Report Civil
Report Civil
Abstract...................................................................................................................................................2
1.Introduction.........................................................................................................................................3
2. Training Experience...........................................................................................................................5
2.1 Safety Protocols and Site Orientation........................................................................................5
2.2 Surveying and Site Layout..........................................................................................................8
2.3 Material Testing and Quality Control......................................................................................10
2.4 Construction Activities..............................................................................................................13
2.4.1 Concrete Pouring Operations............................................................................................13
2.4.2 Formwork Installation.......................................................................................................14
2.4.3 Reinforcement Detailing.....................................................................................................15
2.4.4 Installation of Drainage Systems.......................................................................................16
2.4.5 Additional Construction Activities....................................................................................17
2.5 Inspections and Testing.............................................................................................................17
2.5.1 Structural Inspections........................................................................................................18
2.5.2 Pile Load Testing.................................................................................................................18
2.5.3 Hydrostatic Pressure Testing.............................................................................................19
2.5.4 Additional Inspection and Testing Activities....................................................................20
2.5.5 Importance of Continuous Monitoring and Quality Control.........................................21
2.6 Learning Sessions and Workshops...........................................................................................22
3. Conclusion........................................................................................................................................23
List of figures
Figure 1: Reinforcement........................................................................................................................16
Figure 2: Pile Load Testing....................................................................................................................19
Abstract
In this report I would like to talk about my summer training in YAMCO Company and whose
activities which I attended as a trainer in summer holiday.
The report will contain what I saw in the construction site from Formwork Installation,
Reinforcement and Pile Load Testing
This report will talk about my knowledge which I got from the construction site and based on
my studying civil engineering.
1.Introduction
Civil engineering, as a discipline, encompasses the fundamental pillars of infrastructure
theoretical principles and real-world applications, shaping the physical landscape of our
society. The internship at YAMCO provided a profound opportunity to delve into the practical
and challenges.
At the onset of the internship, I was greeted with the resounding ethos of safety and
the highest standards of safety on construction sites was evident from the comprehensive
safety protocols and rigorous orientation sessions. Learning about the significance of personal
construction industry. These foundational principles set the stage for a transformative
the diverse facets of civil engineering. From the meticulous intricacies of surveying
techniques to the intricate artistry of concrete pouring and formwork installation, each day
presented a new canvas upon which to paint the tapestry of practical knowledge. Engaging in
material testing, construction activities, and quality assurance tasks offered invaluable
insights into the intricacies of project execution and management. Moreover, the opportunity
to participate in structural inspections, pile load tests, and other quality assurance activities
instilled a profound appreciation for the meticulous attention to detail required in ensuring the
deeper exploration of theoretical concepts and industry best practices through learning
sessions and workshops. Topics ranging from safety and risk management to project planning
and technical skills development were meticulously curated to augment practical experiences
multifaceted nature of civil engineering practice and its implications for sustainable
infrastructure development.
experience, serving as a crucible for personal and professional growth. The culmination of
hands-on fieldwork, theoretical exploration, and mentorship from seasoned professionals has
equipped me with a robust foundation upon which to build a fulfilling career in civil
engineering. This report endeavors to encapsulate the myriad experiences, insights, and
lessons gleaned during the internship, serving as a testament to the transformative power of
company's safety culture. Safety is a cornerstone of all construction activities, and YAMCO's
stringent protocols ensured that every team member, from senior engineers to interns,
adhered to these standards. The importance of safety in the construction industry cannot be
overstated, as it not only protects the well-being of workers but also ensures the smooth
The orientation began with a comprehensive briefing on the use of personal protective
equipment (PPE). This equipment included helmets, gloves, safety boots, and high-visibility
vests, each serving a critical function in safeguarding the worker from various hazards
present on a construction site. The proper usage of PPE was demonstrated, emphasizing that
each piece of equipment must be worn correctly to provide maximum protection. For
instance, the helmets must be fitted securely to protect against head injuries from falling
objects, while safety boots are essential for preventing foot injuries from heavy materials and
sharp objects.
In addition to PPE, we were trained in emergency procedures, which included fire drills and
first aid. These procedures are crucial for ensuring swift and coordinated responses in case of
accidents. The fire drill training involved learning how to use fire extinguishers,
understanding evacuation routes, and assembling at designated muster points. This training
emphasized the importance of remaining calm and acting swiftly during emergencies to
First aid training covered the basics of treating common construction site injuries such as
cuts, burns, and fractures. This included practical demonstrations of CPR (Cardiopulmonary
Resuscitation) and the use of Automated External Defibrillators (AEDs). The training aimed
to equip us with the skills needed to provide immediate assistance to injured colleagues until
professional medical help arrives, highlighting the critical role of first responders in
emergency situations.
A tour of the construction sites further illustrated potential hazards and the measures in place
to mitigate them. This tour was an eye-opening experience, providing a real-world context to
the theoretical safety protocols discussed during the briefings. We observed the strategic
placement of safety barriers, which are essential for protecting workers from hazardous areas
and preventing unauthorized access. These barriers are especially important in areas where
heavy machinery operates or where there are open trenches and other potential fall hazards.
Signage for restricted areas and hazard warnings was another critical aspect of the site tour.
These signs are vital for communicating risks and ensuring that workers are aware of the
dangers in specific areas. For example, signs indicating the presence of electrical hazards,
chemical storage areas, and heavy lifting zones are crucial for preventing accidents by
Procedures for handling hazardous materials were also demonstrated. This included proper
learned about the use of Material Safety Data Sheets (MSDS) to understand the properties of
hazardous materials and the necessary precautions to take when handling them. The correct
use of personal protective equipment (PPE) when dealing with these materials was
emphasized, ensuring that workers are protected from chemical burns, inhalation of toxic
Additionally, we were introduced to the protocols for conducting regular safety audits and
inspections. These audits are essential for identifying potential hazards and ensuring that all
safety measures are up-to-date and effectively implemented. The importance of reporting
maintaining a safe working environment and preventing accidents before they occur.
These initial sessions laid a strong foundation for all subsequent field activities, ensuring that
safety remained a top priority throughout the internship. The comprehensive training
provided by YAMCO not only equipped us with the knowledge and skills to work safely but
also instilled a culture of safety awareness and responsibility. This culture was evident in
every aspect of the company's operations, from the meticulous planning of construction
activities to the daily practices of workers on-site. The emphasis on safety as a core value was
a constant reminder of the company's commitment to protecting its workforce and ensuring
hands-on training in the use of various surveying equipment, including theodolites, total
stations, and GPS units. Surveying is critical in the initial stages of any construction project,
as it provides the data needed for accurate planning and design. The practical training started
with the basics of setting up and calibrating these instruments, ensuring precise and reliable
meticulous calibration, which involves adjusting the equipment to eliminate any systematic
errors and ensure that the measurements taken are as accurate as possible.
surveys involve mapping the contours and features of a construction site, providing detailed
information about the terrain. This data is crucial for various aspects of civil engineering,
including the design of drainage systems, the planning of earthworks, and the layout of
infrastructure. During these surveys, I learned to measure elevation differences and create
contour maps, which are essential for understanding the topography of the site. This
experience provided insights into the complexities of terrain analysis and the importance of
Site layout tasks were another critical component of the surveying training. Site layout
involves transferring the design plans from paper to the physical ground, marking the exact
positions where various elements of the construction will be built. This process requires a
high level of precision and attention to detail, as even minor errors can lead to significant
issues during the construction phase. For instance, an incorrectly placed foundation can affect
By assisting in marking the positions of foundations, utilities, and other critical elements, I
developed an appreciation for the meticulous nature of civil engineering work. This task
involved using the survey data to accurately position stakes and markers on the site,
highlighted the importance of accuracy and thoroughness in site layout, as the correct
placement of these elements is crucial for ensuring that the construction adheres to the design
specifications.
In addition to practical surveying tasks, my training included learning about the principles of
the location of a point by forming triangles to it from known points. This technique is
fundamental in surveying, as it allows for the accurate determination of distances and angles
Leveling is another essential surveying principle that involves measuring the height of points
relative to a reference datum. This technique is crucial for ensuring that construction elements
are built at the correct elevations, which is particularly important for projects involving
multiple levels, such as roads, bridges, and buildings. Learning about leveling techniques and
using leveling instruments, such as auto levels and laser levels, provided me with the skills
Coordinate systems are also integral to surveying, as they provide a framework for defining
the positions of points on the Earth's surface. By learning about different coordinate systems,
such as the Cartesian coordinate system and the geodetic coordinate system, I gained a deeper
understanding of how survey data is represented and used in construction projects. This
knowledge is essential for integrating survey data with design plans and ensuring that all
use of GPS units in surveying has revolutionized the field, providing highly accurate
positioning data that can be used for a wide range of applications. I learned how to use GPS
accuracy and are essential for precise site layout tasks. This technology allows surveyors to
map large areas quickly and accurately, making it an invaluable tool in modern civil
engineering projects.
Overall, the hands-on experience in surveying and site layout at YAMCO provided me with a
solid foundation in this critical aspect of civil engineering. The practical knowledge gained,
has equipped me with the skills needed to perform accurate surveys and site layouts. This
training has not only enhanced my technical abilities but also deepened my appreciation for
the precision and attention to detail required in civil engineering work. As a result, I am better
ensuring that they are built according to design specifications and meet the highest standards
laboratory and on-site. These tests are essential for verifying that construction materials meet
the required specifications and standards, thereby ensuring the safety and longevity of the
One of the first tests I encountered was the soil compaction test. Soil compaction is critical
for foundation stability, and the standard proctor compaction method is a widely accepted
technique for this purpose. The process began with preparing soil samples, which involved
drying and sieving the soil to obtain a representative sample. The soil was then compacted in
layers within a mold using a standardized hammer. Each layer was compacted a specified
number of times to achieve uniform density. After compaction, the soil's density and moisture
content were measured to determine its suitability for use as a foundation material. This test
provided insights into how soil properties can affect the load-bearing capacity of foundations
Concrete testing formed a significant part of the training, reflecting its importance in
construction. I assisted in performing slump tests, which assess the workability of fresh
concrete. The slump test involves filling a conical mold with concrete, removing the mold,
and measuring the subsidence of the concrete. This test is crucial for ensuring that the
concrete mix has the right consistency for easy placement and compaction without
segregation or excessive bleeding. It also helps in identifying any deviations from the mix
design that might affect the final strength and durability of the concrete.
In the laboratory, I participated in compressive strength tests on concrete cylinders and cubes.
These tests are fundamental for assessing the load-bearing capacity of concrete. The
procedure involved preparing concrete samples by pouring fresh concrete into molds and
curing them under controlled conditions. After curing, the samples were placed in a
compression testing machine, which applied increasing loads until the samples failed. The
maximum load sustained by the concrete before failure was recorded as its compressive
strength. Through these tests, I learned about the factors influencing concrete strength, such
as curing time, temperature, and the water-cement ratio, and the importance of maintaining
Additionally, I was involved in asphalt density tests, which are crucial for road construction
projects. Asphalt density is a key indicator of the pavement's ability to withstand traffic loads
and environmental conditions. The tests I participated in included both field density tests
using nuclear density gauges and laboratory tests on core samples extracted from the
pavement. These tests involved measuring the density and air void content of the asphalt,
which are essential for ensuring that the pavement has the necessary compaction and
durability. Understanding the relationship between density, air voids, and pavement
performance highlighted the importance of proper compaction techniques and quality control
Other significant material tests I encountered included the tensile strength tests for
reinforcement bars and the consistency tests for cement. Tensile strength tests involve pulling
a steel rebar until it fractures, measuring its strength and ductility. These tests ensure that the
reinforcement bars can withstand the tensile forces they will encounter in a structure.
Consistency tests for cement, such as the Vicat needle test, measure the setting time and
workability of cement, ensuring it meets the required performance standards for concrete
production.
that maintaining consistent quality in construction materials is crucial for the safety,
verify that materials comply with design specifications and regulatory standards, preventing
results, understanding material behavior, and making informed decisions to ensure that
construction materials meet the desired standards. This holistic approach to quality assurance
Overall, the material testing and quality control training at YAMCO enriched my
understanding of the critical role these processes play in civil engineering. It reinforced the
integrity and durability of construction projects. The practical knowledge and skills gained
from this training are invaluable for my future career, equipping me to contribute effectively
holistic view of the field. Engaging in these tasks not only deepened my practical
understanding but also highlighted the intricacies and precision required in civil engineering.
One of the key tasks was participating in concrete pouring operations, which is a fundamental
aspect of many construction projects. The process began with the preparation of formwork, a
temporary mold into which concrete is poured. I assisted in constructing the formwork using
wood, metal, and other materials, ensuring it was properly aligned and securely braced to
withstand the pressure of the concrete. The accuracy in setting up formwork is crucial as it
directly affects the shape and surface finish of the concrete structures.
Following the formwork preparation, the placement of reinforcement bars (rebar) according
to design specifications was next. Rebar provides tensile strength to concrete, which is
inherently weak in tension but strong in compression. I learned to read structural drawings
and detail the correct placement, spacing, and anchorage of the rebar to ensure optimal load
distribution and structural integrity. This task underscored the importance of precision and
The actual pouring of concrete was a meticulously coordinated activity. I was involved in the
process of mixing concrete, ensuring the correct proportions of cement, aggregates, water,
and additives were used. The mixed concrete was then transported to the formwork using
various methods, including wheelbarrows, cranes, or concrete pumps, depending on the site
conditions and project requirements. My role included overseeing the pouring process to
compaction. Proper compaction, achieved through vibrators, was essential to eliminate air
Observing the curing process highlighted the importance of proper curing methods to achieve
the desired concrete strength and durability. Curing involves maintaining adequate moisture,
temperature, and time to allow the concrete to achieve its designed properties. I learned about
different curing methods such as water curing, membrane curing, and the use of curing
compounds. Proper curing is critical as it prevents rapid moisture loss, which can lead to
Formwork installation was another critical activity. This process required precision to ensure
that the formwork was aligned correctly and securely supported to withstand the weight of
the poured concrete. I assisted in setting up and dismantling formwork for different structural
elements, including foundations, columns, and slabs. Each type of structural element had its
unique challenges and requirements. For example, formwork for columns needed to be
perfectly vertical and securely braced to prevent movement during concrete placement.
The installation process began with marking out the dimensions of the formwork according to
the structural drawings. This involved measuring and leveling to ensure accuracy. Once the
dimensions were confirmed, I helped in assembling the formwork panels, ensuring they were
tightly joined to prevent leakage of the concrete slurry. Proper alignment and bracing were
crucial to maintaining the formwork’s integrity during the concrete pour. After the concrete
had cured sufficiently, dismantling the formwork required careful handling to avoid
Reinforcement detailing offered insights into the structural design aspects of civil
engineering. By working on the placement of rebar, I learned about the different types of
reinforcement used in construction and the significance of proper spacing, anchorage, and
involves understanding the load paths within a structure and ensuring that the rebar is placed
I participated in cutting, bending, and tying rebar according to the detailed drawings. This
process required accuracy and attention to detail to ensure that the rebar fit within the
formwork and was positioned correctly. I also learned about the importance of using spacers
and chairs to maintain the proper cover distance between the rebar and the outer surface of
the concrete. Adequate cover protects the rebar from corrosion and fire damage, which are
excavation, pipe laying, and backfilling. Effective drainage systems are critical for managing
surface water and preventing water accumulation, which can undermine structures and create
hazardous conditions. The installation process started with the excavation of trenches, which
needed to be of the correct depth and width to accommodate the pipes and allow for proper
backfilling.
I learned about the principles of proper slope and alignment for effective drainage systems.
The pipes must be laid with a consistent slope to ensure gravity flow of water, preventing
stagnation and blockages. This required careful measurement and adjustment during the
laying process. The pipes were joined and sealed to prevent leaks, and once laid, the trench
was filled with suitable material to support the pipes and restore the ground surface.
Apart from the key activities mentioned above, I also had the opportunity to engage in other
about mortar preparation, brick alignment, and ensuring level and plumb walls.
Steel Erection: For projects involving structural steel, I participated in the erection of
steel beams and columns, understanding the importance of bolted and welded
connections.
Finishing Works: Involved in tasks such as plastering, painting, and installing tiles,
which are crucial for the final appearance and functionality of the structures.
construction, from the initial site preparation to the final finishing works. The hands-on
experience in these diverse tasks enhanced my practical skills and reinforced the theoretical
Quality assurance in construction is not complete without thorough inspections and testing.
Throughout the internship, I was involved in various inspection activities, which were crucial
for ensuring that all construction work adhered to the highest standards of safety, durability,
One of the primary inspection activities was the structural inspection of buildings and
bridges. These inspections aimed to identify defects such as cracks, spalling, and corrosion,
which could compromise the structural integrity. The process began with a visual
examination of the structures, using tools like crack gauges and magnifying glasses to detect
surface defects. I learned to document these defects meticulously, noting their location, size,
and severity. This documentation is essential for assessing the extent of the damage and
assess the internal condition of the structures without causing damage. Techniques such as
ultrasonic testing, which uses high-frequency sound waves to detect internal flaws, and
radiographic testing, which uses X-rays or gamma rays to create images of the internal
structural health, revealing issues that might not be visible on the surface.
Pile load testing was another significant activity. This type of testing is critical for verifying
the load-bearing capacity of foundation elements, ensuring that they can support the designed
loads. I assisted in setting up and monitoring the tests, which involved applying loads to piles
and measuring their settlement. The process included installing load cells, hydraulic jacks,
The tests were conducted using both static and dynamic methods. Static load testing involved
gradually applying loads to the pile and recording the settlement over time. This test provided
data on the pile's bearing capacity and behavior under sustained loads. Dynamic load testing,
on the other hand, used a drop hammer to apply impacts to the pile, simulating real-world
loading conditions. The data collected from these tests was analyzed to determine the pile's
Participating in pile load testing highlighted the importance of foundation design and the
need for thorough testing to prevent potential structural failures. The experience taught me
how to interpret test data, identify potential issues, and understand the significance of
Hydrostatic pressure testing on water pipelines provided insights into the methods used to
detect leaks and ensure the integrity of water supply systems. This testing is crucial for
verifying that pipelines can withstand the operational pressures without leaking. The process
involved filling the pipeline with water, pressurizing it to a specified level, and maintaining
that pressure for a set duration while monitoring for pressure drops.
I participated in the preparation phase, which included isolating sections of the pipeline,
ensuring all air was expelled from the system, and connecting pressure gauges and data
loggers. During the test, we monitored the pressure levels continuously, watching for any
signs of pressure loss that could indicate leaks or weaknesses in the system. The test results
were then analyzed to identify any defects that needed to be addressed before the pipeline
This experience underscored the importance of rigorous testing in ensuring the reliability and
safety of water supply systems. It also provided practical knowledge of the procedures and
Beyond the primary testing activities, I was involved in several other inspection and testing
specifications was a critical part of quality assurance. I learned to check for correct bar sizes,
spacing, and cover, ensuring that all reinforcement was properly secured before concrete
pouring.
participated in other concrete quality tests such as the air content test and the temperature
monitoring of freshly mixed concrete. These tests are crucial for ensuring the mix's quality
compaction, was essential for ensuring that the soil met the required compaction and stability
standards. I learned to use tools like the nuclear density gauge to measure soil compaction
joints using visual inspection and non-destructive testing methods like magnetic particle
testing and dye penetrant testing. These inspections ensured that welds met the necessary
These inspection and testing activities emphasized the importance of continuous monitoring
and quality control throughout the construction process. They highlighted that quality
assurance is not a one-time event but an ongoing process that spans the entire lifecycle of a
project. From initial material testing to final structural inspections, every stage requires
The hands-on experience in conducting these tests and inspections reinforced the theoretical
of quality assurance in civil engineering. It also illustrated the critical nature of inspections
and testing in preventing failures, ensuring safety, and maintaining the integrity and
By engaging in these diverse inspection and testing activities, I gained a deep appreciation for
the rigorous standards and practices that underpin quality assurance in civil engineering. This
experience has equipped me with the skills and knowledge necessary to contribute effectively
to quality control efforts in future projects, ensuring that they meet the highest standards of
workshops to enhance our theoretical knowledge and technical skills. One of the key areas of
focus was safety and risk management. These sessions covered topics such as hazard
planning and scheduling techniques, including the use of software tools like Microsoft
Project and Primavera. These sessions highlighted the importance of effective resource
allocation, critical path analysis, and risk management in ensuring project success. By
Technical skills development sessions covered a range of topics, including concrete mix
design, structural analysis, and the use of surveying software. These workshops provided
hands-on training in advanced techniques and tools, enabling us to apply theoretical concepts
in practical settings. For instance, the concrete mix design session involved preparing trial
mixes, testing their properties, and optimizing the mix proportions to achieve the desired
performance characteristics.
Overall, these learning sessions and workshops supplemented the practical experiences
academic learning and practical application. Throughout the thirty-day program, I gained
comprehensive exposure to the various facets of civil engineering, from safety protocols and