Professional Documents
Culture Documents
Laboratory Activity Omitted Measurements
Laboratory Activity Omitted Measurements
Laboratory Activity Omitted Measurements
College of Engineering
CSURV111P (ELEMENTARY SURVEYING - LABORATORY)
NAME: DATE:
SECTION:
1. Given the following tabulated data for a closed traverse, determine the length and bearing of
the unknown side CD. Draw a sketch of the problem.
SKETCH:
SOLUTION:
2. Given the following tabulated data for a closed traverse, determine the length of DE and
bearing of EA. Draw a sketch of the problem.
LENGTH BEARING LATITUDES (m) DEPARTURES (m)
LINE
(m) FORWARD +N -S +E -W
AB 666.67 N 45° 33’ E
BC 727.61 S 85° 49’ E
CD 556.71 S 10° 04’ E
DE unknown S 68° 46’ W
EA 674.98 unknown
SKETCH:
SOLUTION:
3. Given the following tabulated data for a closed traverse, determine the length of DE and
bearing of EA. Draw a sketch of the problem.
LENGTH BEARING LATITUDES (m) DEPARTURES (m)
LINE
(m) FORWARD +N -S +E -W
AB 356.79 S 37° 12’ E
BC 489.79 S 64° 06’ E
CD 579.30 N 53° 58’ E
DE 631.08 unknown
EA 606.16 unknown
SKETCH:
SOLUTION: