Date : Daily Progress Report Site Name : LULU MALL , LU

Project Plan
Sr. No. Tower Details Work Description
Days Required Start Date
Material Supply
1 Supply of RF Material
2 Supply of Fibre Material
I&C
1 Basement Floor DAS Work 9-Mar-24
2 Ground Floor DAS Work 9-Mar-24
3 First Floor DAS Work 9-Mar-24
4 Second Floor DAS Work 9-Mar-24
5 Third Floor DAS Work 9-Mar-24
6 Fourth Floor DAS Work 9-Mar-24
7 Fifth Floor DAS Work 9-Mar-24
8 Sixth Floor DAS Work 9-Mar-24
9 Seventh Floor DAS Work 9-Mar-24
10 Eight Floor DAS Work 9-Mar-24
11 Ninth Floor DAS Work 9-Mar-24
12 Terrace Floor POLE/BTS/IBS ROOM 9-Mar-24
e Name : LULU MALL , LUCKNOW
ect Plan Actual Deployment
Remarks
Finish Date Start Date Finish Date
Description Planned (Quantity) Installed (Quantity)
Civil Pad
Installation of Poles Please take data with
Cable Tray Electrical & civil
SMPS Team
Battery Bank
Electrical Cabling
Completed
WIP
Permission WIP
No Permission

LULU MALL , LUCKNOW


Backbone 7/8"
COMBINER 4 IN 4 OUT (698-3800Mhz) -160dBc 4x1
TRIPLEXER (3400-3800Mhz) -150dBc 3x1
TRIPLEXER (850+1800+2300Mhz) -160dBc 3x1
QUADPLEXER (900+1800+2100+2300Mhz) -150dBc 4x1
QUADPLEXER (900+1800+2100+2600Mhz) -150dBc 4x1
TRIPLEXER (1800+2100+2300Mhz) -150dBc 3x1
TRIPLEXER (1800+2300+2600Mhz) -150dBc 3x1
Combining Rack size
Antenna Cable
MIMO Panel MIMO Omni 1/2" 7/8"
Sector Wing Wing 15 430 11600 4000
Basement Floor Sector-1
Ground Floor Sector-1
1st Floor Sector-2
2nd Floor Sector-2
3rd Floor Sector-3
4th Floor Sector-3
5th Floor Sector-4
6th Floor Sector-4
7th Floor Sector-5
8th Floor Sector-5
9th Floor Sector-5
0 0 0 0
LULU MALL , LUCKNOW

Coupler Splitter Connector Jumper


5 10 2 3 4 Super Flex 1/2'' 7/8'' N-Male N-Female
120 70 90 270 14 100 2640 280 50 50

0 0 0 0 0 0 0 0 0 0
SITE NAME - LULU MALL , LUCKNOW

Plan
Sr. No. Floor Activity done Plan Start Date Completion
Date

Panel Antenna (in nos.) 9-Mar-24


Omini Antenna (in nos.) 9-Mar-24
2 way (in nos.) 9-Mar-24
3 way (in nos.) 9-Mar-24
4 way (in nos.) 9-Mar-24
6 db Coupler (in nos.) 9-Mar-24
10 db Coupler (in nos.) 9-Mar-24
1 SECOND FLOOR
1/2" CONNECTOR (in nos.) 9-Mar-24
7/8" CONNECTOR (in nos.) 9-Mar-24
1/2 Cable (in mtr) 9-Mar-24
7/8 Cable (in mtr) 9-Mar-24
Jumper (in nos.) 9-Mar-24
Tape (in nos.) 9-Mar-24
Tie (in nos.) 9-Mar-24
Remarks
SUPERVISOR - PRAVESH RAJPOOT

Remarks

11-Mar-24

12-Mar-24

13-Mar-24

14-Mar-24

18-Mar-24

19-Mar-24
9-Mar-24
Actual
(If any deviation in Actual Start
No. of days Completion Total
Plan & Completion Date
Date
Date)

9-Mar-24 0 0 0 0 0 0 0 0
9-Mar-24 33 0 3 6 3 3 5 6
9-Mar-24 24 1 5 3 2 2 7 4
9-Mar-24 14 0 2 1 2 1 1 2
9-Mar-24 5 1 1 1 0 0 0 2
9-Mar-24 5 0 2 1 2 0 0 0
9-Mar-24 2 0 0 0 0 0 2 0
9-Mar-24 145 7 10 20 22 10 26 30
9-Mar-24 28 2 2 4 0 4 6 4
9-Mar-24 631 31 45 65 90 26 110 156
9-Mar-24 472 22 60 36 0 106 40 76
9-Mar-24 1 1 0 0 0 0 0 0
9-Mar-24 9 1 1 1 1 1 1 1
9-Mar-24 9 1 1 1 1 1 1 1
Level
20-Mar-24

21-Mar-24

22-Mar-24

23-Mar-24

24-Mar-24

25-Mar-24
Consumed Material % work completed
wise Remarks
completi
on %

0 0 0 100%
4 3 33 100%
0 0 24 100%
2 4 15 107%
0 0 5 100%
0 0 5 100%
0 0 2 100%
112%
10 10 145 100%
4 2 28 100%
40 68 631 100%
96 36 472 100%
0 0 1 100%
1 1 9 100%
1 1 9 100%
0 5%