RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Site Mobilization
Initial Risk
(With existing Residual Risk
Additional
Basic / Job Steps Health and Safety Hazards Effect controls)
Control Measures
Risk Risk
Download HSE Docs
S L R S L R
Level Level
Ensure all necessary Miscommunication resulting Asset / Supervisor/ Foreman to discuss with discipline
permits are approved in incorrect work type and equipment / 2 2 4 L supervisor(s) what works requirements are needed for 2 1 2 L
prior to starting work. duty being built personal the tasks to be performed
Untrained or inexperienced
3 2 6 M 1 1 1 L
operators of vehicle Supervisor to ensure only trained and authorised
Obstructed vision of vehicle personnel operate such vehicle. Signalman to be in
operator and signalman clear line of vision with operator. If signalman and
resulting in personnel being vehicle operator do not have clear line of vision. All
3 3 9 M vehicle and trucks are to be fitted with reversing 2 2 4 L
struck or damage to
materials or other Asset / alarms.
equipment in area equipment /
Set up / transfer of personal
Personnel struck by moving
materials plant resulting from lack of
Ensure all materials are properly tied down and secure
attention or being unable 4 3 12 M
before moving. Loose items are to be contain
2 2 4 L
to
hear due to background
noise
Speeding vehicles 2 2 4 L Comply with speed limits at all times 1 1 1 L
Unsecured loads / materials Gain assistance where necessary when manually
resulting in loads falling off 2 2 4 L lifting and moving heavy or awkward items. Utilise 2 1 2 L
truck mechanical lifting apparatuses where practical
Severity (S) Values: 1-5 Likelihood (L) Values: 1-5 Note: Use the RAM when determining the values of S and L
Risk (R) = S x L Risk Ranking: 1 – 4 = Low (L) 5 – 12 = Medium (M) 15 – 25: High (H) Page 1 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
vehicle
in elevated work areas load.
Non-essential personnel If using crane ensure load is properly balanced and
Personnel 3 3 9 M 2 1 2 L
entering area secured prior to releasing tension and removing slings
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Severity (S) Values: 1-5 Likelihood (L) Values: 1-5 Note: Use the RAM when determining the values of S and L
Risk (R) = S x L Risk Ranking: 1 – 4 = Low (L) 5 – 12 = Medium (M) 15 – 25: High (H) Page 2 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
prior to starting work. duty being built personal the tasks to be performed
Safe access and egress will be provided and an
established safe route will be designated by the
foreman.
Employees must maintain alertness at all times
Personnel injuries Personnel 3 3 9 M Maintain job cleanliness on a daily basis in order to 2 1 2 L
prevent tripping, collisions, dumping or dropping of
hand carried loads.
Hard hat and other appropriate PPE must be worn and
used
Installing Temporary Personnel/
If ambient weather conditions support rain or high
Fence Adverse weather equipment
2 2 4 L wind. All workers will be suspended outdoors until 2 1 2 L
such conditions improve.
All operatives are to be aware of vehicular movement
Personnel/ that exists on the site and caution must be taken
Vehicular movement 3 3 9 M 2 2 4 L
equipment when trafficking the site. All operatives are to adhere
to the
site instructions regarding to vehicular movement.
No access to the site or working area without the
Personnel/ authority of HSE Department. Site induction must
Unauthorised access 3 3 9 M 2 2 4 L
equipment have been completed prior to undertaking any works.
When required. Permits to work must be obtained.
Severity (S) Values: 1-5 Likelihood (L) Values: 1-5 Note: Use the RAM when determining the values of S and L
Risk (R) = S x L Risk Ranking: 1 – 4 = Low (L) 5 – 12 = Medium (M) 15 – 25: High (H) Page 3 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
erity (S) Values: 1-5 Likelihood (L) Values: 1-5 Note: Use the RAM when determining the values of S and L
Sev
Risk (R) = S x Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 4 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 5 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Download HSE Docs
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Earth works (Excavation)
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 6 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Initial Risk
(With existing Residual Risk
Additional
Basic / Job Steps Health and Safety Hazards Effect controls)
Control Measures
Risk Risk
S L R S L R
Level Level
All equipment used in excavation should be
inspected by safety engineer in the site
Equipment Failure Equipment 2 2 4 L
Safety induction to all operators should be
1 2 2 L
conducted before starting excavation
Underground utilities should be identified and
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 7 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 8 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Download HSE Docs
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Concrete Work
Basic / Job Steps Health and Safety Hazards Effect Initial Risk Additional Residual Risk
(With existing Control Measures
controls)
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 9 of 42
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Risk Risk
S L R S L R
Level Level
Safe access and egress will be provided and an
established safe route will be designated by the
foreman.
Employees must maintain alertness at all times
Personnel injuries Personnel 3 3 9 M Maintain job cleanliness on a daily basis in order to 2 1 2 L
prevent tripping, collisions, dumping or dropping of
hand carried loads.
Hard hat and other appropriate PPE must be worn and
Download HSE Docs
used
All workers will be undertaking a recognised training
course
Concrete Works Workers informed of requirement to provide all hand
tools in a safe condition (information contained in
joining instructions)
hand tools inspected by safety expert
Unsafe use of hand tools Personnel/ Damaged/defective tools to be taken out of use
3 2 6 M 2 1 2 L
equipment immediately
Workers to be instructed by joining instructions to
provide all necessary PPE (gloves, safety shoes, safety
helmets, safety glasses/glasses )
Experts to carry out periodic visual inspections
throughout work, defective tools to be removed
immediately
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 10 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 11 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 12 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Download HSE Docs
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Steel Structure Work
Initial Risk
(With existing Additional Residual Risk
Basic / Job Steps Health and Safety Hazards Effect controls)
Control Measures
Risk Risk
S L R Level S L R Level
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 13 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Erection materials
Personnel/ Safety harnesses and lanyards to be worn and lanyards
Falling from Height 2 2 4 L 2 1 2 L
equipment tied off to an adequate anchorage at all times.
Hand injuries (cuts and
Personnel 3 3 9 M All personnel shall wear safety gloves 1 1 1 L
scratches)
Excessive noise from other
personnel 2 3 6 M Wear ear plugs (where required) 1 1 1 L
workers
Steel parts materials laying Personnel/ Clean up and remove all loose materials and return
3 2 6 M 2 1 2 L
around equipment back to storage area
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Finishing Works
Initial Risk
(With existing Residual Risk
Additional
Basic / Job Steps Health and Safety Hazards Effect controls)
Control Measures
Risk Risk
S L R S L R
Level Level
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 14 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
course
Plastering Workers informed of requirement to provide all hand
tools in a safe condition (information contained in
Unsafe use of hand tools joining instructions)
Trowels Employees hand tools inspected by safety expert
Cutting tools (hand) Personnel/ Damaged/defective tools to be taken out of use
3 2 6 M 2 1 2 L
Hammers equipment immediately
Screwdrivers Workers to be instructed by joining instructions to
Saws provide all necessary PPE (gloves, safety shoes, safety
helmets, safety glasses/goggles)
Experts to carry out periodic visual inspections
throughout Working, defective tools to be removed
immediately
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 15 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 16 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 17 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 18 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 19 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 20 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 21 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 22 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Fire Fighting System Works
Initial Risk
(With existing Additional Residual Risk
Basic / Job Steps Health and Safety Hazards Effect controls)
Download HSE Docs
Control Measures
Risk Risk
S L R S L R
Level Level
Provide secure stockpile area for pipes and fittings.
Unload and stack pipes strictly in accordance with the
Pipes may move/roll or be Personnel/
5 3 15 H manufacturers’ recommendations (contact 3 1 3 L
tampered with by others equipment
manufacturer for recommendations where necessary).
Minimise height of pallets / stockpile.
Correct manual handling techniques.
Personnel/ Use mechanical aids where possible.
Pipes and fittings 3 3 9 M 2 2 4 L
equipment Maintain control of loads when lifting & moving.
Carry pipes close to ground while moving
Provide the appropriate fencing and/or barricades as
per site risk assessment.
Apply appropriate signage and pedestrian control.
Devise and implement system for site inspection and
Personnel Injury Personnel 3 3 9 M security. 2 2 4 L
Ensure security and equipment suitable to minimise
vandalism
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 23 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 24 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 25 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 26 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Plumbing Work
Initial Risk
(With existing Additional Residual Risk
Basic / Job Steps Health and Safety Hazards Effect controls)
Download HSE Docs
Control Measures
Risk Risk
S L R S L R
Level Level
All operatives are to fully familiarise themselves with
Personnel/
Site awareness 2 2 4 L method statements, risk assessments, health and safety 1 1 1 L
equipment
data sheets and all operatives are to be inducted.
Safe access and egress will be provided and an
established safe route will be designated by the
foreman.
Employees must maintain alertness at all times
Personnel injuries Personnel 3 3 9 M Maintain job cleanliness on a daily basis in order to 2 1 2 L
prevent tripping, collisions, dumping or dropping of
hand carried loads.
Hard hat and other appropriate PPE must be worn and
used
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 27 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 28 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 29 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 30 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 31 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Scaffolding
Initial Risk
(With existing Additional Residual Risk
Basic / Job Steps Health and Safety Hazards Effect controls)
Download HSE Docs
Control Measures
Risk Risk
S L R S L R
Level Level
Inspect materials before use. Damaged gear is to be
Damaged scaffold materials equipment 3 2 6 L removed 2 1 2 L
Instruct workers regarding any special requirements
Scaffold does not meet job Personnel/
3 3 9 M regarding scaffold dimensions and duty type required 2 2 4 L
requirements equipment
for task.
Cold cutting of scaffold tubes shall be utilised whiners
practical.
Jagged / sharp tubes Personnel 3 3 9 M The end of tubes that have been flame cut shall be 2 1 2 L
dressed immediately
'Quick-fit' scaffold shall not be cut
Erecting scaffold Unauthorized personnel Supervision shall not entered or permit any person
platforms Personnel/
erecting, altering or 2 2 4 L other than those approved to erect, alter or dismantle 2 1 2 L
equipment
dismantling scaffold scaffolding
Personnel/ Assign adequate number of scaffolders for task. Gain
Sprains and strains equipment 2 3 6 M assistance when lifting and handling materials 1 2 2 L
Dropped objects resulting
Watch person below or above to ensure they have a
from miscommunication
Personnel/ hold of a tube or board before releasing grip. Clips to
between scaffolders when equipment
3 3 9 M
lift up in bags and pass onto scaffolders by hand to
2 2 4 L
passing or lowering hand, not thrown.
materials
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 33 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
etc.
Hand injuries (cuts and
Personnel 3 3 9 M All personnel shall wear safety gloves 1 1 1 L
scratches)
Excessive noise from other
personnel 2 3 6 M Wear ear plugs (where required) 1 1 1 L
workers
Personnel/
Falls to lower levels 3 2 6 M Safety harnesses and lanyards to be worn 2 1 2 L
equipment
When stripping multiple bays and multiple lift
scaffolds (independent scaffold) start from one end
and move along through each bay until complete and
Incorrect sequence of then move to lower lift.
Dismantling scaffold removing scaffold handrails Remove handrails, kick boards and lower down.
platforms and boards which exposes Personnel/ Cut ties on boards, ensuring no personnel below and
3 2 6 M 2 1 2 L
scaffolders to additional equipment tip over to remove any remaining sand, weld slag or
risk of falling to levels grinding debris
below and / or scaffold Scaffolder to climb down to lower deck and remove
collapse upper boards and then lower down. FOR
INDEPENDENT SCAFFOLDS remove upper
transoms, ledgers and braces
Scaffold incomplete or not
Personnel/ Supervisor or Foreman to conduct final inspection and
built in accordance with equipment
4 2 8 M
if suitable issue scaff tag
2 1 2 L
requirements
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 34 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Completion of
Unregistered scaffold Personnel 2 2 4 L Fill out scaff tag and & scaffold erection book 2 1 2 L
scaffolding task
Scaffold materials laying Personnel/ Clean up and remove all loose materials and return
3 2 6 M 2 1 2 L
around equipment back to storage area
Use of scaffold by other
Remove green scaff tag and barricade access points to
work groups during Personnel 3 2 6 M 2 2 4 L
scaffold
dismantling
Workers should never be permitted to work alone in a
harness.
Rope/cable tenders must make certain the harness user
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 35 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
RISK ASSESSMENT
Prepared By Eng. Mohamed Saad Signature Date 07/01/2022
Activity: Crane Set-up and Lifting
Initial Risk
(With existing Additional Residual Risk
Basic / Job Steps Health and Safety Hazards Effect controls)
Download HSE Docs
Control Measures
Risk Risk
S L R S L R
Level Level
Crane to be inspected by project Lifting Supervisor or
Operations HSE department (if accessing operational
Simultaneous activities facility)
Supervisor shall discuss with the Supervisor in charge
Assess into area (Interface) of other workers Personnel 2 2 4 L 2 1 2 L
of other workers a suitable time to commence the
in area crane set up and lifting activities. If work is to
proceed, Supervisor is to make the workers aware of
any additional hazards and precautions to be taken
Inspection and colour coding of rigging gear shall be
current. Rigging gear shall be inspected prior to use
Damaged lifting equipment Equipment 2 2 4 L 2 1 2 L
to ensure that the gear has not suffered any damage as
a result of previous use
All equipment used in the unloading of material and
Selection of rigging
Personnel / equipment shall have been inspected and certified as
equipment required Manual Handling Equipment / 3 2 6 M fit for use on the project. All cranes shall have been 2 2 4 L
for use Asset site inspected and have an approval certificate in the
cab of the crane and an approval sticker attached to it.
Work in pairs when lifting and handling lifting slings,
Struck by caught between Personnel 2 2 4 L shackles and other equipment. Gloves to be worn 2 1 2 L
when handling lifting equipment
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 36 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 37 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Non-essential personnel in
Personal 3 2 6 M Remove all non-essential personnel 2 2 4 L
area
Soft ground conditions are Do not locate truck near or on recently backfilled
resulting in truck becoming uncompact ground without adequate matting. Do not
position over underground services. Banks man /
bogged or trailer wheels Equipment 3 2 6 M 2 1 2 L
spotters to be positioned in clear line of sight with
sinking and load becoming driver. Additional spotters shall be used where
unstable and shifting. required
Check that reverse alarms are working. Delivery
trucks which are not fitted with alarms shall have
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 38 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Sprains and strains, caught Keep hands clear of crush points and use tag lines to
Personnel 3 2 6 M 2 1 2 L
between or struck by control the movement of all loads that are lifted
Dropped objects resulting All non-essential personnel to be cleared from slew
Equipment / path area. All personnel are to remain clear from load
in personnel being struck or
Personal / 4 3 12 M path until the load is lowered and rested on ground. 3 1 3 L
other equipment or Asset All loads once positioned on skids or timber shall be
materials being damaged adequately chocked to prevent unexpected movement
Equipment / Taglines to be used on all loads carried over shoulder
Swinging loads Personal / 3 3 9 M height. Load is to be slewed at a slow and constant 2 2 4 L
Asset speed
Take load up on the crane and lift clear of trailer
deck. Ensure load is lifted evenly, if not lower back
Lift load off truck and Equipment /
onto deck and make necessary adjustments. Once the
move into position Load unbalanced Personal / 3 3 9 M 2 2 4 L
load is lifted from the trailer move the truck out from
Asset
under the load if the truck cab does not have to pass
under the suspended load
Damage to gear resulting All loads are to be placed on timber supports and
from lack of clearance Equipment 3 3 9 M spaced accordingly to ensure adequate space under 2 2 4 L
under load to remove slings and between the loads to remove slings
Dropped objects resulting
from loose materials being Equipment / Ensure all loose packing material is removed from the
3 3 9 M 2 2 4 L
placed too close to edges of Personal trailer before the loads are lifted from the truck
the trailers.
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 39 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Dropped objects resulting All loads must be strapped or tied before lifting and
from materials not been small loads where practical are to be lifted in an
Personal 3 3 9 M 2 2 4 L
secured whilst being lifted approved lifting cage. Personnel are not stand under
by forklift any load.
Ensure loads are supported, correctly balanced on
Unload materials timber sleepers and chocked before removing forks
using forklift and Unbalanced / insecure loads from under the loads. Ensure the load is properly
Equipment /
locate at storage balanced and secured (By chocking or lashing) prior
once landed onto elevated Personal / 3 3 9 M 2 2 4 L
to releasing tension and removing slings. If chocks
area or at job work areas Asset
are used in elevated work areas chocks are to be
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 40 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 41 of
Co. Contracting for System Building شــــــركــــــــــــة أنظمه البناء للمقاوالتASSESSMENT RISK
Waste Heat Recovery Boilers’ foundations of Helwan Cement
Download HSE Docs
Severity (S) Values: Likelihood (L) Values: Note: Use the RAM when determining the values of S and
1-5 Risk (R) = S x L 1-5 Risk 1 – 4 = Low 5 – 12 = Medium (M) 15 – 25: High Page 42 of