DPR, Lulu Mall, Lucknow
DPR, Lulu Mall, Lucknow
Project Plan
Sr. No. Tower Details Work Description
Days Required Start Date
Material Supply
1 Supply of RF Material
2 Supply of Fibre Material
I&C
1 Basement Floor DAS Work 9-Mar-24
2 Ground Floor DAS Work 9-Mar-24
3 First Floor DAS Work 9-Mar-24
4 Second Floor DAS Work 9-Mar-24
5 Third Floor DAS Work 9-Mar-24
6 Fourth Floor DAS Work 9-Mar-24
7 Fifth Floor DAS Work 9-Mar-24
8 Sixth Floor DAS Work 9-Mar-24
9 Seventh Floor DAS Work 9-Mar-24
10 Eight Floor DAS Work 9-Mar-24
11 Ninth Floor DAS Work 9-Mar-24
12 Terrace Floor POLE/BTS/IBS ROOM 9-Mar-24
e Name : LULU MALL , LUCKNOW
ect Plan Actual Deployment
Remarks
Finish Date Start Date Finish Date
Description Planned (Quantity) Installed (Quantity)
Civil Pad
Installation of Poles Please take data with
Cable Tray Electrical & civil
SMPS Team
Battery Bank
Electrical Cabling
Completed
WIP
Permission WIP
No Permission
0 0 0 0 0 0 0 0 0 0
SITE NAME - LULU MALL , LUCKNOW
Plan
Sr. No. Floor Activity done Plan Start Date Completion
Date
Remarks
11-Mar-24
12-Mar-24
13-Mar-24
14-Mar-24
18-Mar-24
19-Mar-24
9-Mar-24
Actual
(If any deviation in Actual Start
No. of days Completion Total
Plan & Completion Date
Date
Date)
9-Mar-24 0 0 0 0 0 0 0 0
9-Mar-24 33 0 3 6 3 3 5 6
9-Mar-24 24 1 5 3 2 2 7 4
9-Mar-24 14 0 2 1 2 1 1 2
9-Mar-24 5 1 1 1 0 0 0 2
9-Mar-24 5 0 2 1 2 0 0 0
9-Mar-24 2 0 0 0 0 0 2 0
9-Mar-24 145 7 10 20 22 10 26 30
9-Mar-24 28 2 2 4 0 4 6 4
9-Mar-24 631 31 45 65 90 26 110 156
9-Mar-24 472 22 60 36 0 106 40 76
9-Mar-24 1 1 0 0 0 0 0 0
9-Mar-24 9 1 1 1 1 1 1 1
9-Mar-24 9 1 1 1 1 1 1 1
Level
20-Mar-24
21-Mar-24
22-Mar-24
23-Mar-24
24-Mar-24
25-Mar-24
Consumed Material % work completed
wise Remarks
completi
on %
0 0 0 100%
4 3 33 100%
0 0 24 100%
2 4 15 107%
0 0 5 100%
0 0 5 100%
0 0 2 100%
112%
10 10 145 100%
4 2 28 100%
40 68 631 100%
96 36 472 100%
0 0 1 100%
1 1 9 100%
1 1 9 100%
0 5%