TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BARANG & JASA

UNTUK MATERIAL LANGSUNG (BAHAN BAKU )

Nama Penyedia Barang/Jasa : CV. ABDI GUNA


Hasil Produksi :
Jenis Produksi :
Spesifikasi :
Standar :

Negara Asal
Satuan Bahan
No Uraian Spesifikasi Pemasok TKDN(%) Jumlah Harga Satuan Material
Baku

(1) (2) (3) (4) (5) (6) (7) (8) (9)

I PEKERJAAN PERSIAPAN
Mobilisasi dan Demobilisasi - Ina 100% 1.00 - 15,000,000.00
Pekerjaan Pemasangan Bouwplank Ina 100% 1.00 - 19,295,320.66
Kayu balok kelas III uk.5x7 cm Lokal Ina 100% 2.05 m3 3,450,000.00
Paku 5 - 7 cm PT. Surveyor Indonesia Ina 59% 3.41 Kg 20,125.00
Kayu papan kelas III uk.3/20 cm Lokal Ina 100% 1.19 m3 3,450,000.00
Pembersihan Awal dan Akhir Ina 100% 1.00 - 5,000,000.00
Pembongkaran Pagar Lama dan Pembuangan Sisa
Ina 100% 1.00 - 10,000,000.00
Pembongkaran
Pembuatan Gudang dan Direksi Keet Ina 100% 1.00 - 10,000,000.00
Papan Nama Proyek Ina 100% 1.00 - 250,000.00
Pelaporan dan Dokumentasi Ina 100% 1.00 - 5,000,000.00
Asbuilt Drawing Ina 100% 1.00 - 7,500,000.00
Penyiapan Air Kerja
PENYEDIAAN SMK3
Penyiapan Formulir Ina 100% 1.00 - 2,000,000.00
Papan Informasi K3 Ina 100% 1.00 - 250,000.00
APD (Helm, Rompi Keselamatan, Safety Boots, Sarung
Ina 100% 1.00 - 3,000,000.00
Tangan)
Asuransi Ina 100% 1.00 - 7,881,220.50
Petugas K3 Ina 100% 1.00 - 2,500,000.00
Peralatan P3K Ina 100% 1.00 - 3,000,000.00
Rambu Informasi Ina 100% 1.00 - 250,000.00
Bendera K3 Ina 100% 1.00 - 250,000.00
Konsultasi dengan Ahli Ina 100% 1.00 - 5,000,000.00
PEKERJAAN TANAH DAN PONDASI
Pas. Pondasi Batu Kali Camp.14
Batu Kali/Batu Belah Lokal Ina 100% 92.04 M3 250,000.00
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 12,502.10 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 39.88 M3 259,000.00
Perbaikan Pondasi Talud Camp 14
Batu Kali/Batu Belah Lokal Ina 100% 32.77 M3 250,000.00
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 4,451.53 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 14.20 M3 259,000.00
Timbunan Tanah Pondasi Talud
Tanah urug pilihan Lokal Ina 100% 20.86 M3 400,000.00
PEKERJAAN BETON
Sloof 15 x 20
Bekisting Kayu Kelas II (2x Pakai)
Kayu Kelas III Lokal Ina 100% 7.94 M3 3,450,000.00
Paku Kayu PT. Surveyor Indonesia Ina 59% 52.93 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 17.64 Liter 15,000.00
Tulangan Besi Beton Dia. 6mm U-24
Besi beton polos PT. Sucofindo Ina 60% 452.52 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 6.46 Kg 28,750.00
Tulangan Besi Beton Dia. 10mm U-24
Besi beton polos PT. Sucofindo Ina 60% 1,714.38 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 24.49 Kg 28,750.00
Beton K175
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 2,529.76 Kg 2,200.00
Pasir Beton (kg) Lokal Ina 100% 5,897.60 Kg 246.43
Kerikil maks 30 mm (kg) Lokal Ina 100% 7,985.04 Kg 333.33
Air Lokal Ina 100% 1,668.40 Liter 100.00
Kolom 30 x 50
Bekisting Kayu Kelas II (2x Pakai)
Kayu Kelas III Lokal Ina 100% 5.07 M3 3,450,000.00
Paku Kayu PT. Surveyor Indonesia Ina 59% 50.69 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 25.34 Liter 15,000.00
Kayu Kelas II Lokal Ina 100% 1.90 M3 3,738,000.00
Plywood 9 mm Lokal Ina 100% 44.35 Lbr 149,500.00
Kayu Dolken Lokal Ina 100% 253.44 Btg 15,000.00
Tulangan Besi Beton Dia. 6mm U-24
Besi beton polos PT. Sucofindo Ina 60% 197.72 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 2.82 Kg 28,750.00
Tulangan Besi Beton Dia. 10mm U-24
Besi beton polos PT. Sucofindo Ina 60% 540.73 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 7.72 Kg 28,750.00
Beton K175
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 3,087.22 Kg 2,200.00
Pasir Beton (kg) Lokal Ina 100% 7,197.20 Kg 246.43
Kerikil maks 30 mm (kg) Lokal Ina 100% 9,744.63 Kg 333.33
Air Lokal Ina 100% 2,036.05 Liter 100.00
Kolom 20 x 20
Bekisting Kayu Kelas II (2x Pakai)
Kayu Kelas III Lokal Ina 100% 5.07 M3 3,450,000.00
Paku Kayu PT. Surveyor Indonesia Ina 59% 50.69 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 25.34 Liter 15,000.00
Kayu Kelas II Lokal Ina 100% 1.90 M3 3,738,000.00
Plywood 9 mm Lokal Ina 100% 44.35 Lbr 149,500.00
Kayu Dolken Lokal Ina 100% 253.44 Btg 15,000.00
Tulangan Besi Beton Dia. 6mm U-24
Besi beton polos PT. Sucofindo Ina 60% 432.58 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 6.18 Kg 28,750.00
Tulangan Besi Beton Dia. 10mm U-24
Besi beton polos PT. Sucofindo Ina 60% 185.93 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 2.66 Kg 28,750.00
Beton K175
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 1,326.82 Kg 2,200.00
Pasir Beton (kg) Lokal Ina 100% 3,093.20 Kg 246.43
Kerikil maks 30 mm (kg) Lokal Ina 100% 4,188.03 Kg 333.33
Air Lokal Ina 100% 875.05 Liter 100.00
Pekerjaan Kolom Praktis 11/11
Kayu Kelas III Lokal Ina 100% 0.46 M3 3,450,000.00
Paku 5 - 12 cm PT. Surveyor Indonesia Ina 59% 2.28 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 34.20 Liter 15,000.00
Besi beton polos PT. Sucofindo Ina 60% 684.00 Kg 20,000.00
Kawat Beton PT. Sucofindo Ina 53% 102.60 Kg 28,750.00
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 912.00 Kg 2,200.00
Pasir Beton (m3) Lokal Ina 100% 1.37 M3 259,000.00
Kerikil pecah 1/2 cm Lokal Ina 100% 2.05 M3 450,000.00
Pekerjaan Balok Praktis 11/15
Kayu Kelas III Lokal Ina 100% 0.88 M3 3,450,000.00
Paku 5 - 12 cm PT. Surveyor Indonesia Ina 59% 4.41 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 66.16 Liter 15,000.00
Besi beton polos PT. Sucofindo Ina 60% 1,323.18 Kg 20,000.00
Kawat Beton PT. Sucofindo Ina 53% 198.48 Kg 28,750.00
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 1,764.24 Kg 2,200.00
Pasir Beton (m3) Lokal Ina 100% 2.65 M3 259,000.00
Kerikil pecah 1/2 cm Lokal Ina 100% 3.97 M3 450,000.00
Beton Papan nama
Bekisting Kayu Kelas II (2x Pakai)
Kayu Kelas III Lokal Ina 100% 1.00 M3 3,450,000.00
Paku Kayu PT. Surveyor Indonesia Ina 59% 9.96 Kg 20,125.00
Minyak bekesting PT. Sucofindo Ina 84% 4.98 Liter 15,000.00
Kayu Kelas II Lokal Ina 100% 0.45 M3 3,738,000.00
Plywood 9 mm Lokal Ina 100% 8.72 Lbr 149,500.00
Kayu Dolken Lokal Ina 100% 49.82 Btg 15,000.00
Tulangan Besi Beton Dia. 10mm U-24
Besi beton polos PT. Sucofindo Ina 60% 161.09 Kg 20,000.00
Kawat beton PT. Sucofindo Ina 53% 2.30 Kg 28,750.00
Beton K175
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 446.62 Kg 2,200.00
Pasir Beton (kg) Lokal Ina 100% 1,041.20 Kg 246.43
Kerikil maks 30 mm (kg) Lokal Ina 100% 1,409.73 Kg 333.33
Air Lokal Ina 100% 294.55 Liter 100.00
PEKERJAAN PASANGAN
Pekerjaan Dinding
Pas. Dinding 1/2 Bata Camp.14 839.11
Batako Lokal Ina 100% 21,816.86 Bh 3,000.00
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 9,649.77 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 36.08 M3 259,000.00
Pas. Plesteran Pondasi Dinding, Sloof, Kolom Balok dan Profil
2,109.63
Camp. 14
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 13,164.09 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 50.63 M3 259,000.00

Pas. Acian Pondasi Dinding, Sloof, Kolom dan Ring Balok 2,109.63

Semen Portland PT. Semen Bosowa Maros Ina 89.75% 6,856.30 Kg 2,200.00
Profil List Beton 238.52
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 775.19 Kg 2,200.00
Pas. Plesteran Dinding, Kamport Camp. 14 27.74
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 119.84 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 0.17 M3 259,000.00
Pek. Pengecatan Pondasi, Dinding, Sloof, Kolom dan Ring
2,137.39
Balok
Plamir Tembok CV. Takino Ina 62.43% 213.74 Kg 12,420.00
Cat dasar tembok PT. ICI Paints Indonesia Ina 60.65% 213.74 Kg 22,540.00
Cat penutup PT. ICI Paints Indonesia Ina 59.83% 555.72 Kg 66,700.00
Kuas rol 2,5 cm PT. ICI Paints Indonesia Ina 32.13% 21.37 Bh 50,600.00
Ampelas CV. Arezou Intrade Ina 93.34% 1,068.70 Lbr 10,350.00
Pekerjaan Papan Nama Beton
Pas. Plesteran Dinding Beton dan Kolom Camp. 14 24.91
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 155.44 Kg 2,200.00
Pasir Pasang Lokal Ina 100% 0.60 M3 259,000.00
Pas. Acian Dinding Beton dan Kolom Camp. 14 12.45
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 40.46 Kg 2,200.00
Pek. Pengecatan Dinding Beton dan Kolom 12.45
Plamir Tembok CV. Takino Ina 62.43% 1.25 Kg 12,420.00
Cat dasar tembok PT. ICI Paints Indonesia Ina 60.65% 1.25 Kg 22,540.00
Cat penutup PT. ICI Paints Indonesia Ina 59.83% 3.24 Kg 66,700.00
Kuas rol 2,5 cm PT. ICI Paints Indonesia Ina 32.13% 0.12 Bh 50,600.00
Ampelas CV. Arezou Intrade Ina 93.34% 6.23 Lbr 10,350.00
Profil List Beton 12.68
Semen Portland PT. Semen Bosowa Maros Ina 89.75% 41.21 Kg 2,200.00
Pekerjaan Pas. Keramik 50 x 50 6.48
Keramik 50x50 cm PT. Muliakeramik Indahraya Ina 79.97% 6.80 Dos 111,280.00
Semen portland PT. Semen Bosowa Maros Ina 89.75% 64.80 Kg 2,200.00
Pasir pasang Lokal Ina 100% 0.29 M3 259,000.00
Semen warna PT. Sika Indonesia Ina 52.75% 3.24 Kg 17,940.00
Pas. Font Papan Nama Aluminium Bahan Stainless (Kantor
1.00 PT. Kepuh Kencana Arum Ina 61.59% 1.00 Ls 25,000,000.00
dan UGD)

165,782,225.20
DALAM NEGERI GABUNGAN BARANG & JASA
TERIAL LANGSUNG (BAHAN BAKU )

Biaya (Rp)
TKDN
KDN KLN TOTAL Barang (%)

(10)

15,000,000.00 - 15,000,000.00 Err:508


19,295,320.66 - 19,295,320.66 Err:508
7,056,216.00 - 7,056,216.00 Err:508
40,303.74 28,298.37 68,602.11 Err:508
4,116,126.00 - 4,116,126.00 Err:508
5,000,000.00 - 5,000,000.00 Err:508

10,000,000.00 - 10,000,000.00 Err:508

10,000,000.00 - 10,000,000.00 Err:508


250,000.00 - 250,000.00 Err:508
5,000,000.00 - 5,000,000.00 Err:508
7,500,000.00 - 7,500,000.00 Err:508

2,000,000.00 - 2,000,000.00 Err:508


250,000.00 - 250,000.00 Err:508

3,000,000.00 - 3,000,000.00 Err:508

7,881,220.50 - 7,881,220.50 Err:508


2,500,000.00 - 2,500,000.00 Err:508
3,000,000.00 - 3,000,000.00 Err:508
250,000.00 - 250,000.00 Err:508
250,000.00 - 250,000.00 Err:508
5,000,000.00 - 5,000,000.00 Err:508

23,010,000.00 - 23,010,000.00 Err:508


24,685,396.45 2,819,223.55 27,504,620.00 Err:508
10,329,956.00 - 10,329,956.00 Err:508

8,193,000.00 - 8,193,000.00 Err:508


8,789,545.99 1,003,820.02 9,793,366.01 Err:508
3,678,110.80 - 3,678,110.80 Err:508

8,342,400.00 - 8,342,400.00 Err:508

27,389,205.00 - 27,389,205.00 Err:508


625,767.26 439,368.50 1,065,135.76 Err:508
221,971.65 42,658.36 264,630.01 Err:508

5,390,400.38 3,659,969.63 9,050,370.01 Err:508


99,042.57 86,813.26 185,855.83 Err:508

20,421,658.83 13,865,881.18 34,287,540.01 Err:508


375,225.09 328,894.05 704,119.14 Err:508

4,995,011.12 570,460.88 5,565,472.00 Err:508


1,453,337.15 - 1,453,337.15 Err:508
2,661,680.00 - 2,661,680.00 Err:508
166,840.00 - 166,840.00 Err:508

17,487,360.00 - 17,487,360.00 Err:508


599,306.40 420,789.60 1,020,096.00 Err:508
318,878.21 61,281.80 380,160.01 Err:508
7,105,190.40 - 7,105,190.40 Err:508
6,630,624.00 - 6,630,624.00 Err:508
3,801,600.00 - 3,801,600.00 Err:508

2,355,181.08 1,599,118.92 3,954,300.00 Err:508


43,273.82 37,930.57 81,204.39 Err:508

6,441,163.85 4,373,416.16 10,814,580.01 Err:508


118,349.17 103,735.97 222,085.14 Err:508

6,095,715.89 696,168.11 6,791,884.00 Err:508


1,773,595.72 - 1,773,595.72 Err:508
3,248,210.00 - 3,248,210.00 Err:508
203,605.00 - 203,605.00 Err:508

17,487,360.00 - 17,487,360.00 Err:508


599,306.40 420,789.60 1,020,096.00 Err:508
318,878.21 61,281.80 380,160.01 Err:508
7,105,190.40 - 7,105,190.40 Err:508
6,630,624.00 - 6,630,624.00 Err:508
3,801,600.00 - 3,801,600.00 Err:508

5,152,881.05 3,498,698.96 8,651,580.01 Err:508


94,678.42 82,987.97 177,666.39 Err:508

2,214,845.81 1,503,834.20 3,718,680.01 Err:508


40,695.31 35,670.45 76,365.76 Err:508

2,619,806.09 299,197.91 2,919,004.00 Err:508


762,252.86 - 762,252.86 Err:508
1,396,010.00 - 1,396,010.00 Err:508
87,505.00 - 87,505.00 Err:508

1,573,200.00 - 1,573,200.00 Err:508


26,957.44 18,927.57 45,885.01 Err:508
430,304.40 82,695.60 513,000.00 Err:508
8,147,808.00 5,532,192.00 13,680,000.00 Err:508
1,571,921.78 1,377,828.23 2,949,750.01 Err:508
1,800,744.00 205,656.00 2,006,400.00 Err:508
354,312.00 - 354,312.00 Err:508
923,400.00 - 923,400.00 Err:508

3,043,314.00 - 3,043,314.00 Err:508


52,148.46 36,614.88 88,763.34 Err:508
832,412.54 159,972.47 992,385.01 Err:508
15,761,720.16 10,701,879.84 26,463,600.00 Err:508
3,040,841.31 2,665,372.45 5,706,213.76 Err:508
3,483,491.88 397,836.12 3,881,328.00 Err:508
685,407.24 - 685,407.24 Err:508
1,786,293.00 - 1,786,293.00 Err:508

3,437,580.00 - 3,437,580.00 Err:508


117,808.74 82,716.77 200,525.51 Err:508
62,683.53 12,046.48 74,730.01 Err:508
1,676,044.44 - 1,676,044.44 Err:508
1,303,415.75 - 1,303,415.75 Err:508
747,300.00 - 747,300.00 Err:508

1,918,916.00 1,302,904.01 3,221,820.01 Err:508


35,257.93 30,904.45 66,162.38 Err:508

881,851.19 100,712.81 982,564.00 Err:508


256,581.43 - 256,581.43 Err:508
469,910.00 - 469,910.00 Err:508
29,455.00 - 29,455.00 Err:508

65,450,580.00 - 65,450,580.00 Err:508


19,053,461.00 2,176,022.01 21,229,483.01 Err:508
9,345,168.07 - 9,345,168.07 Err:508

25,992,498.08 2,968,502.57 28,961,000.65 Err:508


13,113,460.08 - 13,113,460.08 Err:508

13,537,759.42 1,546,095.09 15,083,854.51 Err:508

1,530,612.66 174,805.35 1,705,418.01 Err:508


236,617.77 27,023.20 263,640.97 Err:508
43,107.96 - 43,107.96 Err:508

1,657,290.75 997,347.64 2,654,638.39 Err:508


2,921,921.14 1,895,755.93 4,817,677.07 Err:508
22,176,957.18 14,889,660.21 37,066,617.39 Err:508
347,492.17 734,027.18 1,081,519.35 Err:508
10,324,331.10 736,662.16 11,060,993.26 Err:508

306,913.13 35,051.36 341,964.49 Err:508


154,840.56 - 154,840.56 Err:508

79,893.21 9,124.30 89,017.51 Err:508

9,653.49 5,809.42 15,462.91 Err:508


17,019.79 11,042.52 28,062.31 Err:508
129,177.70 86,730.21 215,907.91 Err:508
2,024.10 4,275.61 6,299.71 Err:508
60,137.80 4,290.96 64,428.76 Err:508

81,369.15 9,292.86 90,662.01 Err:508

605,492.16 151,656.97 757,149.13 Err:508


127,947.60 14,612.40 142,560.00 Err:508
75,524.40 - 75,524.40 Err:508
30,661.26 27,464.35 58,125.61 Err:508

15,397,500.00 9,602,500.00 25,000,000.00 Err:508

620,011,914.23 94,856,301.80 714,868,216.03 87%


TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BAR
UNTUK PERALATAN (BARANG JADI)

Nama Penyedia Barang/Jasa : CV. ABDI GUNA


Hasil Produksi :
Jenis Produksi :
Spesifikasi :
Standar :

Negara Asal
Satuan
No Uraian Spesifikasi Pemasok TKDN(%) Jumlah Bahan
Baku

(1) (2) (3) (4) (5) (6) (7) (8)

1 0 Ina 0% 0
2 0 Ina
3
TOTAL
ALAM NEGERI GABUNGAN BARANG & JASA
PERALATAN (BARANG JADI)

Biaya (Rp)
TKDN
Harga Satuan
KDN KLN TOTAL Barang (%)

(9) (10)

- - - #DIV/0!
- - - #DIV/0!
- - - #DIV/0!
0.00 0.00 0.00 #DIV/0!
TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BARANG & JASA
UNTUK MANAJEMEN PROYEK DAN PEREKAYASAAN

Nama Penyedia Barang/Jasa CV. ABDI GUNA


Alamat
Nama Jasa
Pengguna Barng/Jasa
No Dokumen Jasa

Biaya (
Warga Harga Satuan
No Uraian Kualifikasi TKDN(%) Jumlah Durasi
Negara Upah / bulan (Rp) KDN

(1) (2) (3) (4) (5) (6) (7) (9)


(8)

(5) x (6) x (7) x (8)

1 Ahli K3 Konstruksi Petugas K3 Ina 100% 1 8 2,500,000.00 20,000,000.00


Pelaksana Bangunan
2 Pelaksana Ina 100% 1 8 15,000,000.00 120,000,000.00
Gedung
-

SUB TOTAL 140,000,000.00


EN DALAM NEGERI GABUNGAN BARANG & JASA
NAJEMEN PROYEK DAN PEREKAYASAAN

Biaya (Rp)
TKDN Jasa (5)
KLN Total

(9) (10)

(100%-5) x (6) x (7) x (8) KDN + KLN

- 20,000,000.00 14%

- 120,000,000.00 86%

- - 0%

- - 0%

- - 0%

- - 0%

- - 0%

0.00 140,000,000.00 100%


TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BARANG & JA
UNTUK ALAT KERJA / FASILITAS KERJA

Nama Penyedia Barang/Jasa : CV. ABDI GUNA


Alamat :
Nama Jasa :
Pengguna Barng/Jasa :
No Dokumen Jasa :

Alat Kerja Biaya


Biay
Spesifikasi/ Satuan/
No Uraian Jumlah Depresiasi /
Pemasok Dibuat Dimiliki TKDN(%) Durasi KDN
Sewa Alat (Rp)

(1) (2) (3) (4) (5) (6) (7)

- (4) x (5) x (6) x (7)

PT. Komatsu
1 Exavator PC200-8 INA ya 25.49% 1.00 3.00 2,450,000.00 1,873,515.00
Indonesia

Pt. Hino Motors


2 Dum Truck Manufacturing INA ya 41.37% 2.00 3.00 2,450,000.00 6,081,390.00
indonesia

SUB TOTAL 7,954,905.00


N DALAM NEGERI GABUNGAN BARANG & JASA
ALAT KERJA / FASILITAS KERJA

Biaya (Rp)

TKDN Jasa
KLN TOTAL
(%)

(8) (9)

(100%-4) x (5) x (6) x (7) KDN + KLN

5,476,485.00 7,350,000.00 8%

8,618,610.00 14,700,000.00 28%

- - 0%

14,095,095.00 22,050,000.00 36%


TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BARANG & JASA
UNTUK KONSTRUKSI/FABRIKASI

Nama Penyedia Barang/Jasa CV. ABDI GUNA


Alam
at
Nama Jasa

Pengguna Barng/Jasa

No Dokumen Jasa

Warga Harga satuan Biaya (Rp)


No Uraian Kualifikasi TKDN(%) Jumlah Durasi
Negara Upah (Rp) KDN KLN
(100%-5) x (6) x (7) x
(1) (2) (3) (4) (5) (6) (7) (8) (5) x (6) x (7) x (8)
(8)
1 Operator Exavator 100% 2 3 3,000,000.00 18,000,000.00 -
2 Sopir Truck 100% 2 3 2,000,000.00 12,000,000.00 -
3 - -
4 - -
5 - -
6 - -
SUB TOTAL 30,000,000.00 -
LAM NEGERI GABUNGAN BARANG & JASA
KONSTRUKSI/FABRIKASI

Biaya (Rp)
TKDN Jasa
Total
KDN + KLN KDN + KLN
18,000,000.00 60%
12,000,000.00 40%
- 0%
- 0%
- 0%
- 0%
30,000,000.00 100%
TINGKAT KOMPONEN DALAM NEGERI GABUNGAN BARANG & JASA
UNTUK JASA UMUM

Nama Penyedia Barang/Jasa CV. ABDI GUNA

Alamat

Nama Jasa

Pengguna Barng/Jasa

No Dokumen Jasa

Harga Satuan Biaya


No Uraian Pemasok TKDN(%) Jumlah Satuan/ Durasi
(Rp) KDN
(1) (2) (3) (4) (5) (6) (7) (8
(4) x (5) x (6) x (7)

1.00 BPJS Tenaga Kerja JKK dan JKM 100% 1.00 3.00 2,627,073.50 7,881,220.50

2.00

3.00 -

4.00 -

5.00 -

6.00 -

SUB TOTAL 7,881,220.50


NEN DALAM NEGERI GABUNGAN BARANG & JASA
UNTUK JASA UMUM

Biaya (Rp)
TKDN Jasa (%)
KLN Total
(8) (9)
(100%-4) x (5) x (6) x (7) KDN + KLN

- 7,881,220.50 100%

0%

- - 0%

- - 0%

- - 0%

- - 0%

- 7,881,220.50 100%
REKAPITULASI PENILAIAN TKDN GABUNGAN BARANG dan JASA

Penyedia Barang/Jasa : CV. ABDI GUNA

Jenis Produksi :

Nama Pekerjaan :

Pemilik Pekerjaan :

No. Dokumen :

Nilai Gabungan Barang dan Jasa TKDN (%)


Uraian
KDN KLN Total Barang/Jasa
(1) (2) (3) (4) (5)

BARANG

1 Bahan baku untuk material langsung 620,011,914.23 94,856,301.80 714,868,216.03 0.36

2 Peralatan (Barang jadi) 863,584,599.75 129,537,689.96 993,122,289.71 0.51

Sub Total Barang 1,483,596,513.98 224,393,991.76 1,707,990,505.74 0.87

JASA

1 Manajemen Proyek dan Perekayasaan 140,000,000.00 - 140,000,000.00 0.70

2 Alat Kerja / Fasilitas Kerja 7,954,905.00 14,095,095.00 22,050,000.00 0.04

3 Konstruksi/Fabrikasi 30,000,000.00 - 30,000,000.00 0.15

4 Jasa Umum
7,881,220.50 - 7,881,220.50 0.04

Sub Total Jasa 185,836,125.50 14,095,095.00 199,931,220.50 0.93

Biaya produksi 1,669,432,639.48 238,489,086.76 1,907,921,726.24

Ternate, 3 Oktober 2023


Penawar,
CV. ABDI GUNA

MOH. ZAKY, ST
Direktur
NILAIAN TKDN GABUNGAN BARANG dan JASA

TKDN (%)

GaBUNGAN
(6)

88%

Ternate, 3 Oktober 2023


Penawar,
CV. ABDI GUNA

MOH. ZAKY, ST
Direktur
TKDN GABUNGAN BARANG dan JASA

(