Demoltion Work Risk Assesment
Demoltion Work Risk Assesment
Rev. 0
Setting up working Heat stress/stroke due to hot Near miss/ unsafe act/ unsafe Workers to take a short break where Additional control shall be
3 1 3
platform (Scaffold) working environment. condition.f applicable. proposed when necessary.
Space Near miss/ unsafe act/ unsafe Training and proper planning of Additional control shall be
constrain.tdddefgdgdfdtrddftfxdf condition. work.
4 1 4 proposed when necessary.
Setting up working Temporary staging broke due to Minor damage (No or less
Training and proper planning of Additional control shall be
platform (Temporary overloading of debris which is not disruption, repair cost >
work.
2 2 4 proposed when necessary.
Staging) removed. RM1,000 and < RM10,000).
Briefing By SHO on safety
Fatality or permanent disability Workers wear safety harness;
Falling from height
or irreversible illness Provide safe working procedure.
2 5 10 awareness. Additional control
shall be made if necessary.
Page 1/29
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL