ሥራው
PROJECT:-B+G+12 APARTMENT BUILDING
ቦታው
LOCATION:- ADIS ABEBA
አሰሪው መ/ቤት ውል/ Main Contract 22,340,232.69
CLIENT:- WEHEDEBO REALSTATE S.C ተቀጽላ ውል/ Supplementary Contract
አማካሪ
COSULTANT- HG CONSULTING PLC VAT 15% 3,351,034.90
ጠቅላላ ድምር/ Total Sum 25,691,267.59
የሥራ ተቋራጩ
CONTRACTOR:- AFRI PANASHE PLC
6,927,061.48
ለስራ ተቋራጩ 7,562,150.20 (ሰባት ሚሊዮን አምስት መቶ ስድሳ ሁለት ሺ አንድ መቶ ሃምሳ ብር ከ20/100) ሊከፈል መ ቻሉን
We certify that The contractor is now entitled to the sum of Birr 7,562,150.20 ( Seven milion five hundred sixty two thousand one hundred fifty birr 20/100 cent Only )
CONTRACTOR CLIENT
የሥራ ተቋራጩ አሰሪው መ/ቤት
AFRI PANASHE
È ------------------- Addis Ababa,
Contract No 1
CERTIFICATE OF PAYMENT
FOR MEASUREMENT No
According to the supervisor (s) of the work, the contractor has excuted an amount of birr, ,
on this date of Dec 18, 2023
1
2
3
4
5
6
7
8
9
10 We certify that contracto
11
12 Birr
13
14
15
Remaining advance
payment With Out VAT Birr0.00 CERTIFIED
CONSTRUCTION
SUPERVISOR
PANASHE PLC.
-------- Addis Ababa, Ethiopia
03
03
Amount (birr)
an amount of birr, ,
Amount (birr)
1 Previous Payment
2 Rebate 3 %
3 Advance Re-Payment 20%
4 Retention 5 % 346,353.07
5 Performance bond 5%
6 Penalty
TOTAL 346,353.07 346,353.07
three million seve hundred fourty thousand seven hundred two birr 44/100 Bir
Addis Ab 12/24/2023
PROJECT:- B+G+12
CLIENT :- - WEHEDEBO REALSTATE S.C
CONSULTANT:- HG BUILDING CONSULTANT PLC
CONTRACT :AFRI PANSHE PLC
LOCATION:- ADIS ABABA,ETHIOPIA
DATE:- OCT 09, 2023
Contract previous
ITEM DESCRIPTION OF WORK UNIT current Amount Todate Amount
amount Amount
1 SUPPER STRUCTURE
-
-
TOTAL AMOUNT Birr 22,340,232.69 - 6,927,061.48 6,927,061.48
VAT 15% Birr 3,351,034.90 - 1,039,059.22 1,039,059.22
GRAND TOTAL Birr 25,691,267.59 - 7,966,120.70 7,966,120.70
-
BILL OF QUANTITIES
PROJECT:- B+G+12 APARTMENT BUILDI
CLIENT :- WEHEDEBO REAL ESTATE S.C
COSULTANT- HG CONSULTING PLC
CONTRACTOR :- AFRI PANSHE PLC
LOCATION:- ADIS ABEBA,ETHIOPIA
DATE:- Oct 09, 2023
EXCUTED QUANTITY EXCUTED AMOUNT
CONTRACT CONTRACT PREVIOU
Rate CURENT TO DATE PREVIOUS CURENT TO DATE
QUANTITY AMOUNT S
SUPPER STRUCTURE -
1 CONCRETE WORKS
m3
b.intermidate and top tie beam 25.65 15,740.00 403,731.00 15.08 15.08 - 237,431.60 237,431.60
c. shear wall m3 16.46 15,740.00 259,080.40 14.32 14.32 - 225,411.28 225,411.28
d.lift wall m3 12.69 15,740.00 199,740.60 9.32 9.32 - 146,740.87 146,740.87
e.slab m3 68.14 15,740.00 1,072,523.60 72.57 72.57 - 1,142,317.67 1,142,317.67
137.63 -
- -
- -
- -
total carried to summary 2,326,214.60 137.63 - 2,166,313.59 2,166,313.59
M2
b.intermidate and top tie beam 166.4 1,760.00 292,864.00 150.22 150.22 - 264,392.94 264,392.94
c. shear wall M 2
109.73 1,760.00 193,124.80 107.47 107.47 - 189,150.72 189,150.72
d.lift wall M2 73.44 1,760.00 129,254.40 64.77 64.77 - 114,002.24 114,002.24
e.slab M2 459.55 1,760.00 808,808.00 454.44 454.44 - 799,817.04 799,817.04
total carried to summary 1,709,488.00 - 1,680,523.26 1,680,523.26
T D S DESCRIPTION T D S DESCRIPTION
1.1 CONCRETE WORK 1 1.1
18 0.8 0.3
0.5 3.06
3.06 1.0 m3 for LW4
22 m3 for column 1 0.9
2 0.5 1.1
0.3 0.3
3.2 0.3 m3 for LW4 above the door
1.0 m3 for stair column 9.3228 m3 for lift wall total
2 1.15 1 25.4
0.5 19.6
3.06 0.16
3.5 m3 for column 79.7 m3 for 1st floor slab
6 -0.1
0.1 1 14.48
3.04
-0.1824 Deduction for section minimized column
26.3 m3 of total column
1 1.45 2.15
0.3 0.02
m3 for 1st floor slab cantiliver along
3.06 0.6 axis 1
1.3 m3 for sw1 1 5.66
1 1.15 2
0.3 -0.16
3.06 (1.8) m3 dededuction for void along axis 1
1.1 m3 for sw2 1 3.58
1 5.1 1.9
0.3 -0.16
c1 20 14 4 6
c2 20 14 4 1
c3 20 14 4 1
c4 20 16 4 1
c5 20 14 4 3
c5' 20 20 4 1
c3' 20 14 4 3
c2' 20 14 4 1
c4' 20 14 4 1
c6 20 18 4 1
c7 20 18 4 1
columns on stair 16 10 4 2
stirup
sec 1-1@1 10 19 2.76 6 314.64
10 7 2.76 6 111.504
@2 10 19 2.08 6 237.12
10 7 2.08 6 84.032
@3 10 19 2.08 6 237.12
10 7 2.08 6 87.36
@4 10 19 0.64 6 73.188
10 7 0.64 6 26.964
section 5-5
@1 10 19 2.76 5 262.2
10 7 2.76 5 96.6
@2 10 19 2.08 5 197.6
10 7 2.08 5 72.8
@3 10 19 2.08 5 197.6
10 7 2.08 5 72.8
@4 10 19 0.64 5 60.99
10 7 0.64 5 22.47
sec 6-6
@1 10 19 2.76 7 367.08
10 7 2.76 7 135.24
@2 10 19 2.08 7 276.64
10 7 2.08 7 101.92
@3 10 19 2.08 7 276.64
10 7 2.08 7 101.92
@4 10 19 0.64 7 85.386
10 7 0.64 7 31.458
sec 7-7
10 19 1.22 2 46.36
10 7 1.22 2 17.08
10 19 3.06 2 116.28
10 7 3.06 2 42.84
10 19 2.58 2 98.04
10 7 2.58 2 36.12
10 19 0.54 2 20.596
10 7 0.54 2 7.588
10 19 1.29 2 49.096
10 7 1.29 2 18.088
shear wall
vertical
sw1 15 20 30 4 1
sw2 12 20 24 4 1
sw3 16 44 3.86 1
14 16 3.86 1
sw4 16 32 3.86 1
14 12 3.86 1
sw5 16 36 3.86 1
14 8 3.86 1
Lw1 14 62 3.86 1
Lw2 14 48 3.86 1
Lw3 14 36 3.86 1
Lw4 16 40 3.86 1
horizontal
sw1 3.42 10 27 3.42 1 92.34
sw2 10 27 2.68 1 72.36
sw3 10 19 10.8 1 204.44
sw4 10 19 11.6 1 220.02
sw5 7.56 10 19 7.56 1 143.64
Lw1 10 19 9.76 1 605.12
Lw2 10 19 9.76 0
Lw3 10 21 5.66 1 118.86
Lw4 10 19 1.9 1 36.1
c-bar
sw1 10 342 0.5 1 171
sw2 10 114 0.5 1 57
sw3 10 399 0.5 1 199.5
10 38 1.65 1 62.7
sw4 10 342 0.5 1 171
10 38 1.4 1 53.2
adtional striup
sw1 10 0
sw2 10 117.04
sw3 10 38 3.45 1 131.1
sw4 10 38 3.5 1 133
sw5 10 38 3.08 1 117.04
10 304 0.5 1 152
336
56
56
64
168
80
168
56
56
72
72
80
120
96
169.84
61.76
123.52
46.32
138.96
30.88
239.32
185.28
138.96
154.4
702.52 666.72 1400
1.209 1.579 2.467 3.555
849.3467 1052.751 2210.6
Description Dia No. bars L No. mem Σ Length for each d
6 8 10
Y driction 1
BOTTOM BAR 8 7 9.09 1 63.63
8 12 7.57 1 89.7045
8 11 3.8 1 43.48889
8 20 8.137 1 162.74
8 13 7.95 1 103.7917
8 11 5.525 1 61.69583
8 22 6.297 1 140.8954
8 20 10.25 1 201.0139
8 41 5.25 1 215.25
8 35 10.28 1 361.5133
8 18 10.625 1 191.25
8 17 9.715 1 162.7263
8 10 10.5 1 109.6667
8 15 9.09 1 137.865
8 17 5.25 1 87.9375
8 22 6.845 1 148.3083
8 20 5.205 1 104.1
8 10 7.81 1 74.42471
top y drn 12 120 4.39 1
10 59 6.12 1 360.927
10 17 4.645 1 77.48705
10 19 2.45 1 47.36667
10 25 3.545 1 89.21583
10 14 3.32 1 45.37333
10 24 3.32 1 78.5844
10 22 3.32 1 74.33111
10 27 2.75 1 73.33333
10 75 3 1 225.6667
10 18 4.25 1 75.72727
10 135 2.85 1 383.4346
chair 10 360 1.5 1 540
disturbution bar 10 220 3 1 660
10 160 2.4 1 384
10 240 2 1 480
Beams
on axis 1 14 3 8.14 1
14 3 5.525 1
14 3 7.385 1
16 3 2.06 1
20 3 3.32 1
20 3 3.32 1
20 3 1.98 1
20 4 3.32 1
16 3 2.89 1
BOTTOM BAR 16 3 10.89 1
16 1 6.24 1
16 3 9.56 1
on axis 1' 16 3 9.445 1
14 3 9.445 1
on axis 2 14 3 9.535 1
14 3 5.525 1
14 3 6.96 1
16 1 3 1
16 3 3.6 1
16 3 3.21 1
16 3 2.6 1
16 2 1.98 1
16 3 6.46 1
16 4 7.05 1
16 3 8.71 1
on axis 3 14 3 9.535 1
14 3 7.715 1
20 2 2.37 1
20 3 3.93 1
20 3 3.21 1
16 2 1.97 1
16 3 6.46 1
16 3 7.05 1
16 3 4.94 1
on axis 4 14 3 9.53 1
14 3 7.715 1
20 2 2.37 1
20 4 3.93 1
20 3 3.21 1
20 3 1.97 1
16 4 6.46 1
20 4 7.05 1
16 3 4.94 1
on axis 5 14 3 8.585 1
14 3 5.625 1
14 3 7.81 1
20 3 2 1
16 3 3.65 1
20 2 3.28 1
20 3 2.88 1
20 2 2.26 1
16 3 5.41 1
20 4 7.52 1
20 2 9.56 1
on axis 6 14 3 8.585 1
14 3 5.625 1
14 3 7.81 1
20 3 2 1
20 3 3.65 1
20 3 3.28 1
20 3 2.88 1
16 3 2.26 1
16 3 5.41 1
20 3 7.25 1
16 3 9.56 1
on axis A 14 3 4.345 2
B/N 3&4 16 3 8.73 2
16 3 6.15 2
ON AXIS C 14 3 8.77 1
16 3 8.77 1
14 1 2.18 1
14 2 2.55 1
14 1 1.49 1
ON AXIS D 14 3 7.31 1
14 3 9.31 1
14 1 2.55 1
14 2 2.63 1
20 4 4.36 1
16 3 5.96 1
16 4 10.76 1
14 4 3.325 3
14 2 2.36 1
vertical 0 0 4220.786
1st floor slab 0 3359.08 3347.838
total vertical+1st flor slab 0 3359.08 7568.624
36.72
6.78
11.58
8.685
36
28.935
6.64
5.1
5.32
17.44
17.805
25.35
23.88
15
21.81
21.81
6.28
6.28
29.385
39.18
3.14
3.78
4.27
23.985
23.985
12.48
2.135
26.31
26.31
2.18
5.1
1.49
21.93
27.93
2.55
5.26
17.44
17.88
43.04
39.9
4.72
32.535
32.535
6.28
5.76
4.27
25.41
25.41
5.88
17.3
24.96
24.96
2.26
17.36
17.985
23.98
4.4
10.785
10.785
1.295
24.72
36.64
36.64
35.82
48.24
55.59917
34.13583
22.03417
29.34083
17.58167
61.87833
16.66833
28.31333
18.95167
33.10833
941.9183 977.095 965.62 387.89 0
0.888 1.209 1.579 2.467 3.555
1524.7 612.4783
836.4235 1181.308
10861.8344031318
19195.3179031318
4321
2483.76
3460.2
5182.8
1815
959.04
T D S DESCRIPTION T D S
2.1 FORM WORK 1 25.4
18 2.6 19.6
3.04 c=.5*2+.8*2 498.0
142.3 m2 1 3.5
2 3.3 c= 1.15*2+.5*2 -2
3.04 (7.0)
20.1 m2 for c6&c7 1 2
2 1.6 -2
3.2 c=.5*2+.3*2=1.6 (4.0)
10.2 m2 for stair column 1 3.58
1 3 -1.9
2.9 (6.8)
8.7 1 4.1
11 0.1
3.04
(3.3)
m2 for FB4