Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Form No : F/OSH - 03

Rev. 0

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Name of Job : Department : Prepared By : Checked By :- Approved By :


WEILDING WORK CONSTRUCTION

HAZARD IDENTIFICATION RISK ASSESSMENT Recommended


Action/Additional
Job Activity Hazard Hazard Character Current Risk Control Probability Severity Risk Control

Physical injuries caused by First aid cases/medical Additional control shall be


treatment (M.C between Workers wear proper PPE. 2 2 4 proposed when necessary
weight, sharp edges. 1 to 3 days),

Physical injuries caused by First aid cases/medical Workers wear safety shoes; Additional control shall be
treatment (M.C between 2 2 4 proposed when necessary
Mobilization/ falling cyclinder. 1 to 3 days), Provide safe handling procedure.
unloading of
welding First aid cases/medical Provide safe storage procedure;
equipment Environment pollution treatment (M.C between Provide maintenance schedule; 2 27 54
Additional control shall be
proposed when necessary
caused leaking gases. 1 to 3 days), Closed supervision.

Sudden injuries caused by First aid cases/medical


Provide safe handling/lifting Additional control shall be
excessive lifting and treatment (M.C between 2 2 4 proposed when necessary
1 to 3 days), procedure; Closed supervision.
mishandling.

First aid cases/medical Workers wearing face


Eyes injury caused by Additional control shall be
treatment (M.C between shield/goggle; Provide only 2 2 4 proposed when necessary
excessive flash light. 1 to 3 days), competent welder.

Wearing face mask and face


First aid cases/medical
Gas inhalation/welding shield; Provide safe working Additional control shall be
treatment (M.C between 2 2 4 proposed when necessary
fume. 1 to 3 days), procedure; Provide proper
ventilation/exhaust fan.
Welding
process Worker wear proper PPE;
Fatality or permanent Provide safe working procedure; Briefing By SHO on safety
Explosion due to leaking
disability or irreversible Provide warning signage; Proper 1 5 5 awareness. Additional control
cylinder/valve/hose. illness shall be made if necessary.
maintenance schedule; Closed
supervision.

Major injury/illness (Long Briefing By SHO on safety


Body injuries due to Worker wear proper PPE;
absenteeism, M.C > 14 2 4 8 awareness. Additional control
burnt/hot surface. days). Provide safe working procedure. shall be made if necessary.

Page 20/29
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Name of Job : Department : Prepared By : Checked By :- Approved By :


MASONRY WORK CONSTRUCTION

HAZARD IDENTIFICATION RISK ASSESSMENT Recommended


Minor damage (No or Action/Additional
Job Activity Hazard Hazard Character Current Risk Control Probability Severity Risk Control
less disruption,
Minor damage repair
(No or Competent and certified driver; Additional control shall be
Traffic collision. 2 2 4 proposed
Transporting of cost > RM1,000repair
less disruption, and < Closed
Regularsupervision.
maintenance and Additional when necessary
control shall be
Machinery breakdown. RM10,000) 2 2 4 Briefing
proposedBywhen
SHOnecessary
on safety
material Material overloading, cost
Minor>injury/illness
RM1,000 and (M.C< servicing.
Workers wear proper PPE;
Fatality
RM10,000)
between or
5 permanent
to 14 days)
2 3 6 awareness. Additional
Briefing By SHO control
on safety
falling and hit workers.
Physical injuries due to hit Closed
Workerssupervision.
wear proper PPE; shall be made if necessary.
disabilityororpermanent
Fatality 2 5 10 awareness. Additional
Briefing By SHO on safetycontrol
by moving
Physical objects.
injuries due to hit irreversible illness Provide
Workerssafe
wearworking
properprocedure.
PPE; shall be made if necessary.
Crane collapse due to disabilityororpermanent
Fatality 2 5 10 awareness. Additional
Briefing By SHO on safetycontrol
by falling objects. Provide safe working
Provide a proper PMA procedure.
certificate; shall be made if necessary.
irreversible
Unloading of unstable ground/platform disability or illness(Long
Major injury/illness 2 5 10 awareness. Additional
Briefing By SHO on safetycontrol
Trip and fall due to poor Fully usegood/save
Provide outrigger platform.
access and shall be made if necessary.
material or mishandling. irreversible illness
absenteeism, M.C > 14 2 4 8 awareness. Additional
Briefing By SHO on safetycontrol
housekeeping.
Manual handling due to Minor
days). injury/illness (M.C maintain good
Use proper handhouse keeping.
tools; Workers shall be made if necessary.
Physical 2 3 6 awareness. Additional control
improper injuries due to
lifting techniques. between 5 to 14 days)
Minor injury/illness (M.C wear proper
Workers PPE.
wear proper PPE; Briefing By SHO on safety
shall be made if necessary.
cut/pierce by sharp edge between 5 to 14 days) 2 3 6 awareness. Additional control
Provide safe working procedure. shall be made if necessary.
object.

You might also like