave an oily film unless the surface is subsequently
cleaned with a non-greasy solvent or cleaner such M/N 1000186759,and
1000022130/1000022131.
3. The reference standards for surface preparation are ISO 8501, ISO 8502, ISO 8503, ISO 8504
and SSPC-SP surface preparation standards.
4. The reference standard for profile measurement shall be the Replica Tape Method according
to ISO 8503-5. This does not preclude the use of other techniques, provided that these give
similar measurable profile values in microns . Surface comparators are not acceptable
5. Compressed air supply equipment, hoses and fittings shall be free of oil, moisture and
contamination. The inspector shall check and approve the air quality at the start and mid-point
of each 8-hour period. This shall be conducted and determined as follows:
6. The Operational remote control valve (Dead-man) shall be securely attached to the nozzle.
Minimum nozzle pressure acceptable for blasting steel shall be 620 kPa (90 psig) measured at
the nozzle side .
7. High intensity floodlight or spotlights shall be installed in tanks and vessels for inspection
purposes .
8. Sufficient dust suction blowers (exhaust fans) shall be fitted adequately to remove dust and
fine blasting debris during the blasting operation.
9. Ultra high pressure water jetting (cleaning) is acceptable to prepare previously blasted
equipment in accordance with SSPC-SP WJ-l/ NACE WJ-1 and SSPC-SP WJ-2/ NACE WJ -2. Water
jetting cleaning does not create profile, but restores the existing profile.

TBT Loe- No : Mech-OOS Pae-e 2