ZAMIL OFFSHORE SERVICES COMPANY
=
OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION
AND COMISSIONING SUPPORT
(CONTRACT: 6600044802}

TOOL BOX TALK


Location: Zamil-406 Date: 14-1-2021

Start Time: 08.30 AM TBT Log No : TBQM-ZAMIL-406-


COAT-011

Meeting Duration: 30 Minutes Number of Attendees: 03

Topics Discussed:

SAUDI ARAMCO REFERENCE STANDRAD: SAES-H-001


Equipment Hazards and Equipment Cleaning
PARTICIPANTS

Sl. Zamil Emp. Aramco ID I Name of Attendee Position Signature


No. # IQAMA

1
63185 2161136284 Jainul Rain Blaster /Painter
?
2
61922 8904114 Ronnie Centeno
Gen . Supervisor ~ ) ~~ --
~~~· -pv

3
61915 7073267 Maqsood Alam
Coating crew
Supervisor r$2
4

'--
QC Inspector: QC Supervisor
Name: ABDUR RAHMAN Name :

Discipline : QC COATING INSPECTOR Discipline :

Clf
Signature: Signature:

TBT Log No: TBQM-ZAMIL-406-COAT-011 Page 1


APPENDIX-I

Equipment Hazards and Equipment Cleaning

1. Electrically driven power tools shall be properly grounded to prevent shock.


2. Power equipment shall be operated at the speeds recommended by the manufacturer and
shall have proper safety guards.
3. Hearing protection shall always be worn whenever chipping guns or pneumatic hammers are
in use.
4. Vessels such as air receivers that are used as a surge tank between the compressor and the
blasting pot shall be manufactured and stamped in accordance w ith international Norms,
Unfired Pressure Vessels. These shall be hydro-tested at a pressure of at least 1.73 MPa (250
psig) at ambient temperature using clean water. These vessels shall be revalidated by hydro-
testing by a Saudi Aramco approved agency at least annually and the test certificates shall be
submitted to the Saudi Aramco Inspector for verification .
5. All measuring devices and safety equipment like pressure relief valves, gauges, and devices
(but not limited to these) shall be calibrated by Saudi Aramco approved 3rd party agency and
the report shall be submitted to Saudi Aramco Inspector fo r verification .
6. Blasting shall be equipped with a remote control shut-off ofthe " deadman" variety.
7. The blast nozzle shall be electrically connected to an external ground in order to prevent
static electrical discharges or shocks to operating personnel. Grounding wire shall be AWG-4 or
larger.
8. The blast cleaning hose shall be of the standard static dissipating type with external couplings,
proper stamping, in good condition and without any damage. Safety whip check (safety wire)
shall be provided to high pressure line couplings .
9. Respirable air-fed abrasive blasting hoods and OSHA-approved in-line respirable air filters
shall be utilized at all times by abrasive blasting personnel.
10. Compressor hoses, air lines, and blast hoses shall be pinned at each coupling and chlorinated
hydrocarbons shall not be used .
11. Hearing protection shall be worn in confined spaces where abrasive blast clean ing is in
progress.
12. Benzene, gasoline, carbon tetrachloride, and chlorinated hydrocarbons shall not be used .
13. Coating preparation and equipment cleaning shall be performed under the supervision of
the coating crew supervisor. Coatings shall be mixed in an open area or in an adequately
ventilated area . Use eye protection (gogglesL respirators, protective gloves and other safety
equipment.
14. Electrically driven power mixers shall be grounded .
15. Avoid splash or spillage during mixing. Clean spilled paints immediately using proper
cleaning solvent.

TBT Log No: TBQM-ZAMIL-406-COAT-011 Page 2


(Y)
Q)
b.()
"'
0...
LU
u
z
LU
c
>
LU
,.....
,.....
LU 0
I
> ~-
i= ~
u 0
-
LU
l::tl
0
C,)
co
0
~

I
I
~
~
~
~
NI
~
~
~
~
0
z
OJ)
0
....J
E-
co
E-

You might also like